# Nuevo Sistema Traspaso Andina

Publisher: CapexCue
Canonical dossier: <https://capexcue.com/projects/nuevo-sistema-traspaso-andina-0c4f1b1a-d54/>
Dossier reference: release 1 (daa37ec9-e4b4-4fb2-aeeb-9ef52b9b2d94)

Released project intelligence

Oldest supporting observation: 2026-10-17T12:07:07.139266+00:00
Dossier released: 2026-10-17T12:19:18.865877+00:00
Source report dates and capture dates are listed per fact below; neither establishes an event date.

## Project summary

Codelco describes a replacement system with a new primary crushing station at Nodo 3.500 and a 4.8 km ore-conveyor tunnel to Planta Cordillera, intended to maintain the current processing level. The page labels the project operating and reports Phase 1 inaugurated in January 2022; it also states construction concluded in August 2025, followed by administrative closure in September 2025.

## Evidence limits and unknowns

- The supplied page capture, observed 2026-10-17, gives no publication date and does not state procurement or tender status, remaining supplier packages, or budget. It identifies Nodo 3.500 and Planta Cordillera but does not give a broader project location.

Current purchasing availability: unknown.
Source-dated plans do not establish current progress or available supplier packages.

## Project metadata

Country: Chile
Region: Latin America Caribbean
Physical assets: Not classified
Derived from the exact released evidence; unresolved fields remain unclassified.

## Project category

Industrial processes
Derived from the reviewed scope statement; delivery stage remains unclassified.
A structural project described as replacing the existing primary crushing and ore-transport system because of a change in pit orientation. Scope includes a new primary crushing station and associated infrastructure at Nodo 3.500, plus a 4.8 km ore-conveyor tunnel to the existing concentrator at Planta Cordillera; the stated objective is to maintain the current processing level.
Source: www.codelco.com — https://www.codelco.com/proyectos/nuevo-sistema-traspaso-andina | published unknown | observed 2026-10-17T12:07:07.139266+00:00

Project overview
Oldest decisive evidence: 2026-10-17T12:07:07.139266+00:00
Newest evidence: 2026-10-17T12:07:07.139266+00:00
Knowledge reviewed: 2026-10-17T12:17:28.473912+00:00
Publication reviewed: 2026-10-17T12:18:53.931847+00:00

## Name
Nuevo Sistema Traspaso Andina
Status: reported
Attribution: www.codelco.com
Source: www.codelco.com — https://www.codelco.com/proyectos/nuevo-sistema-traspaso-andina | published unknown | observed 2026-10-17T12:07:07.139266+00:00

## Scope
A structural project described as replacing the existing primary crushing and ore-transport system because of a change in pit orientation. Scope includes a new primary crushing station and associated infrastructure at Nodo 3.500, plus a 4.8 km ore-conveyor tunnel to the existing concentrator at Planta Cordillera; the stated objective is to maintain the current processing level.
Status: reported
Attribution: www.codelco.com
Source: www.codelco.com — https://www.codelco.com/proyectos/nuevo-sistema-traspaso-andina | published unknown | observed 2026-10-17T12:07:07.139266+00:00

## Activity
The page labels the project “Operando” (operating); it reports that Phase 1 was inaugurated in January 2022, construction concluded in August 2025, and administrative closure followed in September 2025.
Status: reported
Attribution: www.codelco.com
Source: www.codelco.com — https://www.codelco.com/proyectos/nuevo-sistema-traspaso-andina | published unknown | observed 2026-10-17T12:07:07.139266+00:00

## Location
The source identifies the sector Nodo 3.500 and Planta Cordillera, the existing concentrator reached by the described transport system; it does not state a broader project location.
Status: reported
Attribution: www.codelco.com
Source: www.codelco.com — https://www.codelco.com/proyectos/nuevo-sistema-traspaso-andina | published unknown | observed 2026-10-17T12:07:07.139266+00:00


## Cite this dossier

CapexCue — Nuevo Sistema Traspaso Andina — dossier released 2026-10-17T12:19:18.865877+00:00, release 1 (daa37ec9-e4b4-4fb2-aeeb-9ef52b9b2d94) — https://capexcue.com/projects/nuevo-sistema-traspaso-andina-0c4f1b1a-d54/.

For current information and later dossier updates, visit <https://capexcue.com/projects/nuevo-sistema-traspaso-andina-0c4f1b1a-d54/>.
This file records the release identified above; the current dossier may change.