{"name": "Hassyan IWP.", "slug": "hassyan-iwp-c0da6f59-bd3", "as_of": "2026-10-17T18:53:49.876328+00:00", "depth": "basic", "facts": {"date": {"value": "Commercial operations date: 15 February 2027.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/hassyan-iwp/", "name": "acwapower.com", "origin": "live", "checksum": "51a605f624d31065a4888ff194e368a2e15f7b9143a61c0a77e4bea4640743ba", "observed_at": "2026-10-17T18:36:47.717152+00:00", "revision_id": "12951c53-ad40-4cdb-a747-e97837a23591", "published_at": null}, "locator": "/html/head/main/div/section[4]/div/ul/li[8]", "claim_id": "9090b078-1d5b-4ed1-801a-7c1f61536fce", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "267581f2-8d01-4513-8c9f-93b9ec65024d", "valid_until": null, "assertion_id": "afc60f26-894f-4af3-bf6e-d927d5670805", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Hassyan IWP.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/hassyan-iwp/", "name": "acwapower.com", "origin": "live", "checksum": "51a605f624d31065a4888ff194e368a2e15f7b9143a61c0a77e4bea4640743ba", "observed_at": "2026-10-17T18:36:47.717152+00:00", "revision_id": "12951c53-ad40-4cdb-a747-e97837a23591", "published_at": null}, "locator": "/html/head/main/div/section[1]/div[1]/div/div/div/div/div[1]/h3", "claim_id": "c774bf4f-2bf6-44e4-ac07-9a15821402e6", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "31c46bd8-f334-44c1-ae3e-5095acf8b229", "valid_until": null, "assertion_id": "3887a570-0514-4ff1-b57b-eb72cf09fe7d", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Phase 1 of the Hassyan Sea Water Desalination Project: 180 million imperial gallons per day (MIGD) capacity using seawater reverse osmosis (SWRO), with seawater intake and outfall systems, electrical facilities, and potable water storage.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/hassyan-iwp/", "name": "acwapower.com", "origin": "live", "checksum": "51a605f624d31065a4888ff194e368a2e15f7b9143a61c0a77e4bea4640743ba", "observed_at": "2026-10-17T18:36:47.717152+00:00", "revision_id": "12951c53-ad40-4cdb-a747-e97837a23591", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "fb350760-baa5-4e3e-a88c-930afe7c1bd4", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "c87cd8bc-72ee-4b14-8dc2-0acc0c21d36e", "valid_until": null, "assertion_id": "24246b6f-56b1-4b39-b3a9-9e34a482eecb", "temporal_expression": "", "extraction_confidence": 0.9}, "delivery": {"value": "DEWA signed a 30-year water purchase agreement with ACWA Power; key facts list a 30-year BOO offtake contract.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/hassyan-iwp/", "name": "acwapower.com", "origin": "live", "checksum": "51a605f624d31065a4888ff194e368a2e15f7b9143a61c0a77e4bea4640743ba", "observed_at": "2026-10-17T18:36:47.717152+00:00", "revision_id": "12951c53-ad40-4cdb-a747-e97837a23591", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "567d74aa-338e-4f2e-954c-b08eee9923f9", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "c87cd8bc-72ee-4b14-8dc2-0acc0c21d36e", "valid_until": null, "assertion_id": "ce2616ad-9f6f-4004-bfe4-eb5e9f0cd83c", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Dubai, UAE; located next to the Hassyan Energy power plant.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/hassyan-iwp/", "name": "acwapower.com", "origin": "live", "checksum": "51a605f624d31065a4888ff194e368a2e15f7b9143a61c0a77e4bea4640743ba", "observed_at": "2026-10-17T18:36:47.717152+00:00", "revision_id": "12951c53-ad40-4cdb-a747-e97837a23591", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "fa8e2530-17a9-4530-a14c-b8f752cc862d", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "c87cd8bc-72ee-4b14-8dc2-0acc0c21d36e", "valid_until": null, "assertion_id": "303dbfc9-f6f1-4d93-9597-f5f53d35c79c", "temporal_expression": "", "extraction_confidence": 0.9}, "investment": {"value": "Reported project cost: US$936 million.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/hassyan-iwp/", "name": "acwapower.com", "origin": "live", "checksum": "51a605f624d31065a4888ff194e368a2e15f7b9143a61c0a77e4bea4640743ba", "observed_at": "2026-10-17T18:36:47.717152+00:00", "revision_id": "12951c53-ad40-4cdb-a747-e97837a23591", "published_at": null}, "locator": "/html/head/main/div/section[4]/div/ul/li[6]", "claim_id": "7eee57be-2f3f-4e9d-9e65-b78141837a7c", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "cba0cb32-4563-4f86-985b-453e81e1ceb0", "valid_until": null, "assertion_id": "c8b975c2-bc30-425d-84d6-1f1eff513b4b", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "c6b64eae-024b-4e06-823c-3b41251725c7", "publication": {"local_only": false, "reviewed_at": "2026-11-09T22:03:41.049042+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "research-imported-enriched-public-v1", "template_version": "dossier-v1"}, "interpretation": {"version": "ordinary-source-qualifications-v1", "unknowns": [], "attribution": "Hassyan Sea Water Reverse Osmosis (SWRO) plant; the report identifies Block A. (reported). Dubai Electricity and Water Authority (externally supplied capture), evidence received 2026-11-05; https://feeds.dfm.ae/documents/2026/May/12/8d373174-741d-4562-993b-c989e78e7639/PRL.Q1.2026.Eng.Vupload.Pdf.pdf\n\nDEWA reported that Block A had been commissioned by Q1 2026, adding 60 MIGD to water capacity. (actual). Dubai Electricity and Water Authority (externally supplied capture), evidence received 2026-11-05; https://feeds.dfm.ae/documents/2026/May/12/8d373174-741d-4562-993b-c989e78e7639/PRL.Q1.2026.Eng.Vupload.Pdf.pdf\n\nDEWA expected to add an additional 120 MIGD of SWRO capacity in 2026. The page does not clearly specify whether all of this expected capacity is attributable to Hassyan. (planned). Dubai Electricity and Water Authority (externally supplied capture), evidence received 2026-11-05; https://feeds.dfm.ae/documents/2026/May/12/8d373174-741d-4562-993b-c989e78e7639/PRL.Q1.2026.Eng.Vupload.Pdf.pdf", "relationships": [], "coverage_limitations": ["Canonical facts retain their original source scope. Later source qualifications do not redefine the original asset or establish open supplier procurement."]}, "public_summary": "Hassyan IWP is Phase 1 of the Hassyan Sea Water Desalination Project in Dubai, next to the Hassyan Energy power plant. ACWA Power describes a 180 MIGD seawater reverse osmosis (SWRO) facility, including seawater intake and outfall systems, electrical facilities and potable water storage. (ACWA Power, project description; page observed 17 October 2026.)\n\nACWA Power reports a 30-year water purchase agreement with DEWA and lists a 30-year BOO offtake contract. It reports project cost of US$936 million and gives 15 February 2027 as the planned commercial operations date; that date is a plan, not confirmation of achieved operations. (ACWA Power, project description and key facts; page observed 17 October 2026.)\n\nDEWA\u2019s Q1 2026 report identifies Block A of the Hassyan SWRO plant and reports that it had been commissioned by Q1 2026, adding 60 MIGD to water capacity. This block-level addition does not change the project\u2019s stated 180 MIGD Phase 1 scope. DEWA also expected to add a further 120 MIGD of SWRO capacity in 2026, but the report does not clearly establish that all of this expected capacity belongs to Hassyan. (DEWA, Q1 2026 report, p. 2; capture observed 5 November 2026.)\n\nReading-scope note: This summary uses ACWA Power\u2019s project page and page 2 of DEWA\u2019s four-page report. The other report pages and graphical content were not interpreted; no OCR was used. The DEWA capture date is an observation date, not a stated publication date.", "schema_version": "1.0", "public_unknowns": ["ACWA Power lists 15 February 2027 as the planned commercial operations date, but the reviewed material does not confirm whether that date was achieved or establish whole-plant acceptance. (ACWA Power, key facts; page observed 17 October 2026; DEWA, Q1 2026 report, p. 2.)", "DEWA\u2019s report does not clearly attribute all of the additional 120 MIGD expected in 2026 to Hassyan, and the reviewed page does not establish whether that expected capacity was subsequently added. (DEWA, Q1 2026 report, p. 2; capture observed 5 November 2026.)", "The reviewed material does not establish sustained plant output, current construction status, or an available procurement package or buying window. (ACWA Power, project page; DEWA, Q1 2026 report, p. 2.)"], "evidence_observed_at": "2026-11-05T16:31:49.756330+00:00", "knowledge_reviewed_at": "2026-11-09T22:03:41.049042+00:00", "decisive_evidence_observed_at": "2026-10-17T18:36:47.717152+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Hassyan IWP.", "original_project_title": "Hassyan IWP.", "canonical_url": "https://capexcue.com/projects/hassyan-iwp-c0da6f59-bd3/", "release": {"id": "077e8ff3-261c-4df3-9bdc-da4a2d51e8c5", "number": 2, "published_at": "2026-11-09T22:03:41.049042+00:00"}, "release_reference": "release 2 (077e8ff3-261c-4df3-9bdc-da4a2d51e8c5)", "current_dossier_url": "https://capexcue.com/projects/hassyan-iwp-c0da6f59-bd3/", "citation": "CapexCue \u2014 Hassyan IWP. \u2014 dossier released 2026-11-09T22:03:41.049042+00:00, release 2 (077e8ff3-261c-4df3-9bdc-da4a2d51e8c5) \u2014 https://capexcue.com/projects/hassyan-iwp-c0da6f59-bd3/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": null, "project_metadata": {"version": "released-metadata-v2", "category": null, "input_hash": "37c50e4e1f9d486d1f9256b47adbf54736c5d70f2aa503afa60bd82139cd83e6", "release_id": "077e8ff3-261c-4df3-9bdc-da4a2d51e8c5", "type_codes": [], "field_states": {"type": {"state": "blocked", "reason": "asset_type_prose_requires_review"}, "region": {"state": "blocked", "reason": "country_place_to_country_requires_grounded_review"}, "country": {"state": "blocked", "reason": "place_to_country_requires_grounded_review"}, "category": {"state": "blocked", "reason": "classification_prose_requires_review"}}, "region_codes": [], "release_hash": "a40aa20a1f836785d7e3f00ef07571c63421dd3d0ddc97d50c66371c50471bba", "assessment_id": "a88b740f-f00d-401d-8237-82967ef3c28c", "country_codes": [], "assessment_hash": "21ac0546c9e74802198e651a61a8b17294d4399f3bd9c0799d2688544899e53e", "country_label": "", "region_label": "", "type_labels": []}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}