# 25 MW Solar PV Power Plant (50 MWp) with 20 MW/50 MWh Battery Energy Storage System at Taru, Leh, Ladakh

Publisher: CapexCue
Canonical dossier: <https://capexcue.com/projects/25-mw-solar-pv-power-plant-50-mwp-with-20-mw50-mwh-battery-energy-storage-system-at-taru-leh-ladakh-43e46d1c-2d6/>
Dossier reference: release 2 (fb83e8ac-9b42-4683-b452-fdb4b0891b3f)

Released project intelligence

Oldest supporting observation: 2026-10-19T23:41:51+02:00
Dossier released: 2026-10-19T22:14:07.975424+00:00
Source report dates and capture dates are listed per fact below; neither establishes an event date.

## Project summary

SECI’s Own Projects page lists a solar PV plant at Taru, Leh, Ladakh, with 25 MW AC / 50 MWp DC solar capacity and 20 MW / 50 MWh of battery storage. Its project entry labels the project “Under Construction”; that is SECI’s reported label, not independently verified current status. (SECI, “Own Projects,” Taru project entry.)

SECI includes the project on its Own Projects page, whose introduction describes the portfolio as self-owned CAPEX projects. This is SECI’s description, not independent verification of legal title. (SECI, “Own Projects,” portfolio introduction and Taru project entry.)

The SECI tender-results page identifies tender SECI/C&P/OP/11/014/2024-25 for design, engineering, supply, construction, erection, testing, commissioning and O&M of the Taru project. Its results table names M/s Prozeal Green Energy Private Limited as “Successful Bidder.” (SECI tender-results PDF, page 1, tender title and results table.)

The results table reports a total price including GST of INR 313,12,98,395.78: INR 2,26,75,81,007.94 for plant and mandatory spare parts, INR 58,32,05,227.24 for freight, design, civil and installation services, and INR 28,05,12,160.60 for O&M. The table labels the combined amount “Awarded Cost”; it is not evidence of an unpaid balance, current supplier budget or open package. (SECI tender-results PDF, page 1, results table.)

## Evidence limits and unknowns

- The supplied project entry does not state a construction-start or completion date. The tender-results page does not state an award date, agreement-signature date, commissioning date, or whether the contract is currently effective. (SECI, “Own Projects,” Taru project entry; SECI tender-results PDF, page 1.)
- The supplied project entry and tender-results page do not establish current progress or payment status, remaining work, open supplier packages, the O&M duration or current arrangement, or a buying window. (SECI, “Own Projects,” Taru project entry; SECI tender-results PDF, page 1.)

Current purchasing availability: unknown.
Source-dated plans do not establish current progress or available supplier packages.

## Project metadata

Country: India
Region: Asia
Physical assets: Battery Storage, Solar PV
Derived from the exact released evidence; unresolved fields remain unclassified.

## Project category

Energy
Derived from the reviewed scope statement; delivery stage remains unclassified.
Solar PV: 25 MW AC / 50 MWp DC; battery energy storage: 20 MW / 50 MWh. The page says the project will also supply power during non-solar hours.
Source: Solar Energy Corporation of India Limited (externally supplied capture) — https://www.seci.co.in/own-projects | published unknown | observed 2026-10-19T21:47:38.007788+00:00

Project overview
Oldest decisive evidence: 2026-10-19T23:41:51+02:00
Newest evidence: 2026-10-19T23:59:54+02:00
Knowledge reviewed: 2026-10-19T22:14:07.975424+00:00
Publication reviewed: 2026-10-19T22:14:07.975424+00:00

## Date
No construction-start or completion date is stated in the project heading or description.
Status: not_observed
Attribution: Solar Energy Corporation of India Limited (externally supplied capture)
Source: Solar Energy Corporation of India Limited (externally supplied capture) — https://www.seci.co.in/own-projects | published unknown | observed 2026-10-19T21:47:38.007788+00:00

## Name
25 MW Solar PV Power Plant (50 MWp) with 20 MW/50 MWh Battery Energy Storage System at Taru, Leh, Ladakh
Status: reported
Attribution: Solar Energy Corporation of India Limited (externally supplied capture)
Source: Solar Energy Corporation of India Limited (externally supplied capture) — https://www.seci.co.in/own-projects | published unknown | observed 2026-10-19T21:47:38.007788+00:00

## Owner
SECI presents the project on its Own Projects page within its own-project portfolio; the page describes that portfolio as self-owned projects under the CAPEX model. This is source attribution, not independent legal-title verification.
Status: reported
Attribution: Solar Energy Corporation of India Limited (externally supplied capture)
Source: Solar Energy Corporation of India Limited (externally supplied capture) — https://www.seci.co.in/own-projects | published unknown | observed 2026-10-19T21:47:38.007788+00:00

## Scope
Solar PV: 25 MW AC / 50 MWp DC; battery energy storage: 20 MW / 50 MWh. The page says the project will also supply power during non-solar hours.
Status: reported
Attribution: Solar Energy Corporation of India Limited (externally supplied capture)
Source: Solar Energy Corporation of India Limited (externally supplied capture) — https://www.seci.co.in/own-projects | published unknown | observed 2026-10-19T21:47:38.007788+00:00

## Activity
The individual project heading labels it “Under Construction”; this is the page's reported status, not an independently verified current status.
Status: reported
Attribution: Solar Energy Corporation of India Limited (externally supplied capture)
Source: Solar Energy Corporation of India Limited (externally supplied capture) — https://www.seci.co.in/own-projects | published unknown | observed 2026-10-19T21:47:38.007788+00:00

## Location
Taru, Leh, Ladakh
Status: reported
Attribution: Solar Energy Corporation of India Limited (externally supplied capture)
Source: Solar Energy Corporation of India Limited (externally supplied capture) — https://www.seci.co.in/own-projects | published unknown | observed 2026-10-19T21:47:38.007788+00:00


## Source qualifications and unresolved questions

- Canonical facts retain their original source scope. Later source qualifications do not redefine the original asset or establish open supplier procurement.

Tender title: “Tender for Design, Engineering, Supply, Construction, Erection, Testing, Commissioning and O&M of 25 MW (AC) Solar PV Power Plant (50 MWp) with 20 MW/50 MWh Battery Energy Storage System at Taru, Leh.” (reported). Solar Energy Corporation of India Limited (externally supplied capture), source observed 2026-10-19; https://www.seci.co.in/Upload/New/638647565126251519.pdf

Tender No. SECI/C&P/OP/11/014/2024-25; the results table identifies M/s Prozeal Green Energy Private Limited as “Successful Bidder” for the tendered scope. (reported). Solar Energy Corporation of India Limited (externally supplied capture), source observed 2026-10-19; https://www.seci.co.in/Upload/New/638647565126251519.pdf

Under “Total Price including GST (INR)”: Schedule No. 1, “Plant and Mandatory Spare Parts” — INR 2,26,75,81,007.94; Schedule No. 2, “Freight, Design, Civil & Installation Services” — INR 58,32,05,227.24; Schedule No. 3, “Absolute Value of Operation & Maintenance” — INR 28,05,12,160.60. “Awarded Cost (SOR 1+SOR 2+SOR 3)” — INR 313,12,98,395.78. (reported). Solar Energy Corporation of India Limited (externally supplied capture), source observed 2026-10-19; https://www.seci.co.in/Upload/New/638647565126251519.pdf

## Cite this dossier

CapexCue — 25 MW Solar PV Power Plant (50 MWp) with 20 MW/50 MWh Battery Energy Storage System at Taru, Leh, Ladakh — dossier released 2026-10-19T22:14:07.975424+00:00, release 2 (fb83e8ac-9b42-4683-b452-fdb4b0891b3f) — https://capexcue.com/projects/25-mw-solar-pv-power-plant-50-mwp-with-20-mw50-mwh-battery-energy-storage-system-at-taru-leh-ladakh-43e46d1c-2d6/.

For current information and later dossier updates, visit <https://capexcue.com/projects/25-mw-solar-pv-power-plant-50-mwp-with-20-mw50-mwh-battery-energy-storage-system-at-taru-leh-ladakh-43e46d1c-2d6/>.
This file records the release identified above; the current dossier may change.