{"name": "Hajr IPP", "slug": "hajr-ipp-090a681f-f13", "as_of": "2026-10-18T06:52:55.690858+00:00", "depth": "basic", "facts": {"date": {"value": "The listed commercial operations date is Q1 2015.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/hajr-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "e8103b99fbf1ede70ec1f9c56e3159a5604a562353d1e3b2008897ea72b538f1", "observed_at": "2026-10-18T06:45:30.182278+00:00", "revision_id": "d123498e-2f3c-4834-ad89-9ed948b5dd34", "published_at": null}, "locator": "/html/head/main/div/section[4]/div/ul/li[7]", "claim_id": "536ca44b-68e5-48ae-a754-bd1ea151bb66", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "570eb35c-5099-4201-8cbf-2bcd745b5527", "valid_until": null, "assertion_id": "f5f59296-9aab-44f1-8110-0c47ae149cbe", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Hajr IPP", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/hajr-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "e8103b99fbf1ede70ec1f9c56e3159a5604a562353d1e3b2008897ea72b538f1", "observed_at": "2026-10-18T06:45:30.182278+00:00", "revision_id": "d123498e-2f3c-4834-ad89-9ed948b5dd34", "published_at": null}, "locator": "/html/head/main/div/section[1]/div[1]/div/div/div/div/div[1]/h3", "claim_id": "ad2907e0-9b69-4d41-b92f-bcbf1a9417ba", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "fa9de84e-a96a-428a-9956-60c71a1897c1", "valid_until": null, "assertion_id": "33698503-a9e2-4494-b0ab-434502f27632", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Greenfield independent power project: natural-gas-fired combined-cycle plant using gas and steam, with net generation capacity of 3,927 MW.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/hajr-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "e8103b99fbf1ede70ec1f9c56e3159a5604a562353d1e3b2008897ea72b538f1", "observed_at": "2026-10-18T06:45:30.182278+00:00", "revision_id": "d123498e-2f3c-4834-ad89-9ed948b5dd34", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "915015b4-d76e-4bdd-a226-3b2d12aef82c", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "a3ac1655-1d79-47fa-a2b7-c8d079b074ea", "valid_until": null, "assertion_id": "5a2cd4ff-fe72-4f54-9e4b-d9d7472bbc65", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Eastern Province, Saudi Arabia, on the country\u2019s eastern coast.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/hajr-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "e8103b99fbf1ede70ec1f9c56e3159a5604a562353d1e3b2008897ea72b538f1", "observed_at": "2026-10-18T06:45:30.182278+00:00", "revision_id": "d123498e-2f3c-4834-ad89-9ed948b5dd34", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "f5c8842e-d1ce-42de-83bc-85223459f323", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "a3ac1655-1d79-47fa-a2b7-c8d079b074ea", "valid_until": null, "assertion_id": "9b3f0bbe-9964-41c7-800f-a41e3a63bb19", "temporal_expression": "", "extraction_confidence": 0.9}, "operator": {"value": "Acwa Operations is listed as the operations and maintenance company.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/hajr-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "e8103b99fbf1ede70ec1f9c56e3159a5604a562353d1e3b2008897ea72b538f1", "observed_at": "2026-10-18T06:45:30.182278+00:00", "revision_id": "d123498e-2f3c-4834-ad89-9ed948b5dd34", "published_at": null}, "locator": "/html/head/main/div/section[4]/div/ul/li[12]", "claim_id": "d1b5cbe9-3b5d-48b1-9bf2-41b146b13c9e", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "bd64f8bc-9f78-4860-8cb6-126fe5cf1427", "valid_until": null, "assertion_id": "49cf7e93-cd60-4d90-82ba-e453a365c098", "temporal_expression": "", "extraction_confidence": 0.9}, "contractor": {"value": "Samsung C&T is listed as the engineering, procurement and construction company.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/hajr-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "e8103b99fbf1ede70ec1f9c56e3159a5604a562353d1e3b2008897ea72b538f1", "observed_at": "2026-10-18T06:45:30.182278+00:00", "revision_id": "d123498e-2f3c-4834-ad89-9ed948b5dd34", "published_at": null}, "locator": "/html/head/main/div/section[4]/div/ul/li[13]", "claim_id": "73998e8a-a663-4700-9455-be2fd35a62cd", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "aa8f30a9-4101-4cee-b360-c35154d6cabe", "valid_until": null, "assertion_id": "72e25cb8-d447-4696-a5c2-716331c2960b", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "d0c9f137-75a7-4821-8c5d-197feca33502", "publication": {"local_only": false, "reviewed_at": "2026-10-18T06:54:10.143476+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Hajr IPP is reported as a greenfield natural-gas-fired combined-cycle power project in Saudi Arabia\u2019s Eastern Province, with net generation capacity of 3,927 MW. The project page lists Q1 2015 as its commercial operations date, Samsung C&T as the EPC company, and Acwa Operations as the O&M company. The supplied material does not establish current plant status, current equipment or service needs, or a current procurement opportunity or buying window.", "schema_version": "1.0", "public_unknowns": ["The supplied project-page material does not establish current plant status or current equipment and service requirements.", "No current procurement opportunity, tender status, or buying window is documented in the supplied material."], "evidence_observed_at": "2026-10-18T06:45:30.182278+00:00", "knowledge_reviewed_at": "2026-10-18T06:52:56.209199+00:00", "decisive_evidence_observed_at": "2026-10-18T06:45:30.182278+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Hajr IPP", "original_project_title": "Hajr IPP", "canonical_url": "https://capexcue.com/projects/hajr-ipp-090a681f-f13/", "release": {"id": "f920c14e-1194-494d-831a-1fcdaecc6179", "number": 1, "published_at": "2026-10-18T06:54:34.339027+00:00"}, "release_reference": "release 1 (f920c14e-1194-494d-831a-1fcdaecc6179)", "current_dossier_url": "https://capexcue.com/projects/hajr-ipp-090a681f-f13/", "citation": "CapexCue \u2014 Hajr IPP \u2014 dossier released 2026-10-18T06:54:34.339027+00:00, release 1 (f920c14e-1194-494d-831a-1fcdaecc6179) \u2014 https://capexcue.com/projects/hajr-ipp-090a681f-f13/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 139, "start": 0, "sources": [{"url": "https://acwapower.com/en/what-we-do/projects/hajr-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "e8103b99fbf1ede70ec1f9c56e3159a5604a562353d1e3b2008897ea72b538f1", "observed_at": "2026-10-18T06:45:30.182278+00:00", "revision_id": "d123498e-2f3c-4834-ad89-9ed948b5dd34", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Greenfield independent power project: natural-gas-fired combined-cycle plant using gas and steam, with net generation capacity of 3,927 MW.", "statement": "Greenfield independent power project: natural-gas-fired combined-cycle plant using gas and steam, with net generation capacity of 3,927 MW.", "qualifications": {"attribution": "acwapower.com"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 139, "start": 0, "sources": [{"url": "https://acwapower.com/en/what-we-do/projects/hajr-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "e8103b99fbf1ede70ec1f9c56e3159a5604a562353d1e3b2008897ea72b538f1", "observed_at": "2026-10-18T06:45:30.182278+00:00", "revision_id": "d123498e-2f3c-4834-ad89-9ed948b5dd34", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Greenfield independent power project: natural-gas-fired combined-cycle plant using gas and steam, with net generation capacity of 3,927 MW.", "statement": "Greenfield independent power project: natural-gas-fired combined-cycle plant using gas and steam, with net generation capacity of 3,927 MW.", "qualifications": {"attribution": "acwapower.com"}}}, "input_hash": "638ea9839cfd41d6d8dfec0f29e17b66da41984af52f17605014fce6a8a39c53", "release_id": "f920c14e-1194-494d-831a-1fcdaecc6179", "type_codes": [], "field_states": {"type": {"state": "unknown_after_assessment", "reason": "Saudi Arabia natural-gas combined-cycle power project; no registered gas-fired generation type."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "supported_physical_country"}, "category": {"state": "accepted", "reason": "Saudi Arabia natural-gas combined-cycle power project; no registered gas-fired generation type."}}, "region_codes": ["middle_east_north_africa"], "release_hash": "0dfc18c1d46a9df0d0306a20b99b4a49f2d63a89fd93abd155b813ba4d1d250f", "assessment_id": "a51345e1-58e6-46cc-a420-0520d59a0b68", "country_codes": ["SA"], "assessment_hash": "bfef237f555837b72302a91614eafa05623e1dab0da2ca26a95cddb4263dbc8f", "country_label": "Saudi Arabia", "region_label": "Middle East North Africa", "type_labels": []}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}