{"name": "Pembroke Battery Storage; also referred to as the RWE Pembroke Battery project.", "slug": "pembroke-battery-storage-also-referred-to-as-the-rwe-pembroke-battery-project-0f001e6a-718", "as_of": "2026-10-15T11:02:17.772234+00:00", "depth": "basic", "facts": {"date": {"value": "Press-release dateline: Pembroke, 1 December 2025.", "rights": "facts_only", "source": {"url": "https://uk.rwe.com/press-and-news/2025-12-01-rwe-to-build-its-largest-battery-energy-storage-facility-in-the-uk/", "name": "uk.rwe.com", "origin": "live", "checksum": "2fd3e73f9419a05045023b0734f77e69793d18324bd5b37f4a2bea0319f8f200", "observed_at": "2026-10-15T10:59:33.141142+00:00", "revision_id": "03146140-230c-48e2-840e-d47e46c335b1", "published_at": null}, "locator": "/html/body/div[1]/div[2]/div[4]/div/main/section[1]/div/div/section/section/div/div/div/div[2]/h3", "claim_id": "f0eeaafd-9b24-4691-8e05-c9b4dd037d73", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "uk.rwe.com", "evidence_id": "0b402967-0062-44a9-895c-ed308acbe82b", "valid_until": null, "assertion_id": "49be4030-6bcd-487b-8da0-223d7cec1057", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Pembroke Battery Storage; also referred to as the RWE Pembroke Battery project.", "rights": "facts_only", "source": {"url": "https://uk.rwe.com/press-and-news/2025-12-01-rwe-to-build-its-largest-battery-energy-storage-facility-in-the-uk/", "name": "uk.rwe.com", "origin": "live", "checksum": "2fd3e73f9419a05045023b0734f77e69793d18324bd5b37f4a2bea0319f8f200", "observed_at": "2026-10-15T10:59:33.141142+00:00", "revision_id": "03146140-230c-48e2-840e-d47e46c335b1", "published_at": null}, "locator": "/html/body/div[1]/div[2]/div[4]/div/main/section[1]/div/div/section/section/div/div/div/div[2]/div[2]/p[1]", "claim_id": "c9156655-f015-468b-8218-68fb66eafc87", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "uk.rwe.com", "evidence_id": "de7c7923-3567-405a-933b-702f155ce803", "valid_until": null, "assertion_id": "a4962906-dde8-422b-babb-4ac1e5962dc5", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Planned battery energy storage system comprising 212 lithium-ion battery containers, with two-hour storage, up to 350 MW peak output and 700 MWh storage capacity; the release says the output and capacity figures apply once constructed and fully operational.", "rights": "facts_only", "source": {"url": "https://uk.rwe.com/press-and-news/2025-12-01-rwe-to-build-its-largest-battery-energy-storage-facility-in-the-uk/", "name": "uk.rwe.com", "origin": "live", "checksum": "2fd3e73f9419a05045023b0734f77e69793d18324bd5b37f4a2bea0319f8f200", "observed_at": "2026-10-15T10:59:33.141142+00:00", "revision_id": "03146140-230c-48e2-840e-d47e46c335b1", "published_at": null}, "locator": "/html/body/div[1]/div[2]/div[4]/div/main/section[1]/div/div/section/section/div/div/div/div[1]/div[2]/ul/li[1]", "claim_id": "a169836b-ceeb-4dac-a767-5fef7de08bab", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "uk.rwe.com", "evidence_id": "9f0e6a83-f86c-4f3e-ae32-3b427b591a4e", "valid_until": null, "assertion_id": "a8c43aed-7362-4c7e-ae5a-6d375168b8e4", "temporal_expression": "", "extraction_confidence": 0.9}, "country": {"value": "United Kingdom.", "rights": "facts_only", "source": {"url": "https://uk.rwe.com/press-and-news/2025-12-01-rwe-to-build-its-largest-battery-energy-storage-facility-in-the-uk/", "name": "uk.rwe.com", "origin": "live", "checksum": "2fd3e73f9419a05045023b0734f77e69793d18324bd5b37f4a2bea0319f8f200", "observed_at": "2026-10-15T10:59:33.141142+00:00", "revision_id": "03146140-230c-48e2-840e-d47e46c335b1", "published_at": null}, "locator": "/html/body/div[1]/div[2]/div[4]/div/header/section/div/div/div/section/div/div/div/header/h1", "claim_id": "6fd988ca-6591-4242-a009-52318c0dff0f", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "uk.rwe.com", "evidence_id": "d8b56e62-eca0-490d-a551-297f66d56f4f", "valid_until": null, "assertion_id": "8e3c241b-a737-4819-8fcc-850152913b72", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "RWE describes the intended operation as storing surplus energy and feeding it into the national grid when required.", "rights": "facts_only", "source": {"url": "https://uk.rwe.com/press-and-news/2025-12-01-rwe-to-build-its-largest-battery-energy-storage-facility-in-the-uk/", "name": "uk.rwe.com", "origin": "live", "checksum": "2fd3e73f9419a05045023b0734f77e69793d18324bd5b37f4a2bea0319f8f200", "observed_at": "2026-10-15T10:59:33.141142+00:00", "revision_id": "03146140-230c-48e2-840e-d47e46c335b1", "published_at": null}, "locator": "/html/body/div[1]/div[2]/div[4]/div/main/section[1]/div/div/section/section/div/div/div/div[2]/div[2]/p[5]", "claim_id": "558b58d0-74b6-41af-9e4d-0b32ff987f93", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "uk.rwe.com", "evidence_id": "fc979da6-115a-490e-8cf8-59af764991ab", "valid_until": null, "assertion_id": "042124ed-0703-4e65-a0ea-a52b673de052", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Planned for a 5.1-hectare area south of RWE\u2019s Pembroke Power Station, in the Pembroke area of South Wales.", "rights": "facts_only", "source": {"url": "https://uk.rwe.com/press-and-news/2025-12-01-rwe-to-build-its-largest-battery-energy-storage-facility-in-the-uk/", "name": "uk.rwe.com", "origin": "live", "checksum": "2fd3e73f9419a05045023b0734f77e69793d18324bd5b37f4a2bea0319f8f200", "observed_at": "2026-10-15T10:59:33.141142+00:00", "revision_id": "03146140-230c-48e2-840e-d47e46c335b1", "published_at": null}, "locator": "/html/body/div[1]/div[2]/div[4]/div/main/section[1]/div/div/section/section/div/div/div/div[2]/h3", "claim_id": "3d37161b-b658-4e64-a557-665d7a7333a1", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "uk.rwe.com", "evidence_id": "0b402967-0062-44a9-895c-ed308acbe82b", "valid_until": null, "assertion_id": "5326030b-fd36-4a3a-98f0-a90d6a50a462", "temporal_expression": "", "extraction_confidence": 0.9}, "developer": {"value": "RWE; the release describes Pembroke Battery Storage as RWE\u2019s project.", "rights": "facts_only", "source": {"url": "https://uk.rwe.com/press-and-news/2025-12-01-rwe-to-build-its-largest-battery-energy-storage-facility-in-the-uk/", "name": "uk.rwe.com", "origin": "live", "checksum": "2fd3e73f9419a05045023b0734f77e69793d18324bd5b37f4a2bea0319f8f200", "observed_at": "2026-10-15T10:59:33.141142+00:00", "revision_id": "03146140-230c-48e2-840e-d47e46c335b1", "published_at": null}, "locator": "/html/body/div[1]/div[2]/div[4]/div/main/section[1]/div/div/section/section/div/div/div/div[2]/div[2]/p[1]", "claim_id": "944493e3-1092-4b6d-bea8-66da21604ec3", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "uk.rwe.com", "evidence_id": "de7c7923-3567-405a-933b-702f155ce803", "valid_until": null, "assertion_id": "3d8c334d-f0b8-4694-8fbb-b0b79d4f1702", "temporal_expression": "", "extraction_confidence": 0.9}, "investment": {"value": "Described as a circa \u00a3200 million development.", "rights": "facts_only", "source": {"url": "https://uk.rwe.com/press-and-news/2025-12-01-rwe-to-build-its-largest-battery-energy-storage-facility-in-the-uk/", "name": "uk.rwe.com", "origin": "live", "checksum": "2fd3e73f9419a05045023b0734f77e69793d18324bd5b37f4a2bea0319f8f200", "observed_at": "2026-10-15T10:59:33.141142+00:00", "revision_id": "03146140-230c-48e2-840e-d47e46c335b1", "published_at": null}, "locator": "/html/body/div[1]/div[2]/div[4]/div/main/section[1]/div/div/section/section/div/div/div/div[2]/div[2]/p[1]", "claim_id": "075e24de-6c6f-4283-af17-6ae8966b6218", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "uk.rwe.com", "evidence_id": "de7c7923-3567-405a-933b-702f155ce803", "valid_until": null, "assertion_id": "de511ddc-0355-4c41-b655-9012792efd24", "temporal_expression": "", "extraction_confidence": 0.9}, "regulatory": {"value": "Planning consent reported received in January 2025 (described as January \u201cthis year\u201d in the 1 December 2025 release); the project also reportedly succeeded in the UK\u2019s latest Capacity Market auction, securing a route to market.", "rights": "facts_only", "source": {"url": "https://uk.rwe.com/press-and-news/2025-12-01-rwe-to-build-its-largest-battery-energy-storage-facility-in-the-uk/", "name": "uk.rwe.com", "origin": "live", "checksum": "2fd3e73f9419a05045023b0734f77e69793d18324bd5b37f4a2bea0319f8f200", "observed_at": "2026-10-15T10:59:33.141142+00:00", "revision_id": "03146140-230c-48e2-840e-d47e46c335b1", "published_at": null}, "locator": "/html/body/div[1]/div[2]/div[4]/div/main/section[1]/div/div/section/section/div/div/div/div[2]/h3", "claim_id": "9eceb8d1-3d78-4afa-be32-a383746fafdd", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "uk.rwe.com", "evidence_id": "0b402967-0062-44a9-895c-ed308acbe82b", "valid_until": null, "assertion_id": "2da4b7ef-c5ec-4bf8-89b4-19150eb50d83", "temporal_expression": "", "extraction_confidence": 0.9}, "next_milestone": {"value": "The release planned construction to start in the first half of 2026 and expected commissioning and operations in the second half of 2028, subject to receiving an updated and timely grid connection.", "rights": "facts_only", "source": {"url": "https://uk.rwe.com/press-and-news/2025-12-01-rwe-to-build-its-largest-battery-energy-storage-facility-in-the-uk/", "name": "uk.rwe.com", "origin": "live", "checksum": "2fd3e73f9419a05045023b0734f77e69793d18324bd5b37f4a2bea0319f8f200", "observed_at": "2026-10-15T10:59:33.141142+00:00", "revision_id": "03146140-230c-48e2-840e-d47e46c335b1", "published_at": null}, "locator": "/html/body/div[1]/div[2]/div[4]/div/main/section[1]/div/div/section/section/div/div/div/div[1]/div[2]/ul/li[3]", "claim_id": "1a015d1f-a357-4869-9bcf-ed37fea2b60f", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "uk.rwe.com", "evidence_id": "85b8f807-f64c-4ffa-9aa1-4f5787ea9845", "valid_until": null, "assertion_id": "3fd5bf4f-1502-4efa-8741-4fd14f9208c0", "temporal_expression": "", "extraction_confidence": 0.9}, "financing_stage": {"value": "Final investment decision taken.", "rights": "facts_only", "source": {"url": "https://uk.rwe.com/press-and-news/2025-12-01-rwe-to-build-its-largest-battery-energy-storage-facility-in-the-uk/", "name": "uk.rwe.com", "origin": "live", "checksum": "2fd3e73f9419a05045023b0734f77e69793d18324bd5b37f4a2bea0319f8f200", "observed_at": "2026-10-15T10:59:33.141142+00:00", "revision_id": "03146140-230c-48e2-840e-d47e46c335b1", "published_at": null}, "locator": "/html/body/div[1]/div[2]/div[4]/div/main/section[1]/div/div/section/section/div/div/div/div[1]/div[2]/ul/li[2]", "claim_id": "e1f08a9f-509b-418d-b1df-b5b4633977fb", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "uk.rwe.com", "evidence_id": "4f79f8f0-34a6-4c61-b855-110292c81d5f", "valid_until": null, "assertion_id": "90647893-4c99-4d23-bee0-1fdaa921ecff", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "c6e63231-76ed-43b2-b401-70e0e72ba3b2", "publication": {"local_only": false, "reviewed_at": "2026-10-16T11:34:37.520792+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "RWE\u2019s Pembroke Battery Storage project is planned for a 5.1-hectare area south of Pembroke Power Station in South Wales, United Kingdom. The planned system comprises 212 lithium-ion battery containers, with two-hour storage, up to 350 MW peak output and 700 MWh capacity; the release says those output and capacity figures apply once the system is constructed and fully operational. RWE describes the intended operation as storing surplus energy and feeding it into the national grid when required. \n\nIn a release dated 1 December 2025, RWE reported a final investment decision, planning consent received in January 2025 and success in the UK\u2019s latest Capacity Market auction. The release described the development as circa \u00a3200 million and planned construction to start in the first half of 2026, with commissioning and operations expected in the second half of 2028, subject to receiving an updated and timely grid connection. These are reported decisions and prospective, conditional dates; the release does not confirm that construction or commissioning occurred.", "schema_version": "1.0", "public_unknowns": ["The 1 December 2025 release does not confirm whether construction began as planned, whether the updated and timely grid connection was received, or whether commissioning or operations have occurred.", "The supplied release does not state whether supplier packages exist or whether procurement is open."], "evidence_observed_at": "2026-10-15T10:59:33.141142+00:00", "knowledge_reviewed_at": "2026-10-15T11:02:18.195569+00:00", "decisive_evidence_observed_at": "2026-10-15T10:59:33.141142+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Pembroke Battery Storage; also referred to as the RWE Pembroke Battery project.", "original_project_title": "Pembroke Battery Storage; also referred to as the RWE Pembroke Battery project.", "canonical_url": "https://capexcue.com/projects/pembroke-battery-storage-also-referred-to-as-the-rwe-pembroke-battery-project-0f001e6a-718/", "release": {"id": "268f162b-db7d-4432-beb2-a036c4c39306", "number": 1, "published_at": "2026-10-16T11:34:38.192029+00:00"}, "release_reference": "release 1 (268f162b-db7d-4432-beb2-a036c4c39306)", "current_dossier_url": "https://capexcue.com/projects/pembroke-battery-storage-also-referred-to-as-the-rwe-pembroke-battery-project-0f001e6a-718/", "citation": "CapexCue \u2014 Pembroke Battery Storage; also referred to as the RWE Pembroke Battery project. \u2014 dossier released 2026-10-16T11:34:38.192029+00:00, release 1 (268f162b-db7d-4432-beb2-a036c4c39306) \u2014 https://capexcue.com/projects/pembroke-battery-storage-also-referred-to-as-the-rwe-pembroke-battery-project-0f001e6a-718/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "independently_reviewed_metadata", "value": "energy", "support": {"end": 257, "start": 0, "sources": [{"url": "https://uk.rwe.com/press-and-news/2025-12-01-rwe-to-build-its-largest-battery-energy-storage-facility-in-the-uk/", "name": "uk.rwe.com", "origin": "live", "checksum": "2fd3e73f9419a05045023b0734f77e69793d18324bd5b37f4a2bea0319f8f200", "observed_at": "2026-10-15T10:59:33.141142+00:00", "revision_id": "03146140-230c-48e2-840e-d47e46c335b1", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "Planned battery energy storage system comprising 212 lithium-ion battery containers, with two-hour storage, up to 350 MW peak output and 700 MWh storage capacity; the release says the output and capacity figures apply once constructed and fully operational.", "statement": "Planned battery energy storage system comprising 212 lithium-ion battery containers, with two-hour storage, up to 350 MW peak output and 700 MWh storage capacity; the release says the output and capacity figures apply once constructed and fully operational.", "qualifications": {"attribution": "uk.rwe.com"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "independently_reviewed_metadata", "value": "energy", "support": {"end": 257, "start": 0, "sources": [{"url": "https://uk.rwe.com/press-and-news/2025-12-01-rwe-to-build-its-largest-battery-energy-storage-facility-in-the-uk/", "name": "uk.rwe.com", "origin": "live", "checksum": "2fd3e73f9419a05045023b0734f77e69793d18324bd5b37f4a2bea0319f8f200", "observed_at": "2026-10-15T10:59:33.141142+00:00", "revision_id": "03146140-230c-48e2-840e-d47e46c335b1", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "Planned battery energy storage system comprising 212 lithium-ion battery containers, with two-hour storage, up to 350 MW peak output and 700 MWh storage capacity; the release says the output and capacity figures apply once constructed and fully operational.", "statement": "Planned battery energy storage system comprising 212 lithium-ion battery containers, with two-hour storage, up to 350 MW peak output and 700 MWh storage capacity; the release says the output and capacity figures apply once constructed and fully operational.", "qualifications": {"attribution": "uk.rwe.com"}}}, "input_hash": "47b8e248c849d4105f0e08187a367765b5995c5d5394557a931964c620e1393f", "release_id": "268f162b-db7d-4432-beb2-a036c4c39306", "type_codes": ["battery_storage"], "field_states": {"type": {"state": "accepted", "reason": "The planned asset comprises 212 lithium-ion battery containers with two-hour storage, up to 350 MW peak output and 700 MWh capacity; the release qualifies that the output and capacity figures apply once constructed and fully operational. The cited nearby power station is not included as a project component."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "The asset is planned for a 5.1-hectare area south of RWE\u2019s Pembroke Power Station, in the Pembroke area of South Wales; the supplied country reference identifies the project\u2019s country as the United Kingdom."}, "category": {"state": "accepted", "reason": "The planned project is a battery energy storage system. The power station is identified as a nearby location, not as a project component."}}, "region_codes": ["europe"], "release_hash": "770b04f1c7b80392ac32bd6efcdf3ad4d094084dd153a9dd172edaefd619bbb7", "assessment_id": "eda2cb5e-1ff9-405b-badc-f2ee6a5fce87", "country_codes": ["GB"], "assessment_hash": "6ab76e20d2ec8ea0df5f021fa75c07c89d7b78c9565b1c381595597590535b7d", "country_label": "United Kingdom", "region_label": "Europe", "type_labels": ["Battery Storage"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}