# CEF Brașov (Centrală Fotovoltaică / photovoltaic power plant).

Publisher: CapexCue
Canonical dossier: <https://capexcue.com/projects/cef-brasov-centrala-fotovoltaica-photovoltaic-power-plant-f577aa8d-4d9/>
Dossier reference: release 1 (f9ba61ca-b413-4094-977c-0ad3eb67431f)

Released project intelligence

Oldest supporting observation: 2026-10-18T16:06:28.327011+00:00
Dossier released: 2026-10-18T18:36:08.612874+00:00
Source report dates and capture dates are listed per fact below; neither establishes an event date.

## Project summary

CEF Brașov is a photovoltaic facility at Calea Feldioarei FN in Brașov Municipality, Brașov County. Its stated installed capacity is 30.80 MW, and the source lists the project as in implementation; the listed capacity does not establish commissioning. The reported total project value is 140,979,465.45 lei including VAT, with 11,461,470.64 lei shown as financed from the Modernisation Fund. The source reports a signed contract for panels and inverters. It also labels steel-structure supply and relaunched construction procedures active, with offer deadlines of 13 August 2026 and 16 October 2026, respectively. The earlier construction procedure was annulled after errors were identified in its specifications.

## Evidence limits and unknowns

- Commissioning and achieved operating capacity are not established; the source lists the project as in implementation.
- The outcome and current availability of the steel-structure and relaunched construction procedures are not established by the supplied text. It lists offer deadlines of 13.08.2026 and 16.10.2026, respectively.

Current purchasing availability: unknown.
Source-dated plans do not establish current progress or available supplier packages.

## Project metadata

Country: Romania
Region: Europe
Physical assets: Solar PV
Derived from the exact released evidence; unresolved fields remain unclassified.

## Project category

Energy
Derived from the reviewed scope statement; delivery stage remains unclassified.
Photovoltaic facility with stated installed capacity of 30.80 MW; this figure does not establish that the capacity is commissioned.
Source: www.brasovrenewables.ro — https://www.brasovrenewables.ro/ | published unknown | observed 2026-10-18T16:06:28.327011+00:00

Project overview
Oldest decisive evidence: 2026-10-18T16:06:28.327011+00:00
Newest evidence: 2026-10-18T16:06:28.327011+00:00
Knowledge reviewed: 2026-10-18T18:32:02.820374+00:00
Publication reviewed: 2026-10-18T18:35:09.959917+00:00

## Name
CEF Brașov (Centrală Fotovoltaică / photovoltaic power plant).
Status: reported
Attribution: www.brasovrenewables.ro
Source: www.brasovrenewables.ro — https://www.brasovrenewables.ro/ | published unknown | observed 2026-10-18T16:06:28.327011+00:00

## Scope
Photovoltaic facility with stated installed capacity of 30.80 MW; this figure does not establish that the capacity is commissioned.
Status: reported
Attribution: www.brasovrenewables.ro
Source: www.brasovrenewables.ro — https://www.brasovrenewables.ro/ | published unknown | observed 2026-10-18T16:06:28.327011+00:00

## Sector
Solar photovoltaic power generation.
Status: reported
Attribution: www.brasovrenewables.ro
Source: www.brasovrenewables.ro — https://www.brasovrenewables.ro/ | published unknown | observed 2026-10-18T16:06:28.327011+00:00

## Activity
Listed as “În implementare” (in implementation).
Status: reported
Attribution: www.brasovrenewables.ro
Source: www.brasovrenewables.ro — https://www.brasovrenewables.ro/ | published unknown | observed 2026-10-18T16:06:28.327011+00:00

## Location
Calea Feldioarei FN, Brașov Municipality, Brașov County.
Status: reported
Attribution: www.brasovrenewables.ro
Source: www.brasovrenewables.ro — https://www.brasovrenewables.ro/ | published unknown | observed 2026-10-18T16:06:28.327011+00:00

## Procurement
The source reports a signed supply contract no. 161 dated 16.09.2026 with ASTRONERGY SOLAR MODULES B.V. for 51,678 photovoltaic panels and 88 inverters; delivery is stated as DDP at the site within 60 and 90 days of signing, respectively. Separately, the page labels the steel-structure supply and relaunched photovoltaic-park construction procedures as active, listing offer deadlines of 13.08.2026, 12:00 and 16.10.2026, 12:00, respectively. The earlier construction procedure was annulled after errors were identified in its specifications.
Status: reported
Attribution: www.brasovrenewables.ro
Source: www.brasovrenewables.ro — https://www.brasovrenewables.ro/ | published unknown | observed 2026-10-18T16:06:28.327011+00:00

## Source Program
Modernisation Fund (Fondul pentru Modernizare).
Status: reported
Attribution: www.brasovrenewables.ro
Source: www.brasovrenewables.ro — https://www.brasovrenewables.ro/ | published unknown | observed 2026-10-18T16:06:28.327011+00:00

## Financing Stage
Financing contract no. 1170, dated 23.06.2025, is listed.
Status: reported
Attribution: www.brasovrenewables.ro
Source: www.brasovrenewables.ro — https://www.brasovrenewables.ro/ | published unknown | observed 2026-10-18T16:06:28.327011+00:00

## Financing Amount
Total project value: 140,979,465.45 lei including VAT. The amount shown as financed from the Modernisation Fund is 11,461,470.64 lei; the source also states that 8.12% of total investment is co-financed through the fund.
Status: reported
Attribution: www.brasovrenewables.ro
Source: www.brasovrenewables.ro — https://www.brasovrenewables.ro/ | published unknown | observed 2026-10-18T16:06:28.327011+00:00


## Cite this dossier

CapexCue — CEF Brașov (Centrală Fotovoltaică / photovoltaic power plant). — dossier released 2026-10-18T18:36:08.612874+00:00, release 1 (f9ba61ca-b413-4094-977c-0ad3eb67431f) — https://capexcue.com/projects/cef-brasov-centrala-fotovoltaica-photovoltaic-power-plant-f577aa8d-4d9/.

For current information and later dossier updates, visit <https://capexcue.com/projects/cef-brasov-centrala-fotovoltaica-photovoltaic-power-plant-f577aa8d-4d9/>.
This file records the release identified above; the current dossier may change.