# CBI Ghana Tema LC3 cement expansion (IFC project 50039; company: Continental Blue Investment Ghana Limited).

Publisher: CapexCue
Canonical dossier: <https://capexcue.com/projects/cbi-ghana-tema-lc3-cement-expansion-ifc-project-50039-company-continental-blue-investment-ghana-limited-41e5e412-d0e/>
Dossier reference: release 1 (54f6f5e6-c804-4e6b-a0d2-ceacfd3756e9)

Released project intelligence

Oldest supporting observation: 2026-11-04T14:57:03+01:00
Dossier released: 2026-11-05T04:34:39.987972+00:00
Source report dates and capture dates are listed per fact below; neither establishes an event date.

## Project summary

IFC’s Summary of Investment Information identifies Continental Blue Investment Ghana Limited’s LC3 cement project in Ghana. It locates the plant in Tema, Accra; the calcined-clay deposit rights it mentions in Togorme, North Tongu District, Volta Region are a separate location. The SII describes a limestone calcined-clay plant with stated capacity of 400,000 tonnes per year. It separately reports a recently completed grinding-capacity expansion from 0.6 to 1.4 million tonnes per year, but does not date its completion; neither figure establishes actual production. For asset classification, the IFC sector field says Cement and the description concerns LC3 production: cement_plant, in the industrial_process category.

Financing figures are not procurement evidence: the SII describes a proposed IFC A-loan of up to US$20 million and a total project cost of US$66.7 million; it also displays a US$20.0 million loan under “IFC's Investment as Approved by the Board” and labels investment figures indicative. The record shows Status: Hold and an earlier “Approved: Nov 24, 2025” entry; these are financing-record entries, not physical-plant status. IFC lists Aug 27, 2025 as the SPI disclosure date, Sep 30, 2025 as the projected Board date, and May 6, 2026 as the last-updated date; its disclaimer says Board dates are estimates and it has not necessarily independently verified all project information. IFC’s disclosure states that authorization for public release had been given for project documentation or data included or attached.

Reading scope: The SII points to related ESRS and ESAP material; their contents are not summarized here.

## Evidence limits and unknowns

- The IFC SII does not establish the plant’s current operating status, utilization, or actual output.
- The SII does not establish a specific equipment package, tender, or open buying window.
- The SII says the grinding-capacity expansion was “recently completed” but does not provide its completion date.

Current purchasing availability: unknown.
Source-dated plans do not establish current progress or available supplier packages.

## Project metadata

Country: Ghana
Region: Sub Saharan Africa
Physical assets: Cement Plant
Derived from the exact released evidence; unresolved fields remain unclassified.

## Project category

Industrial processes
Derived from the reviewed source_unit statement; delivery stage remains unclassified.
Sector
Source: Supporting source — https://disclosures.ifc.org/project-detail/SII/50039/cbi-ghanalc3 | published unknown | observed unknown

Project overview
Oldest decisive evidence: 2026-11-04T14:57:03+01:00
Newest evidence: 2026-11-04T14:57:03+01:00
Knowledge reviewed: 2026-11-05T02:18:47.714148+00:00
Publication reviewed: 2026-11-05T02:20:50.909281+00:00

## Date
The SII lists Date SPI Disclosed as Aug 27, 2025; Projected Board Date as Sep 30, 2025 (the disclaimer says Board dates are estimates only); Previous Events as Approved: Nov 24, 2025; and Last Updated Date as May 6, 2026. The physical-project description says the grinding-capacity expansion was “recently completed” but does not date its completion. The SII disclaimer says IFC has not necessarily independently verified all project information.
Status: reported
Attribution: International Finance Corporation (externally supplied capture)
Source: International Finance Corporation (externally supplied capture) — https://disclosures.ifc.org/project-detail/SII/50039/cbi-ghanalc3 | published unknown | observed 2026-11-04T19:17:39.293512+00:00

## Name
CBI Ghana Tema LC3 cement expansion (IFC project 50039; company: Continental Blue Investment Ghana Limited).
Status: reported
Attribution: International Finance Corporation (externally supplied capture)
Source: International Finance Corporation (externally supplied capture) — https://disclosures.ifc.org/project-detail/SII/50039/cbi-ghanalc3 | published unknown | observed 2026-11-04T19:17:39.293512+00:00

## Scope
The SII describes a limestone calcined-clay production plant with stated capacity of 400,000 tonnes per year to support LC3 cement production. Separately, it says CBI recently completed a cement grinding-capacity expansion from 0.6 million to 1.4 million tonnes per year; the SII does not give the completion date. These are distinct capacity figures, and neither establishes actual production.
Status: reported
Attribution: International Finance Corporation (externally supplied capture)
Source: International Finance Corporation (externally supplied capture) — https://disclosures.ifc.org/project-detail/SII/50039/cbi-ghanalc3 | published unknown | observed 2026-11-04T19:17:39.293512+00:00

## Country
Ghana
Status: reported
Attribution: International Finance Corporation (externally supplied capture)
Source: International Finance Corporation (externally supplied capture) — https://disclosures.ifc.org/project-detail/SII/50039/cbi-ghanalc3 | published unknown | observed 2026-11-04T19:17:39.293512+00:00

## Location
The LC3 project plant is located in Tema, Accra. Separately, the SII says CBI owns rights to calcined-clay deposits in Togorme, North Tongu District, Volta Region, Ghana; this is a separate deposit location, not the stated Tema plant location.
Status: reported
Attribution: International Finance Corporation (externally supplied capture)
Source: International Finance Corporation (externally supplied capture) — https://disclosures.ifc.org/project-detail/SII/50039/cbi-ghanalc3 | published unknown | observed 2026-11-04T19:17:39.293512+00:00

## Financing Stage
The IFC record displays Status: Hold, with Last Updated Date May 6, 2026, and lists “Approved: Nov 24, 2025” under Previous Events. These are financing-record entries, not statements of physical plant status or equipment procurement.
Status: reported
Attribution: International Finance Corporation (externally supplied capture)
Source: International Finance Corporation (externally supplied capture) — https://disclosures.ifc.org/project-detail/SII/50039/cbi-ghanalc3 | published unknown | observed 2026-11-04T19:17:39.293512+00:00

## Financing Amount
The project description presents a proposed IFC A-loan of up to US$20 million. The SII states total project cost of US$66.7 million, financed with US$38 million debt including the IFC A-loan and US$28.7 million shareholder equity. The section titled “IFC's Investment as Approved by the Board” displays a US$20.0 million loan; the SII labels these investment figures indicative.
Status: reported
Attribution: International Finance Corporation (externally supplied capture)
Source: International Finance Corporation (externally supplied capture) — https://disclosures.ifc.org/project-detail/SII/50039/cbi-ghanalc3 | published unknown | observed 2026-11-04T19:17:39.293512+00:00


## Cite this dossier

CapexCue — CBI Ghana Tema LC3 cement expansion (IFC project 50039; company: Continental Blue Investment Ghana Limited). — dossier released 2026-11-05T04:34:39.987972+00:00, release 1 (54f6f5e6-c804-4e6b-a0d2-ceacfd3756e9) — https://capexcue.com/projects/cbi-ghana-tema-lc3-cement-expansion-ifc-project-50039-company-continental-blue-investment-ghana-limited-41e5e412-d0e/.

For current information and later dossier updates, visit <https://capexcue.com/projects/cbi-ghana-tema-lc3-cement-expansion-ifc-project-50039-company-continental-blue-investment-ghana-limited-41e5e412-d0e/>.