{"name": "Blackstone Battery Energy Storage System (BESS) Project.", "slug": "blackstone-battery-energy-storage-system-bess-project-27c2dcae-35f", "as_of": "2026-10-17T12:25:52.195858+00:00", "depth": "basic", "facts": {"date": {"value": "Construction is expected to start in November 2026 and finish in Q1 2029; operation is expected to start in Q1 2029 and continue until Q1 2054 (approximately 25 years); decommissioning is anticipated to commence in Q2 2054.", "rights": "facts_only", "source": {"url": "https://epbcpublicportal.environment.gov.au/all-referrals/project-referral-summary/?id=b82ae61b-219d-f111-b8db-6045bde6a109", "name": "epbcpublicportal.environment.gov.au", "origin": "live", "checksum": "0440f5b10c0f60df7b5fcb98d7a735048b83b2dc060820fb65c519f9060d814f", "observed_at": "2026-10-17T12:07:49.086057+00:00", "revision_id": "a1336c35-9dec-4d76-83c6-55bce60a23f4", "published_at": null}, "locator": "/html/body/form/div[2]/div[2]/div/div/div/div[2]/div[2]/div[2]/div[1]/div/div/div[1]/div/div/div/fieldset[2]/table", "claim_id": "86f15a39-593c-42fb-86e3-ea753cfbec44", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "epbcpublicportal.environment.gov.au", "evidence_id": "a1a6febe-d9f3-417e-a600-43a5ed522e28", "valid_until": null, "assertion_id": "75d46a2e-8772-47fe-8bfd-c31056aa2f27", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Blackstone Battery Energy Storage System (BESS) Project.", "rights": "facts_only", "source": {"url": "https://epbcpublicportal.environment.gov.au/all-referrals/project-referral-summary/?id=b82ae61b-219d-f111-b8db-6045bde6a109", "name": "epbcpublicportal.environment.gov.au", "origin": "live", "checksum": "0440f5b10c0f60df7b5fcb98d7a735048b83b2dc060820fb65c519f9060d814f", "observed_at": "2026-10-17T12:07:49.086057+00:00", "revision_id": "a1336c35-9dec-4d76-83c6-55bce60a23f4", "published_at": null}, "locator": "/html/body/form/div[2]/div[2]/div/div/div/div[1]/div[1]/div/text-position:141", "claim_id": "5d976a41-0d89-4801-9f28-1bea254d3a6f", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "epbcpublicportal.environment.gov.au", "evidence_id": "eb123aae-e488-4166-a862-082fb7258fc6", "valid_until": null, "assertion_id": "ea457d80-cacd-4bfc-8b07-6c5939ebd968", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Proposed 500 MW / 2,000 MWh standalone battery energy storage facility, with an approximately 7.25 ha project and disturbance footprint. Associated planned works include a new 275 kV substation, 275 kV underground cables to the existing Blackstone Substation, access roads, stormwater infrastructure, an operations and maintenance building, battery and electrical equipment, a temporary concrete batching plant, and mine remediation associated with historical underground tunnels in the eastern portion of the site.", "rights": "facts_only", "source": {"url": "https://epbcpublicportal.environment.gov.au/all-referrals/project-referral-summary/?id=b82ae61b-219d-f111-b8db-6045bde6a109", "name": "epbcpublicportal.environment.gov.au", "origin": "live", "checksum": "0440f5b10c0f60df7b5fcb98d7a735048b83b2dc060820fb65c519f9060d814f", "observed_at": "2026-10-17T12:07:49.086057+00:00", "revision_id": "a1336c35-9dec-4d76-83c6-55bce60a23f4", "published_at": null}, "locator": "/html/body/form/div[2]/div[2]/div/div/div/div[2]/div[2]/div[2]/div[1]/div/div/div[1]/div/div/div/fieldset[2]/table", "claim_id": "8d14838e-e77d-4285-95eb-177cd8562726", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "epbcpublicportal.environment.gov.au", "evidence_id": "a1a6febe-d9f3-417e-a600-43a5ed522e28", "valid_until": null, "assertion_id": "0e75ef7a-586b-470a-af31-407c8c6412a1", "temporal_expression": "", "extraction_confidence": 0.9}, "ecology": {"value": "Approximately 3.26 ha of mapped koala habitat is within the project footprint. Field surveys completed in 2026 identified koala habitat resources, but no koalas were directly observed.", "rights": "facts_only", "source": {"url": "https://epbcpublicportal.environment.gov.au/all-referrals/project-referral-summary/?id=b82ae61b-219d-f111-b8db-6045bde6a109", "name": "epbcpublicportal.environment.gov.au", "origin": "live", "checksum": "0440f5b10c0f60df7b5fcb98d7a735048b83b2dc060820fb65c519f9060d814f", "observed_at": "2026-10-17T12:07:49.086057+00:00", "revision_id": "a1336c35-9dec-4d76-83c6-55bce60a23f4", "published_at": null}, "locator": "/html/body/form/div[2]/div[2]/div/div/div/div[2]/div[2]/div[2]/div[1]/div/div/div[1]/div/div/div/fieldset[2]/table", "claim_id": "aa6c7c3f-ac9e-4084-8ead-22d172b78b73", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "epbcpublicportal.environment.gov.au", "evidence_id": "a1a6febe-d9f3-417e-a600-43a5ed522e28", "valid_until": null, "assertion_id": "9876094c-d0d5-49d5-9946-b0b3756901af", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "45 Patrick Street, Swanbank, Queensland, in the Swanbank\u2013New Chum industrial precinct, adjacent to the existing Blackstone 275 kV Substation.", "rights": "facts_only", "source": {"url": "https://epbcpublicportal.environment.gov.au/all-referrals/project-referral-summary/?id=b82ae61b-219d-f111-b8db-6045bde6a109", "name": "epbcpublicportal.environment.gov.au", "origin": "live", "checksum": "0440f5b10c0f60df7b5fcb98d7a735048b83b2dc060820fb65c519f9060d814f", "observed_at": "2026-10-17T12:07:49.086057+00:00", "revision_id": "a1336c35-9dec-4d76-83c6-55bce60a23f4", "published_at": null}, "locator": "/html/body/form/div[2]/div[2]/div/div/div/div[2]/div[2]/div[2]/div[1]/div/div/div[1]/div/div/div/fieldset[2]/table", "claim_id": "09ee8d0f-21ce-42e9-aed9-eb86504d68dc", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "epbcpublicportal.environment.gov.au", "evidence_id": "a1a6febe-d9f3-417e-a600-43a5ed522e28", "valid_until": null, "assertion_id": "6e02be48-be49-422b-b9ad-8af7a7ec02aa", "temporal_expression": "", "extraction_confidence": 0.9}, "contractor": {"value": "Tesla is identified as the planned counterparty for the EPC and LTSA; execution is listed as a future step.", "rights": "facts_only", "source": {"url": "https://epbcpublicportal.environment.gov.au/all-referrals/project-referral-summary/?id=b82ae61b-219d-f111-b8db-6045bde6a109", "name": "epbcpublicportal.environment.gov.au", "origin": "live", "checksum": "0440f5b10c0f60df7b5fcb98d7a735048b83b2dc060820fb65c519f9060d814f", "observed_at": "2026-10-17T12:07:49.086057+00:00", "revision_id": "a1336c35-9dec-4d76-83c6-55bce60a23f4", "published_at": null}, "locator": "/html/body/form/div[2]/div[2]/div/div/div/div[2]/div[2]/div[2]/div[1]/div/div/div[1]/div/div/div/fieldset[2]/table", "claim_id": "8e0172a3-165d-4544-be7a-cee8dd0642c9", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "epbcpublicportal.environment.gov.au", "evidence_id": "a1a6febe-d9f3-417e-a600-43a5ed522e28", "valid_until": null, "assertion_id": "03852d7b-01a9-4ed4-a1e0-19a536204f74", "temporal_expression": "", "extraction_confidence": 0.9}, "regulatory": {"value": "The portal displays project status \u201cReferral Decision Made,\u201d while the project description lists finalising Operational Works approvals with Ipswich City Council as a future step; neither establishes that all approvals are complete. The captured page states it is an offline, read-only version and warns that project status fields for some projects may update. The related-decisions table shows loading, permission and error messages and provides no usable decision details.", "rights": "facts_only", "source": {"url": "https://epbcpublicportal.environment.gov.au/all-referrals/project-referral-summary/?id=b82ae61b-219d-f111-b8db-6045bde6a109", "name": "epbcpublicportal.environment.gov.au", "origin": "live", "checksum": "0440f5b10c0f60df7b5fcb98d7a735048b83b2dc060820fb65c519f9060d814f", "observed_at": "2026-10-17T12:07:49.086057+00:00", "revision_id": "a1336c35-9dec-4d76-83c6-55bce60a23f4", "published_at": null}, "locator": "/html/body/div[1]/div[1]/text-position:4", "claim_id": "9a9ccf14-ff22-4225-a7ca-aba3118c4964", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "epbcpublicportal.environment.gov.au", "evidence_id": "42cb33a3-89c9-4762-af55-2a9b6795bc6b", "valid_until": null, "assertion_id": "47045e13-027a-404c-9aca-8d65d1043da4", "temporal_expression": "", "extraction_confidence": 0.9}, "procurement": {"value": "Execution of the EPC and Long-Term Service Agreement (LTSA), and execution of connection and access agreements with Powerlink Queensland for the Blackstone Substation extension and high-voltage underground cables, are listed as future steps. The description does not state that these agreements have been executed.", "rights": "facts_only", "source": {"url": "https://epbcpublicportal.environment.gov.au/all-referrals/project-referral-summary/?id=b82ae61b-219d-f111-b8db-6045bde6a109", "name": "epbcpublicportal.environment.gov.au", "origin": "live", "checksum": "0440f5b10c0f60df7b5fcb98d7a735048b83b2dc060820fb65c519f9060d814f", "observed_at": "2026-10-17T12:07:49.086057+00:00", "revision_id": "a1336c35-9dec-4d76-83c6-55bce60a23f4", "published_at": null}, "locator": "/html/body/form/div[2]/div[2]/div/div/div/div[2]/div[2]/div[2]/div[1]/div/div/div[1]/div/div/div/fieldset[2]/table", "claim_id": "0ad2e442-23fd-4d90-aa10-21b01762ec75", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "epbcpublicportal.environment.gov.au", "evidence_id": "a1a6febe-d9f3-417e-a600-43a5ed522e28", "valid_until": null, "assertion_id": "36affc4f-f15b-4768-804f-ee2eb9ea6901", "temporal_expression": "", "extraction_confidence": 0.9}, "next_milestone": {"value": "The project description targets financial close and issuance of the Notice to Proceed for construction in Q4 2026.", "rights": "facts_only", "source": {"url": "https://epbcpublicportal.environment.gov.au/all-referrals/project-referral-summary/?id=b82ae61b-219d-f111-b8db-6045bde6a109", "name": "epbcpublicportal.environment.gov.au", "origin": "live", "checksum": "0440f5b10c0f60df7b5fcb98d7a735048b83b2dc060820fb65c519f9060d814f", "observed_at": "2026-10-17T12:07:49.086057+00:00", "revision_id": "a1336c35-9dec-4d76-83c6-55bce60a23f4", "published_at": null}, "locator": "/html/body/form/div[2]/div[2]/div/div/div/div[2]/div[2]/div[2]/div[1]/div/div/div[1]/div/div/div/fieldset[2]/table", "claim_id": "2230707f-f96b-49a9-9d6b-ee66a77d5535", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "epbcpublicportal.environment.gov.au", "evidence_id": "a1a6febe-d9f3-417e-a600-43a5ed522e28", "valid_until": null, "assertion_id": "a6181a9a-e18d-40f5-9273-3d2f02c5586b", "temporal_expression": "", "extraction_confidence": 0.9}, "financing_stage": {"value": "Completing project financing and achieving financial close are listed as steps to be completed following the EPBC Act referral.", "rights": "facts_only", "source": {"url": "https://epbcpublicportal.environment.gov.au/all-referrals/project-referral-summary/?id=b82ae61b-219d-f111-b8db-6045bde6a109", "name": "epbcpublicportal.environment.gov.au", "origin": "live", "checksum": "0440f5b10c0f60df7b5fcb98d7a735048b83b2dc060820fb65c519f9060d814f", "observed_at": "2026-10-17T12:07:49.086057+00:00", "revision_id": "a1336c35-9dec-4d76-83c6-55bce60a23f4", "published_at": null}, "locator": "/html/body/form/div[2]/div[2]/div/div/div/div[2]/div[2]/div[2]/div[1]/div/div/div[1]/div/div/div/fieldset[2]/table", "claim_id": "fa7b7fea-a4b3-426c-938b-b9463f1644bf", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "epbcpublicportal.environment.gov.au", "evidence_id": "a1a6febe-d9f3-417e-a600-43a5ed522e28", "valid_until": null, "assertion_id": "28f2c6f0-31fb-481b-87ef-8360d587cb8b", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "cd997d2a-3c4f-4f2d-8383-27e28bbfa7ac", "publication": {"local_only": false, "reviewed_at": "2026-10-17T12:27:16.945233+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "The referral describes a proposed 500 MW / 2,000 MWh standalone battery storage project at 45 Patrick Street, Swanbank, Queensland, with an approximately 7.25 ha footprint and associated substation, underground cables, site infrastructure, batching plant and mine-remediation works. Approximately 3.26 ha of mapped koala habitat is within the footprint; 2026 surveys identified habitat resources but directly observed no koalas. \n\nConstruction is expected to run from November 2026 to Q1 2029. The portal displays \u201cReferral Decision Made,\u201d but the captured page is offline/read-only, warns that some status fields may update, and provides no usable details in its related-decisions table. The description lists approvals, financing, EPC/LTSA execution and Powerlink agreements as future steps; it does not document an open procurement opportunity.", "schema_version": "1.0", "public_unknowns": ["The portal capture was observed on 2026-10-17; the source provides no publication date. Current project status after that capture is not established.", "The source does not establish whether financing, approvals, agreements or the Q4 2026 milestone have since been completed.", "The project description does not state a budget or financing amount.", "The related-decisions table provides no usable decision details."], "evidence_observed_at": "2026-10-17T12:07:49.086057+00:00", "knowledge_reviewed_at": "2026-10-17T12:25:52.686007+00:00", "decisive_evidence_observed_at": "2026-10-17T12:07:49.086057+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Blackstone Battery Energy Storage System (BESS) Project", "original_project_title": "Blackstone Battery Energy Storage System (BESS) Project.", "canonical_url": "https://capexcue.com/projects/blackstone-battery-energy-storage-system-bess-project-27c2dcae-35f/", "release": {"id": "217bcbfc-f792-41ca-a80a-31c19cc3912d", "number": 1, "published_at": "2026-10-17T12:27:38.754051+00:00"}, "release_reference": "release 1 (217bcbfc-f792-41ca-a80a-31c19cc3912d)", "current_dossier_url": "https://capexcue.com/projects/blackstone-battery-energy-storage-system-bess-project-27c2dcae-35f/", "citation": "CapexCue \u2014 Blackstone Battery Energy Storage System (BESS) Project \u2014 dossier released 2026-10-17T12:27:38.754051+00:00, release 1 (217bcbfc-f792-41ca-a80a-31c19cc3912d) \u2014 https://capexcue.com/projects/blackstone-battery-energy-storage-system-bess-project-27c2dcae-35f/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 515, "start": 0, "sources": [{"url": "https://epbcpublicportal.environment.gov.au/all-referrals/project-referral-summary/?id=b82ae61b-219d-f111-b8db-6045bde6a109", "name": "epbcpublicportal.environment.gov.au", "origin": "live", "checksum": "0440f5b10c0f60df7b5fcb98d7a735048b83b2dc060820fb65c519f9060d814f", "observed_at": "2026-10-17T12:07:49.086057+00:00", "revision_id": "a1336c35-9dec-4d76-83c6-55bce60a23f4", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "Proposed 500 MW / 2,000 MWh standalone battery energy storage facility, with an approximately 7.25 ha project and disturbance footprint. Associated planned works include a new 275 kV substation, 275 kV underground cables to the existing Blackstone Substation, access roads, stormwater infrastructure, an operations and maintenance building, battery and electrical equipment, a temporary concrete batching plant, and mine remediation associated with historical underground tunnels in the eastern portion of the site.", "statement": "Proposed 500 MW / 2,000 MWh standalone battery energy storage facility, with an approximately 7.25 ha project and disturbance footprint. Associated planned works include a new 275 kV substation, 275 kV underground cables to the existing Blackstone Substation, access roads, stormwater infrastructure, an operations and maintenance building, battery and electrical equipment, a temporary concrete batching plant, and mine remediation associated with historical underground tunnels in the eastern portion of the site.", "qualifications": {"attribution": "epbcpublicportal.environment.gov.au"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 515, "start": 0, "sources": [{"url": "https://epbcpublicportal.environment.gov.au/all-referrals/project-referral-summary/?id=b82ae61b-219d-f111-b8db-6045bde6a109", "name": "epbcpublicportal.environment.gov.au", "origin": "live", "checksum": "0440f5b10c0f60df7b5fcb98d7a735048b83b2dc060820fb65c519f9060d814f", "observed_at": "2026-10-17T12:07:49.086057+00:00", "revision_id": "a1336c35-9dec-4d76-83c6-55bce60a23f4", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "Proposed 500 MW / 2,000 MWh standalone battery energy storage facility, with an approximately 7.25 ha project and disturbance footprint. Associated planned works include a new 275 kV substation, 275 kV underground cables to the existing Blackstone Substation, access roads, stormwater infrastructure, an operations and maintenance building, battery and electrical equipment, a temporary concrete batching plant, and mine remediation associated with historical underground tunnels in the eastern portion of the site.", "statement": "Proposed 500 MW / 2,000 MWh standalone battery energy storage facility, with an approximately 7.25 ha project and disturbance footprint. Associated planned works include a new 275 kV substation, 275 kV underground cables to the existing Blackstone Substation, access roads, stormwater infrastructure, an operations and maintenance building, battery and electrical equipment, a temporary concrete batching plant, and mine remediation associated with historical underground tunnels in the eastern portion of the site.", "qualifications": {"attribution": "epbcpublicportal.environment.gov.au"}}}, "input_hash": "1eec7e86125af8e1308237724e823c7e9b5211c5614b82b2b29f8c9add1cf47f", "release_id": "217bcbfc-f792-41ca-a80a-31c19cc3912d", "type_codes": ["battery_storage", "electricity_transmission"], "field_states": {"type": {"state": "accepted", "reason": "Swanbank, Queensland is in Australia; battery facility includes a new substation and grid cables."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Swanbank, Queensland is in Australia; battery facility includes a new substation and grid cables."}, "category": {"state": "accepted", "reason": "Swanbank, Queensland is in Australia; battery facility includes a new substation and grid cables."}}, "region_codes": ["oceania"], "release_hash": "053ff4f36f17880722f187fdb08cd49d9fc37ed76d9c9c6339a3de0032b24938", "assessment_id": "c6312f7d-cf2b-49ed-8d66-8e37276d06ee", "country_codes": ["AU"], "assessment_hash": "b2825cdb971ee540d913e9341a13d3252f9233609d718d52493c1f5ab31b1a10", "country_label": "Australia", "region_label": "Oceania", "type_labels": ["Battery Storage", "Electricity Transmission"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}