## Project summary

The Masterton raw water supply project is located in Masterton on the true left bank of the Waingawa River. Planned works are groynes along that bank to control erosion and protect the raw water supply. At the source observation on 2026-10-02, the page reported that enabling works had begun and that the project was due for completion in 2026; it gave no exact start or completion date.

## Evidence limits and unknowns

- The source does not specify the groynes’ number, dimensions, materials, design, or precise location/chainage.
- The reported completion year is a target, not confirmation of completion. The supplied evidence does not establish subsequent project progress.
- The source reports programme-level co-funding for 16 projects, but gives no funding amount, allocation, or terms for this project.
- Mills Albert is described as lead contractor for Greater Wellington flood-resilience projects generally; the supplied text does not confirm whether that appointment covers this project.
- Evidence coverage includes the complete section for this project and selected shared sections, not the whole page. Other site sections, linked materials and media were not reviewed; no details have been inferred from them.

Current purchasing availability: unknown.
Source-dated plans do not establish current progress or available supplier packages.

## Project metadata

Country: New Zealand
Region: Oceania
Physical assets: Not classified
Derived from the exact released evidence; unresolved fields remain unclassified.

## Project category

Water and environment
Derived from the reviewed scope statement; delivery stage remains unclassified.
Build groynes along the true left bank of the Waingawa River (Waingawa Awa) to control riverbank erosion. The page explains that the true left bank is the bank on the left when facing downstream. It does not state the number, dimensions, or precise chainage of the groynes.
Source: Greater Wellington Regional Council own-text flood protection records — https://www.gw.govt.nz/your-region/emergency-and-hazard-management/flood-protection/our-work/flood-resilience-projects/ | published unknown | observed 2026-10-02T13:30:32.524561+00:00

Project overview
Oldest decisive evidence: 2026-10-02T13:30:32.524561+00:00
Newest evidence: 2026-10-02T13:30:32.524561+00:00
Knowledge reviewed: 2026-10-16T09:26:28.503812+00:00
Publication reviewed: 2026-10-16T09:26:28.503812+00:00

## Name
Masterton raw water supply project
Status: reported
Attribution: Greater Wellington Regional Council project narrative
Source: Greater Wellington Regional Council own-text flood protection records — https://www.gw.govt.nz/your-region/emergency-and-hazard-management/flood-protection/our-work/flood-resilience-projects/ | published unknown | observed 2026-10-02T13:30:32.524561+00:00

## Scope
Build groynes along the true left bank of the Waingawa River (Waingawa Awa) to control riverbank erosion. The page explains that the true left bank is the bank on the left when facing downstream. It does not state the number, dimensions, or precise chainage of the groynes.
Status: planned
Attribution: Greater Wellington Regional Council project narrative
Source: Greater Wellington Regional Council own-text flood protection records — https://www.gw.govt.nz/your-region/emergency-and-hazard-management/flood-protection/our-work/flood-resilience-projects/ | published unknown | observed 2026-10-02T13:30:32.524561+00:00

## Location
Masterton, on the true left bank of the Waingawa River (also called Waingawa Awa in the project description).
Status: reported
Attribution: Greater Wellington Regional Council project narrative
Source: Greater Wellington Regional Council own-text flood protection records — https://www.gw.govt.nz/your-region/emergency-and-hazard-management/flood-protection/our-work/flood-resilience-projects/ | published unknown | observed 2026-10-02T13:30:32.524561+00:00


## Cite this dossier

CapexCue — Masterton raw water supply project — dossier released 2026-10-16T09:26:28.893908+00:00, release 1 (b4a66f37-a776-4d51-907e-29f5aab0429e) — https://capexcue.com/projects/masterton-raw-water-supply-project-6533b9298d5cd5b0/.

For current information and later dossier updates, visit <https://capexcue.com/projects/masterton-raw-water-supply-project-6533b9298d5cd5b0/>.
This file records the release identified above; the current dossier may change.