{"name": "Umm Al Quwain IWP; the page describes it as the Umm Al Quwain Sea Water Reverse Osmosis (SWRO) Desalination Plant.", "slug": "umm-al-quwain-iwp-the-page-describes-it-as-the-umm-al-quwain-sea-water-reverse-osmosis-swro-desalination-plant-12145315-8c7", "as_of": "2026-10-17T18:45:09.182869+00:00", "depth": "basic", "facts": {"date": {"value": "Commercial operations date listed as 5 August 2022.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/umm-al-quwain-iwp/", "name": "acwapower.com", "origin": "live", "checksum": "a0f06f42ed4651452d896218211d4029654d3c52394332a84be09e8d786e55eb", "observed_at": "2026-10-17T18:36:46.024449+00:00", "revision_id": "301f649f-a86d-4121-bc4f-04f9e5c8aed9", "published_at": null}, "locator": "/html/head/main/div/section[4]/div/ul/li[6]", "claim_id": "a9e5278e-3ab1-40b2-b87f-5909d080987e", "modality": "actual", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "a4c6a316-8f35-456d-8067-954d7494d9de", "valid_until": null, "assertion_id": "4594a7ca-e984-4935-8d06-0155a0485240", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Umm Al Quwain IWP; the page describes it as the Umm Al Quwain Sea Water Reverse Osmosis (SWRO) Desalination Plant.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/umm-al-quwain-iwp/", "name": "acwapower.com", "origin": "live", "checksum": "a0f06f42ed4651452d896218211d4029654d3c52394332a84be09e8d786e55eb", "observed_at": "2026-10-17T18:36:46.024449+00:00", "revision_id": "301f649f-a86d-4121-bc4f-04f9e5c8aed9", "published_at": null}, "locator": "/html/head/main/div/section[1]/div[1]/div/div/div/div/div[1]/h3", "claim_id": "1d62e4f4-eef2-4afe-9116-fde76f99a70a", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "f2cb15c8-8e69-406a-b764-7501688cc465", "valid_until": null, "assertion_id": "17389b67-bf8e-439e-9c3f-973a3f9ae108", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Sea-water reverse-osmosis desalination plant with production capacity of 681,900 cubic meters per day (150 MIGD); spans 23.5 hectares and has a marine intake and outfall system.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/umm-al-quwain-iwp/", "name": "acwapower.com", "origin": "live", "checksum": "a0f06f42ed4651452d896218211d4029654d3c52394332a84be09e8d786e55eb", "observed_at": "2026-10-17T18:36:46.024449+00:00", "revision_id": "301f649f-a86d-4121-bc4f-04f9e5c8aed9", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "28d7b237-5cf2-4188-9e85-37b09c2e05c4", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "c0d0ffbb-d0f2-440b-9c32-4e92b53ef9f6", "valid_until": null, "assertion_id": "40d1403d-2b6f-46a6-9183-c3c92f58a8b8", "temporal_expression": "", "extraction_confidence": 0.9}, "sector": {"value": "Water desalination; sea-water reverse osmosis (SWRO) independent water project (IWP).", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/umm-al-quwain-iwp/", "name": "acwapower.com", "origin": "live", "checksum": "a0f06f42ed4651452d896218211d4029654d3c52394332a84be09e8d786e55eb", "observed_at": "2026-10-17T18:36:46.024449+00:00", "revision_id": "301f649f-a86d-4121-bc4f-04f9e5c8aed9", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "7893206c-508f-4993-a74e-d1073907475c", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "c0d0ffbb-d0f2-440b-9c32-4e92b53ef9f6", "valid_until": null, "assertion_id": "13146bfb-25a7-4e57-9960-c8e57576dd0a", "temporal_expression": "", "extraction_confidence": 0.9}, "sponsor": {"value": "Etihad Water & Electricity, identified in the key facts as formerly the Federal Electricity and Water Authority, sponsored the project and is the sole off-taker under a 35-year Water Purchase Agreement; the key facts also list a BOO offtake contract with a 35-year term.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/umm-al-quwain-iwp/", "name": "acwapower.com", "origin": "live", "checksum": "a0f06f42ed4651452d896218211d4029654d3c52394332a84be09e8d786e55eb", "observed_at": "2026-10-17T18:36:46.024449+00:00", "revision_id": "301f649f-a86d-4121-bc4f-04f9e5c8aed9", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[2]", "claim_id": "958fa885-67aa-4f20-a830-b91668b4731f", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "b139ef39-c49c-4b55-a841-0560684672ef", "valid_until": null, "assertion_id": "37519323-0ba3-4ae8-b966-13af659a7d27", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Umm Al Quwain, UAE; located south of the Ras Al Khaimah border.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/umm-al-quwain-iwp/", "name": "acwapower.com", "origin": "live", "checksum": "a0f06f42ed4651452d896218211d4029654d3c52394332a84be09e8d786e55eb", "observed_at": "2026-10-17T18:36:46.024449+00:00", "revision_id": "301f649f-a86d-4121-bc4f-04f9e5c8aed9", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "16773306-c64c-43e0-9c6a-0323e6161e49", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "c0d0ffbb-d0f2-440b-9c32-4e92b53ef9f6", "valid_until": null, "assertion_id": "46a41c0e-ab95-44e9-9361-e9e5f0157e5b", "temporal_expression": "", "extraction_confidence": 0.9}, "operator": {"value": "The listed operations and maintenance company is Acwa Operations Water Desalination Services LLC.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/umm-al-quwain-iwp/", "name": "acwapower.com", "origin": "live", "checksum": "a0f06f42ed4651452d896218211d4029654d3c52394332a84be09e8d786e55eb", "observed_at": "2026-10-17T18:36:46.024449+00:00", "revision_id": "301f649f-a86d-4121-bc4f-04f9e5c8aed9", "published_at": null}, "locator": "/html/head/main/div/section[4]/div/ul/li[11]", "claim_id": "84bd33da-a82c-4859-8e2e-012f8f954337", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "a8d2ff2a-64fd-44b2-a83b-b11fbb6eef5b", "valid_until": null, "assertion_id": "21c6c0a7-001e-497e-ae3c-bd62f8cdb3ad", "temporal_expression": "", "extraction_confidence": 0.9}, "contractor": {"value": "The listed engineering, procurement and construction company is a consortium of SIDEM and CGGC.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/umm-al-quwain-iwp/", "name": "acwapower.com", "origin": "live", "checksum": "a0f06f42ed4651452d896218211d4029654d3c52394332a84be09e8d786e55eb", "observed_at": "2026-10-17T18:36:46.024449+00:00", "revision_id": "301f649f-a86d-4121-bc4f-04f9e5c8aed9", "published_at": null}, "locator": "/html/head/main/div/section[4]/div/ul/li[12]", "claim_id": "1d2eda81-8087-439c-b2e0-53f0125ea387", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "39488332-40d7-4347-b51d-56027c81dbd5", "valid_until": null, "assertion_id": "0486015a-9d35-449b-9ec0-569399dac0b7", "temporal_expression": "", "extraction_confidence": 0.9}, "investment": {"value": "The project narrative reports total investment of approximately AED 3.0 billion; the key facts separately list project cost as US$797 million. The page does not reconcile these figures.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/umm-al-quwain-iwp/", "name": "acwapower.com", "origin": "live", "checksum": "a0f06f42ed4651452d896218211d4029654d3c52394332a84be09e8d786e55eb", "observed_at": "2026-10-17T18:36:46.024449+00:00", "revision_id": "301f649f-a86d-4121-bc4f-04f9e5c8aed9", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[2]", "claim_id": "742d8f50-8f84-4d7f-b56c-3f5dbe902076", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "b139ef39-c49c-4b55-a841-0560684672ef", "valid_until": null, "assertion_id": "0f539003-7a6a-414a-b881-ecd8d5259f89", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "e2064834-7ad3-4aab-8bc8-6fc55c6c447b", "publication": {"local_only": false, "reviewed_at": "2026-10-17T18:46:39.984513+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Acwa\u2019s project page describes Umm Al Quwain IWP as a seawater reverse-osmosis plant in Umm Al Quwain, UAE. It reports a capacity of 681,900 cubic meters per day (150 MIGD), a 23.5-hectare site, and marine intake and outfall infrastructure. Commercial operations are listed as starting on 5 August 2022. The page names Etihad Water & Electricity as sponsor and sole off-taker and lists the O&M operator and EPC consortium. It reports approximately AED 3.0 billion in total investment and separately lists US$797 million in project cost; it does not explain the difference.", "schema_version": "1.0", "public_unknowns": ["The supplied page was observed on 2026-10-17; no publication date is provided. Current procurement status, open supplier packages, and a buying window are not stated in the supplied material.", "The supplied material does not state whether upgrades are planned or identify a budget for new work."], "evidence_observed_at": "2026-10-17T18:36:46.024449+00:00", "knowledge_reviewed_at": "2026-10-17T18:45:09.548263+00:00", "decisive_evidence_observed_at": "2026-10-17T18:36:46.024449+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Umm Al Quwain IWP; the page describes it as the Umm Al Quwain Sea Water Reverse Osmosis (SWRO) Desalination Plant.", "original_project_title": "Umm Al Quwain IWP; the page describes it as the Umm Al Quwain Sea Water Reverse Osmosis (SWRO) Desalination Plant.", "canonical_url": "https://capexcue.com/projects/umm-al-quwain-iwp-the-page-describes-it-as-the-umm-al-quwain-sea-water-reverse-osmosis-swro-desalination-plant-12145315-8c7/", "release": {"id": "469efd33-fdda-4b09-bbf8-b92c7861a8f8", "number": 1, "published_at": "2026-10-17T18:47:20.196864+00:00"}, "release_reference": "release 1 (469efd33-fdda-4b09-bbf8-b92c7861a8f8)", "current_dossier_url": "https://capexcue.com/projects/umm-al-quwain-iwp-the-page-describes-it-as-the-umm-al-quwain-sea-water-reverse-osmosis-swro-desalination-plant-12145315-8c7/", "citation": "CapexCue \u2014 Umm Al Quwain IWP; the page describes it as the Umm Al Quwain Sea Water Reverse Osmosis (SWRO) Desalination Plant. \u2014 dossier released 2026-10-17T18:47:20.196864+00:00, release 1 (469efd33-fdda-4b09-bbf8-b92c7861a8f8) \u2014 https://capexcue.com/projects/umm-al-quwain-iwp-the-page-describes-it-as-the-umm-al-quwain-sea-water-reverse-osmosis-swro-desalination-plant-12145315-8c7/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "water_environment", "support": {"end": 177, "start": 0, "sources": [{"url": "https://acwapower.com/en/what-we-do/projects/umm-al-quwain-iwp/", "name": "acwapower.com", "origin": "live", "checksum": "a0f06f42ed4651452d896218211d4029654d3c52394332a84be09e8d786e55eb", "observed_at": "2026-10-17T18:36:46.024449+00:00", "revision_id": "301f649f-a86d-4121-bc4f-04f9e5c8aed9", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Sea-water reverse-osmosis desalination plant with production capacity of 681,900 cubic meters per day (150 MIGD); spans 23.5 hectares and has a marine intake and outfall system.", "statement": "Sea-water reverse-osmosis desalination plant with production capacity of 681,900 cubic meters per day (150 MIGD); spans 23.5 hectares and has a marine intake and outfall system.", "qualifications": {"attribution": "acwapower.com"}}, "label": "Water and environment", "icon": "water"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "water_environment", "support": {"end": 177, "start": 0, "sources": [{"url": "https://acwapower.com/en/what-we-do/projects/umm-al-quwain-iwp/", "name": "acwapower.com", "origin": "live", "checksum": "a0f06f42ed4651452d896218211d4029654d3c52394332a84be09e8d786e55eb", "observed_at": "2026-10-17T18:36:46.024449+00:00", "revision_id": "301f649f-a86d-4121-bc4f-04f9e5c8aed9", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Sea-water reverse-osmosis desalination plant with production capacity of 681,900 cubic meters per day (150 MIGD); spans 23.5 hectares and has a marine intake and outfall system.", "statement": "Sea-water reverse-osmosis desalination plant with production capacity of 681,900 cubic meters per day (150 MIGD); spans 23.5 hectares and has a marine intake and outfall system.", "qualifications": {"attribution": "acwapower.com"}}}, "input_hash": "0f8f32b95351bf7676da09c426b4845c0578caefdc7d27b8fcdd17e17f807590", "release_id": "469efd33-fdda-4b09-bbf8-b92c7861a8f8", "type_codes": ["desalination"], "field_states": {"type": {"state": "accepted", "reason": "Umm Al Quwain and Ras Al Khaimah are in the United Arab Emirates; SWRO plant and intake/outfall scope are explicit."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Umm Al Quwain and Ras Al Khaimah are in the United Arab Emirates; SWRO plant and intake/outfall scope are explicit."}, "category": {"state": "accepted", "reason": "Umm Al Quwain and Ras Al Khaimah are in the United Arab Emirates; SWRO plant and intake/outfall scope are explicit."}}, "region_codes": ["middle_east_north_africa"], "release_hash": "f947742b52de0a27e53ffe855b9e4add038fdd1767c36e17eab512346401aae8", "assessment_id": "7f7c76cd-d6d1-46ac-a516-50d61a8983e3", "country_codes": ["AE"], "assessment_hash": "f9e840111533330a09ae29d3f770938289505db97f0a0936ba976a8e471711dc", "country_label": "United Arab Emirates", "region_label": "Middle East North Africa", "type_labels": ["Desalination"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}