{"name": "East Pye Solar", "slug": "rr22-east-pye", "as_of": "2026-10-01T03:30:05.131425+00:00", "depth": "basic", "facts": {"name": {"value": "East Pye Solar", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110014", "name": "Planning Inspectorate", "origin": "live", "checksum": "8cf13d0481b79e3dce4cd026ca4b2ed590d4b2bd247201f70c7063c5bb56d516", "observed_at": "2026-10-01T02:16:16.505373+00:00", "revision_id": "4a964237-bcc0-4c24-9338-4ebef5d8e4cc", "published_at": null}, "locator": "native-name-name", "claim_id": "574d1e53-4cf3-48ae-ad4c-eacc16cb2d2c", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "9bebd3ba-59b9-4bc0-902a-d5002555493f", "valid_until": null, "assertion_id": "0c3b2a86-aff4-4e39-b904-54b539bb31c1", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "The project comprises the construction, operation, maintenance and decommissioning of a solar photovoltaic (PV) electricity generating station and associated development, including a Battery Energy Storage System (BESS), ancillary infrastructure, customer substations and Grid Connection Infrastructure (including a new National Grid Substation). The project will have a generating capacity of 500MW", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110014", "name": "Planning Inspectorate", "origin": "live", "checksum": "8cf13d0481b79e3dce4cd026ca4b2ed590d4b2bd247201f70c7063c5bb56d516", "observed_at": "2026-10-01T02:16:16.505373+00:00", "revision_id": "4a964237-bcc0-4c24-9338-4ebef5d8e4cc", "published_at": null}, "locator": "native-scope-scope", "claim_id": "6947236c-eea6-43c8-af28-caf12916e927", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "d2f2fdba-26b8-4bd2-8447-1cf3136490ef", "valid_until": null, "assertion_id": "ac708184-f7e6-4382-a8b8-8d6fcd974da6", "temporal_expression": "", "extraction_confidence": 0.9}, "delivery": {"value": "This project is at the examination stage. During the examination stage, anyone who has registered to have their say can submit comments at the deadlines set out in the examination timetable. You may also attend hearings, if hearings are held.", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110014", "name": "Planning Inspectorate", "origin": "live", "checksum": "8cf13d0481b79e3dce4cd026ca4b2ed590d4b2bd247201f70c7063c5bb56d516", "observed_at": "2026-10-01T02:16:16.505373+00:00", "revision_id": "4a964237-bcc0-4c24-9338-4ebef5d8e4cc", "published_at": null}, "locator": "native-delivery-adverse_context", "claim_id": "56c725d6-fd7b-40ce-a130-31af488a26e2", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "3ef29243-8154-459c-8df3-a8b9dc19f9d8", "valid_until": null, "assertion_id": "c8cce1a8-bf17-49fd-adab-f1ec4c2cd998", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110014", "name": "Planning Inspectorate", "origin": "live", "checksum": "8cf13d0481b79e3dce4cd026ca4b2ed590d4b2bd247201f70c7063c5bb56d516", "observed_at": "2026-10-01T02:16:16.505373+00:00", "revision_id": "4a964237-bcc0-4c24-9338-4ebef5d8e4cc", "published_at": null}, "locator": "native-location-location", "claim_id": "be1cf976-5ccd-487d-be0c-9cf06aed68c2", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "fb961ec5-e129-4a17-a928-3e55281ab686", "valid_until": null, "assertion_id": "899f6122-8aa7-449c-8dbf-d5d7384d0ae8", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "ca4f5de6-77fa-4705-a48f-98ce16822bc4", "publication": {"local_only": false, "reviewed_at": "2026-10-16T09:01:02.965190+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "East Pye Solar is a proposed 500MW solar PV generating station with associated development, including battery storage and grid connection infrastructure. The proposed sites are south of Norwich and north of Harleston, with solar sites east of Long Stratton and a further cluster south of Great Moulton. The Planning Inspectorate source observation dated 1 October 2026 described the project as at examination stage.", "schema_version": "1.0", "public_unknowns": ["The examination-stage status is dated to the 1 October 2026 source observation; later project progress has not been verified.", "The supplied source does not establish a budget, appointed contractor, supplier package availability or an open procurement opportunity; the buying window is unknown.", "Review was limited to the supplied project-page paragraphs. Email-containing and link-only material, linked documents and graphical content were not reviewed."], "evidence_observed_at": "2026-10-01T02:16:16.505373+00:00", "knowledge_reviewed_at": "2026-10-16T09:01:02.965190+00:00", "decisive_evidence_observed_at": "2026-10-01T02:16:16.505373+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "East Pye Solar", "original_project_title": "East Pye Solar", "canonical_url": "https://capexcue.com/projects/rr22-east-pye/", "release": {"id": "3443651c-c9bc-4376-ab92-5c2d806def91", "number": 1, "published_at": "2026-10-16T09:01:03.442230+00:00"}, "release_reference": "release 1 (3443651c-c9bc-4376-ab92-5c2d806def91)", "current_dossier_url": "https://capexcue.com/projects/rr22-east-pye/", "citation": "CapexCue \u2014 East Pye Solar \u2014 dossier released 2026-10-16T09:01:03.442230+00:00, release 1 (3443651c-c9bc-4376-ab92-5c2d806def91) \u2014 https://capexcue.com/projects/rr22-east-pye/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 399, "start": 0, "sources": [{"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110014", "name": "Planning Inspectorate", "origin": "live", "checksum": "8cf13d0481b79e3dce4cd026ca4b2ed590d4b2bd247201f70c7063c5bb56d516", "observed_at": "2026-10-01T02:16:16.505373+00:00", "revision_id": "4a964237-bcc0-4c24-9338-4ebef5d8e4cc", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "The project comprises the construction, operation, maintenance and decommissioning of a solar photovoltaic (PV) electricity generating station and associated development, including a Battery Energy Storage System (BESS), ancillary infrastructure, customer substations and Grid Connection Infrastructure (including a new National Grid Substation). The project will have a generating capacity of 500MW", "statement": "The project comprises the construction, operation, maintenance and decommissioning of a solar photovoltaic (PV) electricity generating station and associated development, including a Battery Energy Storage System (BESS), ancillary infrastructure, customer substations and Grid Connection Infrastructure (including a new National Grid Substation). The project will have a generating capacity of 500MW", "qualifications": {"attribution": "Planning Inspectorate"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 399, "start": 0, "sources": [{"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110014", "name": "Planning Inspectorate", "origin": "live", "checksum": "8cf13d0481b79e3dce4cd026ca4b2ed590d4b2bd247201f70c7063c5bb56d516", "observed_at": "2026-10-01T02:16:16.505373+00:00", "revision_id": "4a964237-bcc0-4c24-9338-4ebef5d8e4cc", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "The project comprises the construction, operation, maintenance and decommissioning of a solar photovoltaic (PV) electricity generating station and associated development, including a Battery Energy Storage System (BESS), ancillary infrastructure, customer substations and Grid Connection Infrastructure (including a new National Grid Substation). The project will have a generating capacity of 500MW", "statement": "The project comprises the construction, operation, maintenance and decommissioning of a solar photovoltaic (PV) electricity generating station and associated development, including a Battery Energy Storage System (BESS), ancillary infrastructure, customer substations and Grid Connection Infrastructure (including a new National Grid Substation). The project will have a generating capacity of 500MW", "qualifications": {"attribution": "Planning Inspectorate"}}}, "input_hash": "3695286f6ce455d979e66ebeb9f78d01c11316ca71ca5b9684515f57d19cf6a1", "release_id": "3443651c-c9bc-4376-ab92-5c2d806def91", "type_codes": ["battery_storage", "electricity_transmission", "solar_pv"], "field_states": {"type": {"state": "accepted", "reason": "Norfolk locations near Norwich identify the United Kingdom; planned scope includes PV, BESS and a new grid substation."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Norfolk locations near Norwich identify the United Kingdom; planned scope includes PV, BESS and a new grid substation."}, "category": {"state": "accepted", "reason": "Norfolk locations near Norwich identify the United Kingdom; planned scope includes PV, BESS and a new grid substation."}}, "region_codes": ["europe"], "release_hash": "174934f1a50d3a057a40c9464913a3940edcff42fa7aee1ac461a074f795bec9", "assessment_id": "743272cb-623d-47b2-8c7d-9934f1bb95f4", "country_codes": ["GB"], "assessment_hash": "56a14a825a54d696d31cb33d4d494ca0a1a0d1d0e8e4b46ae5b8971af4dc9fd1", "country_label": "United Kingdom", "region_label": "Europe", "type_labels": ["Battery Storage", "Electricity Transmission", "Solar PV"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}