{"name": "25 MW Solar PV Power Plant (50 MWp) with 20 MW/50 MWh Battery Energy Storage System at Taru, Leh, Ladakh", "slug": "25-mw-solar-pv-power-plant-50-mwp-with-20-mw50-mwh-battery-energy-storage-system-at-taru-leh-ladakh-43e46d1c-2d6", "as_of": "2026-10-19T21:51:11.516388+00:00", "depth": "basic", "facts": {"date": {"value": "No construction-start or completion date is stated in the project heading or description.", "rights": "facts_only", "source": {"url": "https://www.seci.co.in/own-projects", "name": "Solar Energy Corporation of India Limited (externally supplied capture)", "origin": "snapshot", "checksum": "430a7fb53a9abfe2ee387f040c7867bbe6a0fc61dc3a568eeec7063e277e70a2", "observed_at": "2026-10-19T21:47:38.007788+00:00", "revision_id": "63f7e127-0be8-4295-8a53-f4e548bbc604", "published_at": null}, "locator": "/html/body/section[2]/div/div/div/div/div/p[16]", "claim_id": "b30459c6-b4da-49ca-9876-1e31216aca3d", "modality": "not_observed", "confidence": 0.9, "valid_from": null, "attribution": "Solar Energy Corporation of India Limited (externally supplied capture)", "evidence_id": "63c55fb3-f786-4f6c-88a7-bf0c9d2ba1cb", "valid_until": null, "assertion_id": "8c6adb02-7152-4e40-9dc3-00ccf75b8b3e", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "25 MW Solar PV Power Plant (50 MWp) with 20 MW/50 MWh Battery Energy Storage System at Taru, Leh, Ladakh", "rights": "facts_only", "source": {"url": "https://www.seci.co.in/own-projects", "name": "Solar Energy Corporation of India Limited (externally supplied capture)", "origin": "snapshot", "checksum": "430a7fb53a9abfe2ee387f040c7867bbe6a0fc61dc3a568eeec7063e277e70a2", "observed_at": "2026-10-19T21:47:38.007788+00:00", "revision_id": "63f7e127-0be8-4295-8a53-f4e548bbc604", "published_at": null}, "locator": "/html/body/section[2]/div/div/div/div/div/p[16]", "claim_id": "c696b563-08ed-447c-a129-7545d7a28ac0", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Solar Energy Corporation of India Limited (externally supplied capture)", "evidence_id": "63c55fb3-f786-4f6c-88a7-bf0c9d2ba1cb", "valid_until": null, "assertion_id": "b8ba3dcf-5967-44ed-abef-7f332f05855d", "temporal_expression": "", "extraction_confidence": 0.9}, "owner": {"value": "SECI presents the project on its Own Projects page within its own-project portfolio; the page describes that portfolio as self-owned projects under the CAPEX model. This is source attribution, not independent legal-title verification.", "rights": "facts_only", "source": {"url": "https://www.seci.co.in/own-projects", "name": "Solar Energy Corporation of India Limited (externally supplied capture)", "origin": "snapshot", "checksum": "430a7fb53a9abfe2ee387f040c7867bbe6a0fc61dc3a568eeec7063e277e70a2", "observed_at": "2026-10-19T21:47:38.007788+00:00", "revision_id": "63f7e127-0be8-4295-8a53-f4e548bbc604", "published_at": null}, "locator": "/html/body/section[1]/div/div/div/div/div/div/h1", "claim_id": "3ea6c8f0-e0df-442d-a891-0301a8f9b658", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Solar Energy Corporation of India Limited (externally supplied capture)", "evidence_id": "27ff9771-0ad8-4b33-8bd4-e4df0b1f2c92", "valid_until": null, "assertion_id": "253b95f4-4b18-4dd2-b6ad-e3104e7ee6c5", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Solar PV: 25 MW AC / 50 MWp DC; battery energy storage: 20 MW / 50 MWh. The page says the project will also supply power during non-solar hours.", "rights": "facts_only", "source": {"url": "https://www.seci.co.in/own-projects", "name": "Solar Energy Corporation of India Limited (externally supplied capture)", "origin": "snapshot", "checksum": "430a7fb53a9abfe2ee387f040c7867bbe6a0fc61dc3a568eeec7063e277e70a2", "observed_at": "2026-10-19T21:47:38.007788+00:00", "revision_id": "63f7e127-0be8-4295-8a53-f4e548bbc604", "published_at": null}, "locator": "/html/body/section[2]/div/div/div/div/div/p[16]", "claim_id": "4a9a4533-82be-4a94-bbde-68bb5772e65e", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Solar Energy Corporation of India Limited (externally supplied capture)", "evidence_id": "63c55fb3-f786-4f6c-88a7-bf0c9d2ba1cb", "valid_until": null, "assertion_id": "eed34217-0203-405d-a1b9-0a952bb02572", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "The individual project heading labels it \u201cUnder Construction\u201d; this is the page's reported status, not an independently verified current status.", "rights": "facts_only", "source": {"url": "https://www.seci.co.in/own-projects", "name": "Solar Energy Corporation of India Limited (externally supplied capture)", "origin": "snapshot", "checksum": "430a7fb53a9abfe2ee387f040c7867bbe6a0fc61dc3a568eeec7063e277e70a2", "observed_at": "2026-10-19T21:47:38.007788+00:00", "revision_id": "63f7e127-0be8-4295-8a53-f4e548bbc604", "published_at": null}, "locator": "/html/body/section[2]/div/div/div/div/div/p[16]", "claim_id": "d148b6c0-8ae2-48ee-bb1a-486d495260f7", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Solar Energy Corporation of India Limited (externally supplied capture)", "evidence_id": "63c55fb3-f786-4f6c-88a7-bf0c9d2ba1cb", "valid_until": null, "assertion_id": "f3556219-5d43-48e4-a92b-789ac7f6344b", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Taru, Leh, Ladakh", "rights": "facts_only", "source": {"url": "https://www.seci.co.in/own-projects", "name": "Solar Energy Corporation of India Limited (externally supplied capture)", "origin": "snapshot", "checksum": "430a7fb53a9abfe2ee387f040c7867bbe6a0fc61dc3a568eeec7063e277e70a2", "observed_at": "2026-10-19T21:47:38.007788+00:00", "revision_id": "63f7e127-0be8-4295-8a53-f4e548bbc604", "published_at": null}, "locator": "/html/body/section[2]/div/div/div/div/div/p[16]", "claim_id": "e1f6dc78-f4d3-4484-a3a0-84463fb28bca", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Solar Energy Corporation of India Limited (externally supplied capture)", "evidence_id": "63c55fb3-f786-4f6c-88a7-bf0c9d2ba1cb", "valid_until": null, "assertion_id": "99295b75-9902-474d-a747-06161ba2b466", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "cbd2139c-4b5a-421a-b2a2-87e151325567", "publication": {"local_only": false, "reviewed_at": "2026-10-19T22:14:07.975424+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "interpretation": {"version": "ordinary-source-qualifications-v1", "unknowns": [], "attribution": "Tender title: \u201cTender for Design, Engineering, Supply, Construction, Erection, Testing, Commissioning and O&M of 25 MW (AC) Solar PV Power Plant (50 MWp) with 20 MW/50 MWh Battery Energy Storage System at Taru, Leh.\u201d (reported). Solar Energy Corporation of India Limited (externally supplied capture), source observed 2026-10-19; https://www.seci.co.in/Upload/New/638647565126251519.pdf\n\nTender No. SECI/C&P/OP/11/014/2024-25; the results table identifies M/s Prozeal Green Energy Private Limited as \u201cSuccessful Bidder\u201d for the tendered scope. (reported). Solar Energy Corporation of India Limited (externally supplied capture), source observed 2026-10-19; https://www.seci.co.in/Upload/New/638647565126251519.pdf\n\nUnder \u201cTotal Price including GST (INR)\u201d: Schedule No. 1, \u201cPlant and Mandatory Spare Parts\u201d \u2014 INR 2,26,75,81,007.94; Schedule No. 2, \u201cFreight, Design, Civil & Installation Services\u201d \u2014 INR 58,32,05,227.24; Schedule No. 3, \u201cAbsolute Value of Operation & Maintenance\u201d \u2014 INR 28,05,12,160.60. \u201cAwarded Cost (SOR 1+SOR 2+SOR 3)\u201d \u2014 INR 313,12,98,395.78. (reported). Solar Energy Corporation of India Limited (externally supplied capture), source observed 2026-10-19; https://www.seci.co.in/Upload/New/638647565126251519.pdf", "relationships": [], "coverage_limitations": ["Canonical facts retain their original source scope. Later source qualifications do not redefine the original asset or establish open supplier procurement."]}, "public_summary": "SECI\u2019s Own Projects page lists a solar PV plant at Taru, Leh, Ladakh, with 25 MW AC / 50 MWp DC solar capacity and 20 MW / 50 MWh of battery storage. Its project entry labels the project \u201cUnder Construction\u201d; that is SECI\u2019s reported label, not independently verified current status. (SECI, \u201cOwn Projects,\u201d Taru project entry.)\n\nSECI includes the project on its Own Projects page, whose introduction describes the portfolio as self-owned CAPEX projects. This is SECI\u2019s description, not independent verification of legal title. (SECI, \u201cOwn Projects,\u201d portfolio introduction and Taru project entry.)\n\nThe SECI tender-results page identifies tender SECI/C&P/OP/11/014/2024-25 for design, engineering, supply, construction, erection, testing, commissioning and O&M of the Taru project. Its results table names M/s Prozeal Green Energy Private Limited as \u201cSuccessful Bidder.\u201d (SECI tender-results PDF, page 1, tender title and results table.)\n\nThe results table reports a total price including GST of INR 313,12,98,395.78: INR 2,26,75,81,007.94 for plant and mandatory spare parts, INR 58,32,05,227.24 for freight, design, civil and installation services, and INR 28,05,12,160.60 for O&M. The table labels the combined amount \u201cAwarded Cost\u201d; it is not evidence of an unpaid balance, current supplier budget or open package. (SECI tender-results PDF, page 1, results table.)", "schema_version": "1.0", "public_unknowns": ["The supplied project entry does not state a construction-start or completion date. The tender-results page does not state an award date, agreement-signature date, commissioning date, or whether the contract is currently effective. (SECI, \u201cOwn Projects,\u201d Taru project entry; SECI tender-results PDF, page 1.)", "The supplied project entry and tender-results page do not establish current progress or payment status, remaining work, open supplier packages, the O&M duration or current arrangement, or a buying window. (SECI, \u201cOwn Projects,\u201d Taru project entry; SECI tender-results PDF, page 1.)"], "evidence_observed_at": "2026-10-19T23:59:54+02:00", "knowledge_reviewed_at": "2026-10-19T22:14:07.975424+00:00", "decisive_evidence_observed_at": "2026-10-19T23:41:51+02:00", "export_metadata": {"publisher": "CapexCue", "project_title": "25 MW Solar PV Power Plant (50 MWp) with 20 MW/50 MWh Battery Energy Storage System at Taru, Leh, Ladakh", "original_project_title": "25 MW Solar PV Power Plant (50 MWp) with 20 MW/50 MWh Battery Energy Storage System at Taru, Leh, Ladakh", "canonical_url": "https://capexcue.com/projects/25-mw-solar-pv-power-plant-50-mwp-with-20-mw50-mwh-battery-energy-storage-system-at-taru-leh-ladakh-43e46d1c-2d6/", "release": {"id": "fb83e8ac-9b42-4683-b452-fdb4b0891b3f", "number": 2, "published_at": "2026-10-19T22:14:07.975424+00:00"}, "release_reference": "release 2 (fb83e8ac-9b42-4683-b452-fdb4b0891b3f)", "current_dossier_url": "https://capexcue.com/projects/25-mw-solar-pv-power-plant-50-mwp-with-20-mw50-mwh-battery-energy-storage-system-at-taru-leh-ladakh-43e46d1c-2d6/", "citation": "CapexCue \u2014 25 MW Solar PV Power Plant (50 MWp) with 20 MW/50 MWh Battery Energy Storage System at Taru, Leh, Ladakh \u2014 dossier released 2026-10-19T22:14:07.975424+00:00, release 2 (fb83e8ac-9b42-4683-b452-fdb4b0891b3f) \u2014 https://capexcue.com/projects/25-mw-solar-pv-power-plant-50-mwp-with-20-mw50-mwh-battery-energy-storage-system-at-taru-leh-ladakh-43e46d1c-2d6/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 144, "type": "battery_storage", "start": 0, "sources": [{"url": "https://www.seci.co.in/own-projects", "name": "Solar Energy Corporation of India Limited (externally supplied capture)", "origin": "snapshot", "checksum": "430a7fb53a9abfe2ee387f040c7867bbe6a0fc61dc3a568eeec7063e277e70a2", "observed_at": "2026-10-19T21:47:38.007788+00:00", "revision_id": "63f7e127-0be8-4295-8a53-f4e548bbc604", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Solar PV: 25 MW AC / 50 MWp DC; battery energy storage: 20 MW / 50 MWh. The page says the project will also supply power during non-solar hours.", "statement": "Solar PV: 25 MW AC / 50 MWp DC; battery energy storage: 20 MW / 50 MWh. The page says the project will also supply power during non-solar hours.", "qualifications": {"attribution": "Solar Energy Corporation of India Limited (externally supplied capture)"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 144, "type": "battery_storage", "start": 0, "sources": [{"url": "https://www.seci.co.in/own-projects", "name": "Solar Energy Corporation of India Limited (externally supplied capture)", "origin": "snapshot", "checksum": "430a7fb53a9abfe2ee387f040c7867bbe6a0fc61dc3a568eeec7063e277e70a2", "observed_at": "2026-10-19T21:47:38.007788+00:00", "revision_id": "63f7e127-0be8-4295-8a53-f4e548bbc604", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Solar PV: 25 MW AC / 50 MWp DC; battery energy storage: 20 MW / 50 MWh. The page says the project will also supply power during non-solar hours.", "statement": "Solar PV: 25 MW AC / 50 MWp DC; battery energy storage: 20 MW / 50 MWh. The page says the project will also supply power during non-solar hours.", "qualifications": {"attribution": "Solar Energy Corporation of India Limited (externally supplied capture)"}}}, "input_hash": "e858751ec8d125b1d9718f8447b8d9f133305d7a1b9434523ecea0bc5d90a486", "release_id": "fb83e8ac-9b42-4683-b452-fdb4b0891b3f", "type_codes": ["battery_storage", "solar_pv"], "field_states": {"type": {"state": "accepted", "reason": "supported_physical_components"}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Taru, Leh, Ladakh is in India; retain the stated PV and battery scope."}, "category": {"state": "accepted", "reason": "supported_asset_type_category"}}, "region_codes": ["asia"], "release_hash": "8936859002ee97879a11e7d8709d1bfe7fa6011df3856a6de0d2ccd8badeabd5", "assessment_id": "44506a11-7648-44b4-a820-c5c9ba96faa9", "country_codes": ["IN"], "assessment_hash": "86e244c4b6ea1dabbc1663896c6ebb0c130fdf0cc12e4f04f7f76d1d10b5ef25", "country_label": "India", "region_label": "Asia", "type_labels": ["Battery Storage", "Solar PV"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}