{"name": "Baker Project", "slug": "baker-project-f48724b50ed3f6c5", "as_of": "2026-10-02T22:01:35.703840+00:00", "depth": "basic", "facts": {"name": {"value": "Baker Project", "rights": "facts_only", "source": {"url": "https://www.usbr.gov/projects/index.php?id=516", "name": "US Bureau of Reclamation screened government project narrative", "origin": "live", "checksum": "4f87678baeb4d39f10064105d57c99b785ffc02edfc6273361122981c35210ad", "observed_at": "2026-10-02T19:26:31.625853+00:00", "revision_id": "cde4ad81-cd52-44af-a381-48eecdd60a33", "published_at": null}, "locator": "/html/body/div/div[4]/div/div[2]/div[3]/div[1]/h1", "claim_id": "883d34ff-58a6-42b6-9596-abffab113f30", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "US Bureau of Reclamation own-government project narrative", "evidence_id": "50e88b64-9bb2-49f1-8ce1-44b51add4bbb", "valid_until": null, "assertion_id": "8a1a01ce-6df5-4f31-a8bb-a584348877f4", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "The project has Lower and Upper divisions. The Lower Division\u2019s described federal facility is Thief Valley Dam; its carriage and distribution facilities were privately constructed. The Upper Division\u2019s major features are Mason Dam, Phillips Lake, Lilley Pumping Plant, Lilley Relift Pumping Plant, and recreation facilities. The source also describes the dams, reservoir, and pumping plants\u2019 dimensions and capacities. These are existing project features described by the page, not evidence of new construction.", "rights": "facts_only", "source": {"url": "https://www.usbr.gov/projects/index.php?id=516", "name": "US Bureau of Reclamation screened government project narrative", "origin": "live", "checksum": "4f87678baeb4d39f10064105d57c99b785ffc02edfc6273361122981c35210ad", "observed_at": "2026-10-02T19:26:31.625853+00:00", "revision_id": "cde4ad81-cd52-44af-a381-48eecdd60a33", "published_at": null}, "locator": "/html/body/div/div[4]/div/div[2]/div[3]/div[4]/p[2]", "claim_id": "671a0cd1-8663-4b57-b99b-a6436b5ad96e", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "US Bureau of Reclamation own-government project narrative", "evidence_id": "ccaee2b5-ae72-456a-b394-40f366b0e080", "valid_until": null, "assertion_id": "8f941c86-2d4b-48ac-883d-dbebe2f5e6de", "temporal_expression": "", "extraction_confidence": 0.9}, "delivery": {"value": "The source reports construction of Thief Valley Dam beginning September 12, 1931, and completing May 6, 1932; Upper Division facilities began construction in 1965 and were completed in 1968. These are historical construction dates, not evidence of present works.", "rights": "facts_only", "source": {"url": "https://www.usbr.gov/projects/index.php?id=516", "name": "US Bureau of Reclamation screened government project narrative", "origin": "live", "checksum": "4f87678baeb4d39f10064105d57c99b785ffc02edfc6273361122981c35210ad", "observed_at": "2026-10-02T19:26:31.625853+00:00", "revision_id": "cde4ad81-cd52-44af-a381-48eecdd60a33", "published_at": null}, "locator": "/html/body/div/div[4]/div/div[2]/div[3]/div[6]/p[2]", "claim_id": "ac6f25ec-d4bf-4bba-a1a3-3a996c9c9371", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "US Bureau of Reclamation own-government project narrative", "evidence_id": "b6ae5368-55a1-4a37-8165-e9b88b0c3019", "valid_until": null, "assertion_id": "159ef435-9203-45dc-aaa3-99ee6399f398", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "East-central Oregon, in Baker County and the Baker/Powder River area. The source places the Lower Division\u2019s service area along the Powder River northeast of Baker and the Upper Division\u2019s service area adjacent to and north of Baker, on both sides of the Powder River.", "rights": "facts_only", "source": {"url": "https://www.usbr.gov/projects/index.php?id=516", "name": "US Bureau of Reclamation screened government project narrative", "origin": "live", "checksum": "4f87678baeb4d39f10064105d57c99b785ffc02edfc6273361122981c35210ad", "observed_at": "2026-10-02T19:26:31.625853+00:00", "revision_id": "cde4ad81-cd52-44af-a381-48eecdd60a33", "published_at": null}, "locator": "/html/body/div/div[4]/div/div[2]/div[3]/div[1]/div[2]/p[1]", "claim_id": "2536f1a7-335a-4c8b-9871-2681864a2f7c", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "US Bureau of Reclamation own-government project narrative", "evidence_id": "d2d1f0e6-070e-48ad-b795-105739ee9e47", "valid_until": null, "assertion_id": "ce842698-4fce-45e0-9f2d-e1a642d2ae12", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "e65b6df5-9fe6-40d3-89df-69c9d6f676b4", "publication": {"local_only": false, "reviewed_at": "2026-10-16T13:19:43.309305+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "The Baker Project has Lower and Upper divisions and provides supplemental irrigation water. Its described facilities include Thief Valley Dam in the Lower Division and Mason Dam, Phillips Lake, and the Lilley pumping plants in the Upper Division. The source reports historical construction dates for Thief Valley Dam and Upper Division facilities; these do not indicate current construction.", "schema_version": "1.0", "public_unknowns": ["The source page is undated. The supplied evidence snapshot was observed on 2026-10-02; that is not a source publication date. The supplied context is partial: the whole document was not reviewed, and linked documents and images were not acquired or interpreted.", "Current project status, present or planned works, an upcoming milestone, procurement plans or availability, purchasing packages, and financing are not established. The Current Conditions area presents resource labels and links rather than a status report."], "evidence_observed_at": "2026-10-02T19:26:31.625853+00:00", "knowledge_reviewed_at": "2026-10-16T13:19:43.309305+00:00", "decisive_evidence_observed_at": "2026-10-02T19:26:31.625853+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Baker Project", "original_project_title": "Baker Project", "canonical_url": "https://capexcue.com/projects/baker-project-f48724b50ed3f6c5/", "release": {"id": "0f0da406-741b-4677-b2a8-c4472ef65347", "number": 1, "published_at": "2026-10-16T13:19:44.018740+00:00"}, "release_reference": "release 1 (0f0da406-741b-4677-b2a8-c4472ef65347)", "current_dossier_url": "https://capexcue.com/projects/baker-project-f48724b50ed3f6c5/", "citation": "CapexCue \u2014 Baker Project \u2014 dossier released 2026-10-16T13:19:44.018740+00:00, release 1 (0f0da406-741b-4677-b2a8-c4472ef65347) \u2014 https://capexcue.com/projects/baker-project-f48724b50ed3f6c5/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "water_environment", "support": {"end": 511, "start": 0, "sources": [{"url": "https://www.usbr.gov/projects/index.php?id=516", "name": "US Bureau of Reclamation screened government project narrative", "origin": "live", "checksum": "4f87678baeb4d39f10064105d57c99b785ffc02edfc6273361122981c35210ad", "observed_at": "2026-10-02T19:26:31.625853+00:00", "revision_id": "cde4ad81-cd52-44af-a381-48eecdd60a33", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "The project has Lower and Upper divisions. The Lower Division\u2019s described federal facility is Thief Valley Dam; its carriage and distribution facilities were privately constructed. The Upper Division\u2019s major features are Mason Dam, Phillips Lake, Lilley Pumping Plant, Lilley Relift Pumping Plant, and recreation facilities. The source also describes the dams, reservoir, and pumping plants\u2019 dimensions and capacities. These are existing project features described by the page, not evidence of new construction.", "statement": "The project has Lower and Upper divisions. The Lower Division\u2019s described federal facility is Thief Valley Dam; its carriage and distribution facilities were privately constructed. The Upper Division\u2019s major features are Mason Dam, Phillips Lake, Lilley Pumping Plant, Lilley Relift Pumping Plant, and recreation facilities. The source also describes the dams, reservoir, and pumping plants\u2019 dimensions and capacities. These are existing project features described by the page, not evidence of new construction.", "qualifications": {"attribution": "US Bureau of Reclamation own-government project narrative"}}, "label": "Water and environment", "icon": "water"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "water_environment", "support": {"end": 511, "start": 0, "sources": [{"url": "https://www.usbr.gov/projects/index.php?id=516", "name": "US Bureau of Reclamation screened government project narrative", "origin": "live", "checksum": "4f87678baeb4d39f10064105d57c99b785ffc02edfc6273361122981c35210ad", "observed_at": "2026-10-02T19:26:31.625853+00:00", "revision_id": "cde4ad81-cd52-44af-a381-48eecdd60a33", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "The project has Lower and Upper divisions. The Lower Division\u2019s described federal facility is Thief Valley Dam; its carriage and distribution facilities were privately constructed. The Upper Division\u2019s major features are Mason Dam, Phillips Lake, Lilley Pumping Plant, Lilley Relift Pumping Plant, and recreation facilities. The source also describes the dams, reservoir, and pumping plants\u2019 dimensions and capacities. These are existing project features described by the page, not evidence of new construction.", "statement": "The project has Lower and Upper divisions. The Lower Division\u2019s described federal facility is Thief Valley Dam; its carriage and distribution facilities were privately constructed. The Upper Division\u2019s major features are Mason Dam, Phillips Lake, Lilley Pumping Plant, Lilley Relift Pumping Plant, and recreation facilities. The source also describes the dams, reservoir, and pumping plants\u2019 dimensions and capacities. These are existing project features described by the page, not evidence of new construction.", "qualifications": {"attribution": "US Bureau of Reclamation own-government project narrative"}}}, "input_hash": "3abf1a76f41c6c4f000ab8118453a3e6cd93a94863c02e68d1f6008410f663d9", "release_id": "0f0da406-741b-4677-b2a8-c4472ef65347", "type_codes": [], "field_states": {"type": {"state": "unknown_after_assessment", "reason": "Oregon dams, reservoir and pumping works; these are historical facilities, not new construction. No registered irrigation type."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Oregon dams, reservoir and pumping works; these are historical facilities, not new construction. No registered irrigation type."}, "category": {"state": "accepted", "reason": "Oregon dams, reservoir and pumping works; these are historical facilities, not new construction. No registered irrigation type."}}, "region_codes": ["north_america"], "release_hash": "35ba84514f09dd293cb8c6453d3419285e7ec16e62a85b2e730abf65fc645370", "assessment_id": "6053442f-b303-4b60-b324-309f9dea423d", "country_codes": ["US"], "assessment_hash": "e0f21a37d07ad2a319d3f9de4b4486885488b42dff9ae3f6eb39cb2090f1ee5b", "country_label": "United States", "region_label": "North America", "type_labels": []}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}