# Kosamba Rail-over-Rail (RoR) flyover for the Kosamba–Umrapada Gauge Conversion section

Publisher: CapexCue
Canonical dossier: <https://capexcue.com/projects/kosamba-rail-over-rail-ror-flyover-for-the-kosambaumrapada-gauge-conversion-section-5cb7679c-b40/>
Dossier reference: release 1 (312817ae-2485-4b42-bad1-bead69178409)

Released project intelligence

Oldest supporting observation: 2026-10-18T19:59:52.365135+00:00
Dossier released: 2026-10-18T21:48:14.174436+00:00
Source report dates and capture dates are listed per fact below; neither establishes an event date.

## Project summary

A PIB release posted 24 MAR 2026 11:38AM reports approval of a Rail-over-Rail flyover at Kosamba to connect the Kosamba–Umrapada Gauge Conversion section with the Mumbai–Vadodara main line, avoiding surface crossings. The 9.20 km figure is the length of the Gauge Conversion section, not the flyover. The reported estimated completion cost is ₹344.38 crore; the release does not identify it as a procurement budget.

## Evidence limits and unknowns

- The 24 MAR 2026 release does not state procurement or tender status, bid packages, contractor/EPC, a project schedule, or a next milestone.

Current purchasing availability: unknown.
Source-dated plans do not establish current progress or available supplier packages.

## Project metadata

Country: India
Region: Asia
Physical assets: Railway
Derived from the exact released evidence; unresolved fields remain unclassified.

## Project category

Transport and logistics
Derived from the reviewed scope statement; delivery stage remains unclassified.
Construction of a Rail-over-Rail flyover to connect the 9.20 km Kosamba–Umrapada Gauge Conversion section with the Mumbai–Vadodara main line, avoiding surface crossings. The 9.20 km figure refers to the Gauge Conversion section, not the flyover.
Source: www.pib.gov.in — https://www.pib.gov.in/PressReleasePage.aspx?PRID=2244296&lang=1&reg=3 | published unknown | observed 2026-10-18T19:59:52.365135+00:00

Project overview
Oldest decisive evidence: 2026-10-18T19:59:52.365135+00:00
Newest evidence: 2026-10-18T19:59:52.365135+00:00
Knowledge reviewed: 2026-10-18T21:44:29.738737+00:00
Publication reviewed: 2026-10-18T21:48:05.292708+00:00

## Date
The release was posted 24 MAR 2026 11:38AM by PIB Delhi.
Status: reported
Attribution: www.pib.gov.in
Source: www.pib.gov.in — https://www.pib.gov.in/PressReleasePage.aspx?PRID=2244296&lang=1&reg=3 | published unknown | observed 2026-10-18T19:59:52.365135+00:00

## Name
Kosamba Rail-over-Rail (RoR) flyover for the Kosamba–Umrapada Gauge Conversion section
Status: reported
Attribution: www.pib.gov.in
Source: www.pib.gov.in — https://www.pib.gov.in/PressReleasePage.aspx?PRID=2244296&lang=1&reg=3 | published unknown | observed 2026-10-18T19:59:52.365135+00:00

## Scope
Construction of a Rail-over-Rail flyover to connect the 9.20 km Kosamba–Umrapada Gauge Conversion section with the Mumbai–Vadodara main line, avoiding surface crossings. The 9.20 km figure refers to the Gauge Conversion section, not the flyover.
Status: planned
Attribution: www.pib.gov.in
Source: www.pib.gov.in — https://www.pib.gov.in/PressReleasePage.aspx?PRID=2244296&lang=1&reg=3 | published unknown | observed 2026-10-18T19:59:52.365135+00:00

## Location
Kosamba, Gujarat, in Western Railway; the Kosamba–Umrapada section lies on the eastern side of the Mumbai–Vadodara main line.
Status: reported
Attribution: www.pib.gov.in
Source: www.pib.gov.in — https://www.pib.gov.in/PressReleasePage.aspx?PRID=2244296&lang=1&reg=3 | published unknown | observed 2026-10-18T19:59:52.365135+00:00

## Financing Stage
Indian Railways has approved construction of the flyover.
Status: reported
Attribution: www.pib.gov.in
Source: www.pib.gov.in — https://www.pib.gov.in/PressReleasePage.aspx?PRID=2244296&lang=1&reg=3 | published unknown | observed 2026-10-18T19:59:52.365135+00:00

## Financing Amount
₹344.38 crore total estimated completion cost for the Kosamba flyover; the source does not identify this as a procurement budget.
Status: reported
Attribution: www.pib.gov.in
Source: www.pib.gov.in — https://www.pib.gov.in/PressReleasePage.aspx?PRID=2244296&lang=1&reg=3 | published unknown | observed 2026-10-18T19:59:52.365135+00:00


## Cite this dossier

CapexCue — Kosamba Rail-over-Rail (RoR) flyover for the Kosamba–Umrapada Gauge Conversion section — dossier released 2026-10-18T21:48:14.174436+00:00, release 1 (312817ae-2485-4b42-bad1-bead69178409) — https://capexcue.com/projects/kosamba-rail-over-rail-ror-flyover-for-the-kosambaumrapada-gauge-conversion-section-5cb7679c-b40/.

For current information and later dossier updates, visit <https://capexcue.com/projects/kosamba-rail-over-rail-ror-flyover-for-the-kosambaumrapada-gauge-conversion-section-5cb7679c-b40/>.
This file records the release identified above; the current dossier may change.