{"name": "CEF Bra\u0219ov (Central\u0103 Fotovoltaic\u0103 / photovoltaic power plant).", "slug": "cef-brasov-centrala-fotovoltaica-photovoltaic-power-plant-f577aa8d-4d9", "as_of": "2026-10-18T18:32:02.268990+00:00", "depth": "basic", "facts": {"name": {"value": "CEF Bra\u0219ov (Central\u0103 Fotovoltaic\u0103 / photovoltaic power plant).", "rights": "facts_only", "source": {"url": "https://www.brasovrenewables.ro/", "name": "www.brasovrenewables.ro", "origin": "live", "checksum": "adef92ad51c5a50eca7f3607fb770591ca4ab1f318324bfe38781c7497bf666c", "observed_at": "2026-10-18T16:06:28.327011+00:00", "revision_id": "460c7286-9f22-4d70-8b65-c6de2c3f9e29", "published_at": null}, "locator": "/html/head/title", "claim_id": "e288958a-43bf-4b7f-bb1d-d826988bdb89", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.brasovrenewables.ro", "evidence_id": "818d0b48-ff71-4381-9430-9b4ca9bca05e", "valid_until": null, "assertion_id": "5111375b-8185-464d-8368-eed5540221b2", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Photovoltaic facility with stated installed capacity of 30.80 MW; this figure does not establish that the capacity is commissioned.", "rights": "facts_only", "source": {"url": "https://www.brasovrenewables.ro/", "name": "www.brasovrenewables.ro", "origin": "live", "checksum": "adef92ad51c5a50eca7f3607fb770591ca4ab1f318324bfe38781c7497bf666c", "observed_at": "2026-10-18T16:06:28.327011+00:00", "revision_id": "460c7286-9f22-4d70-8b65-c6de2c3f9e29", "published_at": null}, "locator": "/html/body/main/section[2]/div/dl", "claim_id": "27ee1eee-8baf-4805-b21e-b58850dcb774", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.brasovrenewables.ro", "evidence_id": "abe42ac4-5bd7-470a-91c6-9f14bb46494b", "valid_until": null, "assertion_id": "e5362245-42f9-4cc7-a86e-e08d8d1b2f9d", "temporal_expression": "", "extraction_confidence": 0.9}, "sector": {"value": "Solar photovoltaic power generation.", "rights": "facts_only", "source": {"url": "https://www.brasovrenewables.ro/", "name": "www.brasovrenewables.ro", "origin": "live", "checksum": "adef92ad51c5a50eca7f3607fb770591ca4ab1f318324bfe38781c7497bf666c", "observed_at": "2026-10-18T16:06:28.327011+00:00", "revision_id": "460c7286-9f22-4d70-8b65-c6de2c3f9e29", "published_at": null}, "locator": "/html/body/main/section[2]/div/dl", "claim_id": "a59a57eb-a07a-4c12-8b81-e9e285afc475", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.brasovrenewables.ro", "evidence_id": "abe42ac4-5bd7-470a-91c6-9f14bb46494b", "valid_until": null, "assertion_id": "dd9f09ab-4da5-45bf-8f13-a18af4b8b6dd", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "Listed as \u201c\u00cen implementare\u201d (in implementation).", "rights": "facts_only", "source": {"url": "https://www.brasovrenewables.ro/", "name": "www.brasovrenewables.ro", "origin": "live", "checksum": "adef92ad51c5a50eca7f3607fb770591ca4ab1f318324bfe38781c7497bf666c", "observed_at": "2026-10-18T16:06:28.327011+00:00", "revision_id": "460c7286-9f22-4d70-8b65-c6de2c3f9e29", "published_at": null}, "locator": "/html/body/main/section[2]/div/dl", "claim_id": "362a6097-f44d-4a52-8b49-4b095b81336a", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.brasovrenewables.ro", "evidence_id": "abe42ac4-5bd7-470a-91c6-9f14bb46494b", "valid_until": null, "assertion_id": "1e89cc95-5325-4bfc-9316-a707432ed59b", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Calea Feldioarei FN, Bra\u0219ov Municipality, Bra\u0219ov County.", "rights": "facts_only", "source": {"url": "https://www.brasovrenewables.ro/", "name": "www.brasovrenewables.ro", "origin": "live", "checksum": "adef92ad51c5a50eca7f3607fb770591ca4ab1f318324bfe38781c7497bf666c", "observed_at": "2026-10-18T16:06:28.327011+00:00", "revision_id": "460c7286-9f22-4d70-8b65-c6de2c3f9e29", "published_at": null}, "locator": "/html/body/main/section[2]/div/div/span/text-position:54", "claim_id": "34d10acf-cc38-4b66-870f-11621ce557f1", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.brasovrenewables.ro", "evidence_id": "c1887be7-f267-4aec-b610-e0cc0ab185f7", "valid_until": null, "assertion_id": "461a63de-89eb-4b9c-9c4b-ea5bbd319760", "temporal_expression": "", "extraction_confidence": 0.9}, "procurement": {"value": "The source reports a signed supply contract no. 161 dated 16.09.2026 with ASTRONERGY SOLAR MODULES B.V. for 51,678 photovoltaic panels and 88 inverters; delivery is stated as DDP at the site within 60 and 90 days of signing, respectively. Separately, the page labels the steel-structure supply and relaunched photovoltaic-park construction procedures as active, listing offer deadlines of 13.08.2026, 12:00 and 16.10.2026, 12:00, respectively. The earlier construction procedure was annulled after errors were identified in its specifications.", "rights": "facts_only", "source": {"url": "https://www.brasovrenewables.ro/", "name": "www.brasovrenewables.ro", "origin": "live", "checksum": "adef92ad51c5a50eca7f3607fb770591ca4ab1f318324bfe38781c7497bf666c", "observed_at": "2026-10-18T16:06:28.327011+00:00", "revision_id": "460c7286-9f22-4d70-8b65-c6de2c3f9e29", "published_at": null}, "locator": "/html/body/main/section[5]/div/div[1]/div/h2", "claim_id": "2faf7544-b845-491c-8557-08a5d282f778", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.brasovrenewables.ro", "evidence_id": "86f5c64b-888b-4b6a-9e80-66371eaab041", "valid_until": null, "assertion_id": "e63a70e1-b626-4173-8138-8f2d1eb0913d", "temporal_expression": "", "extraction_confidence": 0.9}, "source_program": {"value": "Modernisation Fund (Fondul pentru Modernizare).", "rights": "facts_only", "source": {"url": "https://www.brasovrenewables.ro/", "name": "www.brasovrenewables.ro", "origin": "live", "checksum": "adef92ad51c5a50eca7f3607fb770591ca4ab1f318324bfe38781c7497bf666c", "observed_at": "2026-10-18T16:06:28.327011+00:00", "revision_id": "460c7286-9f22-4d70-8b65-c6de2c3f9e29", "published_at": null}, "locator": "/html/body/main/section[1]/div/div[1]/span/text-position:8", "claim_id": "1ab3e95c-2bc5-4f35-899b-4c1f1231ce5f", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.brasovrenewables.ro", "evidence_id": "8063a049-4e72-45c3-9495-4fc79f9f8be7", "valid_until": null, "assertion_id": "1f5041fc-2aef-4992-a055-aefb023e7069", "temporal_expression": "", "extraction_confidence": 0.9}, "financing_stage": {"value": "Financing contract no. 1170, dated 23.06.2025, is listed.", "rights": "facts_only", "source": {"url": "https://www.brasovrenewables.ro/", "name": "www.brasovrenewables.ro", "origin": "live", "checksum": "adef92ad51c5a50eca7f3607fb770591ca4ab1f318324bfe38781c7497bf666c", "observed_at": "2026-10-18T16:06:28.327011+00:00", "revision_id": "460c7286-9f22-4d70-8b65-c6de2c3f9e29", "published_at": null}, "locator": "/html/body/main/section[1]/div/div[2]/div[1]/div[2]/div[3]/span/text-position:26", "claim_id": "a6dc88b8-1b13-473d-81c2-da8c65da2e08", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.brasovrenewables.ro", "evidence_id": "db9178d8-19a1-4f40-ab21-8a9f4fb1c1e9", "valid_until": null, "assertion_id": "ffd6640f-6ea3-4e83-998a-952b4424c2f6", "temporal_expression": "", "extraction_confidence": 0.9}, "financing_amount": {"value": "Total project value: 140,979,465.45 lei including VAT. The amount shown as financed from the Modernisation Fund is 11,461,470.64 lei; the source also states that 8.12% of total investment is co-financed through the fund.", "rights": "facts_only", "source": {"url": "https://www.brasovrenewables.ro/", "name": "www.brasovrenewables.ro", "origin": "live", "checksum": "adef92ad51c5a50eca7f3607fb770591ca4ab1f318324bfe38781c7497bf666c", "observed_at": "2026-10-18T16:06:28.327011+00:00", "revision_id": "460c7286-9f22-4d70-8b65-c6de2c3f9e29", "published_at": null}, "locator": "/html/body/main/section[1]/div/div[2]/div[1]/div[1]/text-position:13", "claim_id": "5e9d44da-b2b4-42bc-b61f-62582f6a340e", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.brasovrenewables.ro", "evidence_id": "ae07d635-7c50-4534-b9ed-eed438982267", "valid_until": null, "assertion_id": "e52cfb42-f5e4-45eb-9567-6f27c696d81b", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "d120ce4b-373f-4ac5-8705-e8ebe1d4f1db", "publication": {"local_only": false, "reviewed_at": "2026-10-18T18:35:09.959917+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "CEF Bra\u0219ov is a photovoltaic facility at Calea Feldioarei FN in Bra\u0219ov Municipality, Bra\u0219ov County. Its stated installed capacity is 30.80 MW, and the source lists the project as in implementation; the listed capacity does not establish commissioning. The reported total project value is 140,979,465.45 lei including VAT, with 11,461,470.64 lei shown as financed from the Modernisation Fund. The source reports a signed contract for panels and inverters. It also labels steel-structure supply and relaunched construction procedures active, with offer deadlines of 13 August 2026 and 16 October 2026, respectively. The earlier construction procedure was annulled after errors were identified in its specifications.", "schema_version": "1.0", "public_unknowns": ["Commissioning and achieved operating capacity are not established; the source lists the project as in implementation.", "The outcome and current availability of the steel-structure and relaunched construction procedures are not established by the supplied text. It lists offer deadlines of 13.08.2026 and 16.10.2026, respectively."], "evidence_observed_at": "2026-10-18T16:06:28.327011+00:00", "knowledge_reviewed_at": "2026-10-18T18:32:02.820374+00:00", "decisive_evidence_observed_at": "2026-10-18T16:06:28.327011+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "CEF Bra\u0219ov (Central\u0103 Fotovoltaic\u0103 / photovoltaic power plant).", "original_project_title": "CEF Bra\u0219ov (Central\u0103 Fotovoltaic\u0103 / photovoltaic power plant).", "canonical_url": "https://capexcue.com/projects/cef-brasov-centrala-fotovoltaica-photovoltaic-power-plant-f577aa8d-4d9/", "release": {"id": "f9ba61ca-b413-4094-977c-0ad3eb67431f", "number": 1, "published_at": "2026-10-18T18:36:08.612874+00:00"}, "release_reference": "release 1 (f9ba61ca-b413-4094-977c-0ad3eb67431f)", "current_dossier_url": "https://capexcue.com/projects/cef-brasov-centrala-fotovoltaica-photovoltaic-power-plant-f577aa8d-4d9/", "citation": "CapexCue \u2014 CEF Bra\u0219ov (Central\u0103 Fotovoltaic\u0103 / photovoltaic power plant). \u2014 dossier released 2026-10-18T18:36:08.612874+00:00, release 1 (f9ba61ca-b413-4094-977c-0ad3eb67431f) \u2014 https://capexcue.com/projects/cef-brasov-centrala-fotovoltaica-photovoltaic-power-plant-f577aa8d-4d9/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 131, "start": 0, "sources": [{"url": "https://www.brasovrenewables.ro/", "name": "www.brasovrenewables.ro", "origin": "live", "checksum": "adef92ad51c5a50eca7f3607fb770591ca4ab1f318324bfe38781c7497bf666c", "observed_at": "2026-10-18T16:06:28.327011+00:00", "revision_id": "460c7286-9f22-4d70-8b65-c6de2c3f9e29", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Photovoltaic facility with stated installed capacity of 30.80 MW; this figure does not establish that the capacity is commissioned.", "statement": "Photovoltaic facility with stated installed capacity of 30.80 MW; this figure does not establish that the capacity is commissioned.", "qualifications": {"attribution": "www.brasovrenewables.ro"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 131, "start": 0, "sources": [{"url": "https://www.brasovrenewables.ro/", "name": "www.brasovrenewables.ro", "origin": "live", "checksum": "adef92ad51c5a50eca7f3607fb770591ca4ab1f318324bfe38781c7497bf666c", "observed_at": "2026-10-18T16:06:28.327011+00:00", "revision_id": "460c7286-9f22-4d70-8b65-c6de2c3f9e29", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Photovoltaic facility with stated installed capacity of 30.80 MW; this figure does not establish that the capacity is commissioned.", "statement": "Photovoltaic facility with stated installed capacity of 30.80 MW; this figure does not establish that the capacity is commissioned.", "qualifications": {"attribution": "www.brasovrenewables.ro"}}}, "input_hash": "87f6036c8aca06963a826c2ccb0466c416c590c6ec21389f163221f9b98e69d1", "release_id": "f9ba61ca-b413-4094-977c-0ad3eb67431f", "type_codes": ["solar_pv"], "field_states": {"type": {"state": "accepted", "reason": "Brasov is in Romania; photovoltaic generation is explicit, commissioning remains unestablished."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Brasov is in Romania; photovoltaic generation is explicit, commissioning remains unestablished."}, "category": {"state": "accepted", "reason": "Brasov is in Romania; photovoltaic generation is explicit, commissioning remains unestablished."}}, "region_codes": ["europe"], "release_hash": "b63bd41b7fb87211dc1a66906ef554a9626db8e60ea2f752c6fbbc5912772123", "assessment_id": "0cff4d85-8ba7-4819-96ba-fc0955307c94", "country_codes": ["RO"], "assessment_hash": "8cbd09c6783490cc05693888fa4e4a3adea2d0c1b3d60805e0543ab99f5bad82", "country_label": "Romania", "region_label": "Europe", "type_labels": ["Solar PV"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}