# Brno wastewater treatment project

Publisher: CapexCue
Canonical dossier: <https://capexcue.com/projects/brno-wastewater-treatment-project-97c0d6f6-34a/>
Dossier reference: release 1 (41821e96-5f4e-47f2-a898-b90849834841)

Released project intelligence

Oldest supporting observation: 2026-10-15T11:02:50.412450+00:00
Dossier released: 2026-10-15T14:02:16.849436+00:00
Source report dates and capture dates are listed per fact below; neither establishes an event date.

Original released project name: BRNO WASTEWATER TREATMENT PROJECT

## Project summary

BRNO WASTEWATER TREATMENT PROJECT covers a planned sludge-treatment upgrade at BVK’s Modřice wastewater plant, serving Brno in the Czech Republic. The work includes replacing the existing sludge facility, with planned changes to sludge production and volume, process energy efficiency and treated-wastewater quality. The EIB reports a signed CZK 1.3 billion (about €53.2 million) loan agreement with BVK; the related project listing dates the signing to 25/04/2024. The source does not report disbursement. Lower electricity use and greenhouse-gas emissions are stated as projected benefits, not achieved results. EIB advisory services supported technical aspects and the tender process.

## Evidence limits and unknowns

- The supplied source units do not state whether the loan has been disbursed, the current tender status or schedule, construction progress, technical specifications, defined supplier packages, or EPC arrangements.

Current purchasing availability: unknown.
Source-dated plans do not establish current progress or available supplier packages.

## Project metadata

Country: Czechia
Region: Europe
Physical assets: Wastewater Treatment
Derived from the exact released evidence; unresolved fields remain unclassified.

## Project category

Water and environment
Derived from the reviewed location statement; delivery stage remains unclassified.
BVK’s Modřice wastewater plant, serving the city of Brno.
Source: www.eib.org — https://www.eib.org/en/press/all/2024-186-czechia-eib-backs-improved-wastewater-treatment-with-czk-1-3-billion-loan-for-city-of-brno | published unknown | observed 2026-10-15T11:02:50.412450+00:00

Project overview
Oldest decisive evidence: 2026-10-15T11:02:50.412450+00:00
Newest evidence: 2026-10-15T11:02:50.412450+00:00
Knowledge reviewed: 2026-10-15T11:23:57.246200+00:00
Publication reviewed: 2026-10-15T14:02:16.267323+00:00

## Date
Signed 25/04/2024, as recorded in the related project listing.
Status: actual
Attribution: www.eib.org
Source: www.eib.org — https://www.eib.org/en/press/all/2024-186-czechia-eib-backs-improved-wastewater-treatment-with-czk-1-3-billion-loan-for-city-of-brno | published unknown | observed 2026-10-15T11:02:50.412450+00:00

## Name
BRNO WASTEWATER TREATMENT PROJECT
Status: reported
Attribution: www.eib.org
Source: www.eib.org — https://www.eib.org/en/press/all/2024-186-czechia-eib-backs-improved-wastewater-treatment-with-czk-1-3-billion-loan-for-city-of-brno | published unknown | observed 2026-10-15T11:02:50.412450+00:00

## Scope
Upgrade of the plant’s sludge-treatment process, including replacement of the outdated sewage-sludge facility; the project is planned to increase dried-sludge production, reduce treated-sludge volume, improve energy efficiency and improve treated-wastewater quality.
Status: planned
Attribution: www.eib.org
Source: www.eib.org — https://www.eib.org/en/press/all/2024-186-czechia-eib-backs-improved-wastewater-treatment-with-czk-1-3-billion-loan-for-city-of-brno | published unknown | observed 2026-10-15T11:02:50.412450+00:00

## Sector
Water and wastewater management.
Status: reported
Attribution: www.eib.org
Source: www.eib.org — https://www.eib.org/en/press/all/2024-186-czechia-eib-backs-improved-wastewater-treatment-with-czk-1-3-billion-loan-for-city-of-brno | published unknown | observed 2026-10-15T11:02:50.412450+00:00

## Country
Czech Republic (Czechia).
Status: reported
Attribution: www.eib.org
Source: www.eib.org — https://www.eib.org/en/press/all/2024-186-czechia-eib-backs-improved-wastewater-treatment-with-czk-1-3-billion-loan-for-city-of-brno | published unknown | observed 2026-10-15T11:02:50.412450+00:00

## Ecology
The replacement is stated to almost halve electricity consumption during treatment and substantially reduce greenhouse-gas emissions; these are projected project benefits, not reported results.
Status: planned
Attribution: www.eib.org
Source: www.eib.org — https://www.eib.org/en/press/all/2024-186-czechia-eib-backs-improved-wastewater-treatment-with-czk-1-3-billion-loan-for-city-of-brno | published unknown | observed 2026-10-15T11:02:50.412450+00:00

## Borrower
Brněnské vodárny a kanalizace (BVK), the municipal water and wastewater company.
Status: reported
Attribution: www.eib.org
Source: www.eib.org — https://www.eib.org/en/press/all/2024-186-czechia-eib-backs-improved-wastewater-treatment-with-czk-1-3-billion-loan-for-city-of-brno | published unknown | observed 2026-10-15T11:02:50.412450+00:00

## Location
BVK’s Modřice wastewater plant, serving the city of Brno.
Status: reported
Attribution: www.eib.org
Source: www.eib.org — https://www.eib.org/en/press/all/2024-186-czechia-eib-backs-improved-wastewater-treatment-with-czk-1-3-billion-loan-for-city-of-brno | published unknown | observed 2026-10-15T11:02:50.412450+00:00

## Procurement
EIB advisory services supported technical aspects and the tender process; tender status, schedule and supplier package availability are not stated.
Status: reported
Attribution: www.eib.org
Source: www.eib.org — https://www.eib.org/en/press/all/2024-186-czechia-eib-backs-improved-wastewater-treatment-with-czk-1-3-billion-loan-for-city-of-brno | published unknown | observed 2026-10-15T11:02:50.412450+00:00

## Financing Stage
Loan agreement signed; the related project listing records the status as “Signed | 25/04/2024.”
Status: actual
Attribution: www.eib.org
Source: www.eib.org — https://www.eib.org/en/press/all/2024-186-czechia-eib-backs-improved-wastewater-treatment-with-czk-1-3-billion-loan-for-city-of-brno | published unknown | observed 2026-10-15T11:02:50.412450+00:00

## Financing Amount
CZK 1.3 billion (about €53.2 million) EIB loan agreement with BVK; the source does not state disbursement.
Status: actual
Attribution: www.eib.org
Source: www.eib.org — https://www.eib.org/en/press/all/2024-186-czechia-eib-backs-improved-wastewater-treatment-with-czk-1-3-billion-loan-for-city-of-brno | published unknown | observed 2026-10-15T11:02:50.412450+00:00


## Cite this dossier

CapexCue — Brno wastewater treatment project — dossier released 2026-10-15T14:02:16.849436+00:00, release 1 (41821e96-5f4e-47f2-a898-b90849834841) — https://capexcue.com/projects/brno-wastewater-treatment-project-97c0d6f6-34a/.

For current information and later dossier updates, visit <https://capexcue.com/projects/brno-wastewater-treatment-project-97c0d6f6-34a/>.
This file records the release identified above; the current dossier may change.