{"name": "Nuevo Sistema Traspaso Andina", "slug": "nuevo-sistema-traspaso-andina-0c4f1b1a-d54", "as_of": "2026-10-17T12:17:28.238433+00:00", "depth": "basic", "facts": {"name": {"value": "Nuevo Sistema Traspaso Andina", "rights": "facts_only", "source": {"url": "https://www.codelco.com/proyectos/nuevo-sistema-traspaso-andina", "name": "www.codelco.com", "origin": "live", "checksum": "70d6ce481388d3ddcee85adba0b233b3950700598c7c307ef5f3d3646e2f4898", "observed_at": "2026-10-17T12:07:07.139266+00:00", "revision_id": "b455110e-ee85-414d-a5f8-5d82b409dfdc", "published_at": null}, "locator": "/html/body/div/section[2]/div/div[2]/div[1]/div[1]/h1", "claim_id": "9858d143-dac8-4594-9ab2-51236015e090", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.codelco.com", "evidence_id": "cdd361cd-dd53-4b06-ab96-76fa4c9760f9", "valid_until": null, "assertion_id": "3ebc7cd8-b930-4d72-9753-dbf1f316ffa8", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "A structural project described as replacing the existing primary crushing and ore-transport system because of a change in pit orientation. Scope includes a new primary crushing station and associated infrastructure at Nodo 3.500, plus a 4.8 km ore-conveyor tunnel to the existing concentrator at Planta Cordillera; the stated objective is to maintain the current processing level.", "rights": "facts_only", "source": {"url": "https://www.codelco.com/proyectos/nuevo-sistema-traspaso-andina", "name": "www.codelco.com", "origin": "live", "checksum": "70d6ce481388d3ddcee85adba0b233b3950700598c7c307ef5f3d3646e2f4898", "observed_at": "2026-10-17T12:07:07.139266+00:00", "revision_id": "b455110e-ee85-414d-a5f8-5d82b409dfdc", "published_at": null}, "locator": "/html/body/div/section[2]/div/div[2]/div[1]/div[1]/p", "claim_id": "f49cf67a-3d6a-42da-a3f4-59e59e942690", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.codelco.com", "evidence_id": "5c3d894b-18cc-46d6-9031-d8c1957e1cfa", "valid_until": null, "assertion_id": "edb8be57-d2c7-4084-9624-583a5eebbdef", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "The page labels the project \u201cOperando\u201d (operating); it reports that Phase 1 was inaugurated in January 2022, construction concluded in August 2025, and administrative closure followed in September 2025.", "rights": "facts_only", "source": {"url": "https://www.codelco.com/proyectos/nuevo-sistema-traspaso-andina", "name": "www.codelco.com", "origin": "live", "checksum": "70d6ce481388d3ddcee85adba0b233b3950700598c7c307ef5f3d3646e2f4898", "observed_at": "2026-10-17T12:07:07.139266+00:00", "revision_id": "b455110e-ee85-414d-a5f8-5d82b409dfdc", "published_at": null}, "locator": "/html/body/div/section[2]/div/div[2]/div[1]/div[2]/p[1]", "claim_id": "8a80c9b0-7ec3-42e6-bd02-1e6ffe52e680", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.codelco.com", "evidence_id": "2b1a11d7-476b-4a54-b5b6-57e22063d80b", "valid_until": null, "assertion_id": "4cc4cbb6-8bc1-4a8e-bae0-5852e3d4651a", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "The source identifies the sector Nodo 3.500 and Planta Cordillera, the existing concentrator reached by the described transport system; it does not state a broader project location.", "rights": "facts_only", "source": {"url": "https://www.codelco.com/proyectos/nuevo-sistema-traspaso-andina", "name": "www.codelco.com", "origin": "live", "checksum": "70d6ce481388d3ddcee85adba0b233b3950700598c7c307ef5f3d3646e2f4898", "observed_at": "2026-10-17T12:07:07.139266+00:00", "revision_id": "b455110e-ee85-414d-a5f8-5d82b409dfdc", "published_at": null}, "locator": "/html/body/div/section[2]/div/div[2]/div[1]/div[1]/p", "claim_id": "d0555256-653d-4ce4-a76d-ab06893b5a89", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.codelco.com", "evidence_id": "5c3d894b-18cc-46d6-9031-d8c1957e1cfa", "valid_until": null, "assertion_id": "c179bcbf-d9e9-467c-9c2c-ae2ee0536b69", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "cbf68835-4ef4-4dec-a0a4-4b449f91ccf9", "publication": {"local_only": false, "reviewed_at": "2026-10-17T12:18:53.931847+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Codelco describes a replacement system with a new primary crushing station at Nodo 3.500 and a 4.8 km ore-conveyor tunnel to Planta Cordillera, intended to maintain the current processing level. The page labels the project operating and reports Phase 1 inaugurated in January 2022; it also states construction concluded in August 2025, followed by administrative closure in September 2025.", "schema_version": "1.0", "public_unknowns": ["The supplied page capture, observed 2026-10-17, gives no publication date and does not state procurement or tender status, remaining supplier packages, or budget. It identifies Nodo 3.500 and Planta Cordillera but does not give a broader project location."], "evidence_observed_at": "2026-10-17T12:07:07.139266+00:00", "knowledge_reviewed_at": "2026-10-17T12:17:28.473912+00:00", "decisive_evidence_observed_at": "2026-10-17T12:07:07.139266+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Nuevo Sistema Traspaso Andina", "original_project_title": "Nuevo Sistema Traspaso Andina", "canonical_url": "https://capexcue.com/projects/nuevo-sistema-traspaso-andina-0c4f1b1a-d54/", "release": {"id": "daa37ec9-e4b4-4fb2-aeeb-9ef52b9b2d94", "number": 1, "published_at": "2026-10-17T12:19:18.865877+00:00"}, "release_reference": "release 1 (daa37ec9-e4b4-4fb2-aeeb-9ef52b9b2d94)", "current_dossier_url": "https://capexcue.com/projects/nuevo-sistema-traspaso-andina-0c4f1b1a-d54/", "citation": "CapexCue \u2014 Nuevo Sistema Traspaso Andina \u2014 dossier released 2026-10-17T12:19:18.865877+00:00, release 1 (daa37ec9-e4b4-4fb2-aeeb-9ef52b9b2d94) \u2014 https://capexcue.com/projects/nuevo-sistema-traspaso-andina-0c4f1b1a-d54/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "industrial_process", "support": {"end": 380, "start": 0, "sources": [{"url": "https://www.codelco.com/proyectos/nuevo-sistema-traspaso-andina", "name": "www.codelco.com", "origin": "live", "checksum": "70d6ce481388d3ddcee85adba0b233b3950700598c7c307ef5f3d3646e2f4898", "observed_at": "2026-10-17T12:07:07.139266+00:00", "revision_id": "b455110e-ee85-414d-a5f8-5d82b409dfdc", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "A structural project described as replacing the existing primary crushing and ore-transport system because of a change in pit orientation. Scope includes a new primary crushing station and associated infrastructure at Nodo 3.500, plus a 4.8 km ore-conveyor tunnel to the existing concentrator at Planta Cordillera; the stated objective is to maintain the current processing level.", "statement": "A structural project described as replacing the existing primary crushing and ore-transport system because of a change in pit orientation. Scope includes a new primary crushing station and associated infrastructure at Nodo 3.500, plus a 4.8 km ore-conveyor tunnel to the existing concentrator at Planta Cordillera; the stated objective is to maintain the current processing level.", "qualifications": {"attribution": "www.codelco.com"}}, "label": "Industrial processes", "icon": "project"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "industrial_process", "support": {"end": 380, "start": 0, "sources": [{"url": "https://www.codelco.com/proyectos/nuevo-sistema-traspaso-andina", "name": "www.codelco.com", "origin": "live", "checksum": "70d6ce481388d3ddcee85adba0b233b3950700598c7c307ef5f3d3646e2f4898", "observed_at": "2026-10-17T12:07:07.139266+00:00", "revision_id": "b455110e-ee85-414d-a5f8-5d82b409dfdc", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "A structural project described as replacing the existing primary crushing and ore-transport system because of a change in pit orientation. Scope includes a new primary crushing station and associated infrastructure at Nodo 3.500, plus a 4.8 km ore-conveyor tunnel to the existing concentrator at Planta Cordillera; the stated objective is to maintain the current processing level.", "statement": "A structural project described as replacing the existing primary crushing and ore-transport system because of a change in pit orientation. Scope includes a new primary crushing station and associated infrastructure at Nodo 3.500, plus a 4.8 km ore-conveyor tunnel to the existing concentrator at Planta Cordillera; the stated objective is to maintain the current processing level.", "qualifications": {"attribution": "www.codelco.com"}}}, "input_hash": "e275a9a876d41c3c14d5e12b0872c249528752a3c1f77d3414c083827b5964cc", "release_id": "daa37ec9-e4b4-4fb2-aeeb-9ef52b9b2d94", "type_codes": [], "field_states": {"type": {"state": "unknown_after_assessment", "reason": "Andina and Planta Cordillera identify the Chilean mining project; scope is crushing/conveyance replacement, with no independently stated commodity type in this extract."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Andina and Planta Cordillera identify the Chilean mining project; scope is crushing/conveyance replacement, with no independently stated commodity type in this extract."}, "category": {"state": "accepted", "reason": "Andina and Planta Cordillera identify the Chilean mining project; scope is crushing/conveyance replacement, with no independently stated commodity type in this extract."}}, "region_codes": ["latin_america_caribbean"], "release_hash": "5e687dbce671dda9e9e82b1859a83ef4fab645ed329bcdcaa15427b3ec6b552b", "assessment_id": "8edba913-fe42-4a09-b2a2-3491644097c6", "country_codes": ["CL"], "assessment_hash": "c35af31bd29f570b406017f96cf2f774473d8f8faefa3e5a1afc1cb39165ccd7", "country_label": "Chile", "region_label": "Latin America Caribbean", "type_labels": []}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}