# Al Kahfah PV IPP

Publisher: CapexCue
Canonical dossier: <https://capexcue.com/projects/al-kahfah-pv-ipp-also-described-as-the-al-kahfah-1425-mw-pv-project-306f62dd-75e/>
Dossier reference: release 1 (cf4b55e0-4bcd-417c-abb8-5826fcc535c2)

Released project intelligence

Oldest supporting observation: 2026-10-17T20:08:45.978824+00:00
Dossier released: 2026-10-17T20:14:08.761747+00:00
Source report dates and capture dates are listed per fact below; neither establishes an event date.

Original released project name: Al Kahfah PV IPP; also described as the Al Kahfah 1425 MW PV project.

## Project summary

Al Kahfah PV IPP is a reported 1,425 MW solar PV project in Al Kahfah, Central Region, Saudi Arabia, specified with bifacial panels and single-axis tracking. ACWA Power is reported as developer and responsible for construction and operation under a BOO model; the page also reports a 35-year PPA signed with SPPC. The listed commercial operations date is 30 November 2025, but the page does not confirm that operation was achieved.

## Evidence limits and unknowns

- The supplied project details do not confirm whether commercial operation was achieved by the listed date.
- The supplied project details do not document a current procurement route, active package, or buying window.

Current purchasing availability: unknown.
Source-dated plans do not establish current progress or available supplier packages.

## Project metadata

Country: Saudi Arabia
Region: Middle East North Africa
Physical assets: Solar PV
Derived from the exact released evidence; unresolved fields remain unclassified.

## Project category

Energy
Derived from the reviewed name statement; delivery stage remains unclassified.
Al Kahfah PV IPP; also described as the Al Kahfah 1425 MW PV project.
Source: www.acwapower.com — https://www.acwapower.com/en/what-we-do/projects/al-kahfah-pv/ | published unknown | observed 2026-10-17T20:08:45.978824+00:00

Project overview
Oldest decisive evidence: 2026-10-17T20:08:45.978824+00:00
Newest evidence: 2026-10-17T20:08:45.978824+00:00
Knowledge reviewed: 2026-10-17T20:12:23.954004+00:00
Publication reviewed: 2026-10-17T20:13:42.468291+00:00

## Date
Commercial operations date is listed as 30 November 2025; the source does not explicitly confirm whether commercial operation was achieved.
Status: reported
Attribution: www.acwapower.com
Source: www.acwapower.com — https://www.acwapower.com/en/what-we-do/projects/al-kahfah-pv/ | published unknown | observed 2026-10-17T20:08:45.978824+00:00

## Name
Al Kahfah PV IPP; also described as the Al Kahfah 1425 MW PV project.
Status: reported
Attribution: www.acwapower.com
Source: www.acwapower.com — https://www.acwapower.com/en/what-we-do/projects/al-kahfah-pv/ | published unknown | observed 2026-10-17T20:08:45.978824+00:00

## Scope
A 1,425 MW solar PV independent power project using bifacial panels with single-axis tracking.
Status: reported
Attribution: www.acwapower.com
Source: www.acwapower.com — https://www.acwapower.com/en/what-we-do/projects/al-kahfah-pv/ | published unknown | observed 2026-10-17T20:08:45.978824+00:00

## Sector
Renewable energy; solar PV power generation.
Status: reported
Attribution: www.acwapower.com
Source: www.acwapower.com — https://www.acwapower.com/en/what-we-do/projects/al-kahfah-pv/ | published unknown | observed 2026-10-17T20:08:45.978824+00:00

## Delivery
Build, Own, Operate (BOO) model; ACWA Power is responsible for construction and operation. The source also reports a 35-year Power Purchase Agreement signed with SPPC.
Status: reported
Attribution: www.acwapower.com
Source: www.acwapower.com — https://www.acwapower.com/en/what-we-do/projects/al-kahfah-pv/ | published unknown | observed 2026-10-17T20:08:45.978824+00:00

## Location
Al Kahfah, Central Region, Saudi Arabia (KSA).
Status: reported
Attribution: www.acwapower.com
Source: www.acwapower.com — https://www.acwapower.com/en/what-we-do/projects/al-kahfah-pv/ | published unknown | observed 2026-10-17T20:08:45.978824+00:00

## Developer
ACWA Power is developing the project.
Status: reported
Attribution: www.acwapower.com
Source: www.acwapower.com — https://www.acwapower.com/en/what-we-do/projects/al-kahfah-pv/ | published unknown | observed 2026-10-17T20:08:45.978824+00:00

## Contractor
The engineering, procurement and construction company is listed as Larsen & Toubro Limited L&T FZE.
Status: reported
Attribution: www.acwapower.com
Source: www.acwapower.com — https://www.acwapower.com/en/what-we-do/projects/al-kahfah-pv/ | published unknown | observed 2026-10-17T20:08:45.978824+00:00


## Cite this dossier

CapexCue — Al Kahfah PV IPP — dossier released 2026-10-17T20:14:08.761747+00:00, release 1 (cf4b55e0-4bcd-417c-abb8-5826fcc535c2) — https://capexcue.com/projects/al-kahfah-pv-ipp-also-described-as-the-al-kahfah-1425-mw-pv-project-306f62dd-75e/.