{"name": "Identified in the source descriptively as the first 500 MW pumped-storage project on the Chitravathi River; the source does not provide a formal project name.", "slug": "identified-in-the-source-descriptively-as-the-first-500-mw-pumped-storage-project-on-the-chitravathi-river-the-source-do-59f5bd38-673", "as_of": "2026-10-17T10:25:45.926230+00:00", "depth": "basic", "facts": {"name": {"value": "Identified in the source descriptively as the first 500 MW pumped-storage project on the Chitravathi River; the source does not provide a formal project name.", "rights": "facts_only", "source": {"url": "https://www.adanigreenenergy.com/digital-reports/green-energy/2026/engineering-reliability-into-the-transition.html", "name": "www.adanigreenenergy.com", "origin": "live", "checksum": "aa244272d092d5a0ee82ac9bd52c6298f2d3bb71c18102650952b2104c34320d", "observed_at": "2026-10-17T10:10:44.910061+00:00", "revision_id": "4e74489c-58f8-4b80-9a1a-b3c1233f7f1f", "published_at": null}, "locator": "/html/body/div/section[2]/div/p[2]", "claim_id": "93147b3a-963f-49d9-baa0-7aa203eeddbe", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.adanigreenenergy.com", "evidence_id": "03bbb885-e800-43c0-a362-0b1b4f0dd83e", "valid_until": null, "assertion_id": "a0031154-581c-475a-9ab4-6976b7398463", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "500 MW hydro pumped-storage project (PSP).", "rights": "facts_only", "source": {"url": "https://www.adanigreenenergy.com/digital-reports/green-energy/2026/engineering-reliability-into-the-transition.html", "name": "www.adanigreenenergy.com", "origin": "live", "checksum": "aa244272d092d5a0ee82ac9bd52c6298f2d3bb71c18102650952b2104c34320d", "observed_at": "2026-10-17T10:10:44.910061+00:00", "revision_id": "4e74489c-58f8-4b80-9a1a-b3c1233f7f1f", "published_at": null}, "locator": "/html/body/div/section[2]/div/p[2]", "claim_id": "e930367b-7d86-4238-8a6d-c67078ce8645", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.adanigreenenergy.com", "evidence_id": "03bbb885-e800-43c0-a362-0b1b4f0dd83e", "valid_until": null, "assertion_id": "4a76855c-0112-4655-804c-727721b5027b", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "The source says its five hydro-pumped-storage projects are progressing as planned and identifies this as the first 500 MW PSP on the Chitravathi River.", "rights": "facts_only", "source": {"url": "https://www.adanigreenenergy.com/digital-reports/green-energy/2026/engineering-reliability-into-the-transition.html", "name": "www.adanigreenenergy.com", "origin": "live", "checksum": "aa244272d092d5a0ee82ac9bd52c6298f2d3bb71c18102650952b2104c34320d", "observed_at": "2026-10-17T10:10:44.910061+00:00", "revision_id": "4e74489c-58f8-4b80-9a1a-b3c1233f7f1f", "published_at": null}, "locator": "/html/body/div/section[2]/div/p[2]", "claim_id": "3cd65af9-e8d3-43a9-b3eb-46d4339e8f4e", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.adanigreenenergy.com", "evidence_id": "03bbb885-e800-43c0-a362-0b1b4f0dd83e", "valid_until": null, "assertion_id": "064040a7-4287-45fa-afb9-bb6621b93870", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Chitravathi River, Andhra Pradesh.", "rights": "facts_only", "source": {"url": "https://www.adanigreenenergy.com/digital-reports/green-energy/2026/engineering-reliability-into-the-transition.html", "name": "www.adanigreenenergy.com", "origin": "live", "checksum": "aa244272d092d5a0ee82ac9bd52c6298f2d3bb71c18102650952b2104c34320d", "observed_at": "2026-10-17T10:10:44.910061+00:00", "revision_id": "4e74489c-58f8-4b80-9a1a-b3c1233f7f1f", "published_at": null}, "locator": "/html/body/div/section[2]/div/p[2]", "claim_id": "fe73bf3e-4b39-4e5b-bfe0-d8f6be31d171", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.adanigreenenergy.com", "evidence_id": "03bbb885-e800-43c0-a362-0b1b4f0dd83e", "valid_until": null, "assertion_id": "2975ea81-89d9-4f79-a24d-a6df34bf662f", "temporal_expression": "", "extraction_confidence": 0.9}, "next_milestone": {"value": "Expected to be completed in one of the shortest timelines; no specific completion date is given.", "rights": "facts_only", "source": {"url": "https://www.adanigreenenergy.com/digital-reports/green-energy/2026/engineering-reliability-into-the-transition.html", "name": "www.adanigreenenergy.com", "origin": "live", "checksum": "aa244272d092d5a0ee82ac9bd52c6298f2d3bb71c18102650952b2104c34320d", "observed_at": "2026-10-17T10:10:44.910061+00:00", "revision_id": "4e74489c-58f8-4b80-9a1a-b3c1233f7f1f", "published_at": null}, "locator": "/html/body/div/section[2]/div/p[2]", "claim_id": "b8cc4239-35af-43e5-8342-c866a7cc389d", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.adanigreenenergy.com", "evidence_id": "03bbb885-e800-43c0-a362-0b1b4f0dd83e", "valid_until": null, "assertion_id": "d347706d-942b-44e3-ae0e-f1a7e67e9171", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "eb1bdf56-2e6d-462a-b8b4-3772425ba234", "publication": {"local_only": false, "reviewed_at": "2026-10-17T10:27:14.347381+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Adani Green Energy\u2019s Integrated Annual Report 2025-26 describes a 500 MW hydro pumped-storage project on the Chitravathi River in Andhra Pradesh. It identifies the project descriptively, without giving a formal name. The report says its five hydro-PSP projects are progressing as planned and gives a general completion expectation for this project, but no calendar target.", "schema_version": "1.0", "public_unknowns": ["The cited passage does not give a formal project name, a specific completion date, or project-specific procurement details."], "evidence_observed_at": "2026-10-17T10:10:44.910061+00:00", "knowledge_reviewed_at": "2026-10-17T10:25:46.221126+00:00", "decisive_evidence_observed_at": "2026-10-17T10:10:44.910061+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Identified in the source descriptively as the first 500 MW pumped-storage project on the Chitravathi River; the source does not provide a formal project name.", "original_project_title": "Identified in the source descriptively as the first 500 MW pumped-storage project on the Chitravathi River; the source does not provide a formal project name.", "canonical_url": "https://capexcue.com/projects/identified-in-the-source-descriptively-as-the-first-500-mw-pumped-storage-project-on-the-chitravathi-river-the-source-do-59f5bd38-673/", "release": {"id": "91b91471-847e-4837-a9c4-a58dbc8a76e4", "number": 1, "published_at": "2026-10-17T10:27:50.560394+00:00"}, "release_reference": "release 1 (91b91471-847e-4837-a9c4-a58dbc8a76e4)", "current_dossier_url": "https://capexcue.com/projects/identified-in-the-source-descriptively-as-the-first-500-mw-pumped-storage-project-on-the-chitravathi-river-the-source-do-59f5bd38-673/", "citation": "CapexCue \u2014 Identified in the source descriptively as the first 500 MW pumped-storage project on the Chitravathi River; the source does not provide a formal project name. \u2014 dossier released 2026-10-17T10:27:50.560394+00:00, release 1 (91b91471-847e-4837-a9c4-a58dbc8a76e4) \u2014 https://capexcue.com/projects/identified-in-the-source-descriptively-as-the-first-500-mw-pumped-storage-project-on-the-chitravathi-river-the-source-do-59f5bd38-673/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 42, "start": 0, "sources": [{"url": "https://www.adanigreenenergy.com/digital-reports/green-energy/2026/engineering-reliability-into-the-transition.html", "name": "www.adanigreenenergy.com", "origin": "live", "checksum": "aa244272d092d5a0ee82ac9bd52c6298f2d3bb71c18102650952b2104c34320d", "observed_at": "2026-10-17T10:10:44.910061+00:00", "revision_id": "4e74489c-58f8-4b80-9a1a-b3c1233f7f1f", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "500 MW hydro pumped-storage project (PSP).", "statement": "500 MW hydro pumped-storage project (PSP).", "qualifications": {"attribution": "www.adanigreenenergy.com"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 42, "start": 0, "sources": [{"url": "https://www.adanigreenenergy.com/digital-reports/green-energy/2026/engineering-reliability-into-the-transition.html", "name": "www.adanigreenenergy.com", "origin": "live", "checksum": "aa244272d092d5a0ee82ac9bd52c6298f2d3bb71c18102650952b2104c34320d", "observed_at": "2026-10-17T10:10:44.910061+00:00", "revision_id": "4e74489c-58f8-4b80-9a1a-b3c1233f7f1f", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "500 MW hydro pumped-storage project (PSP).", "statement": "500 MW hydro pumped-storage project (PSP).", "qualifications": {"attribution": "www.adanigreenenergy.com"}}}, "input_hash": "ceb0f7b76e348878c8c901b226fbd3e116b13869642eed3be7b793ae1155a2fc", "release_id": "91b91471-847e-4837-a9c4-a58dbc8a76e4", "type_codes": ["pumped_hydro"], "field_states": {"type": {"state": "accepted", "reason": "Chitravathi River, Andhra Pradesh is in India; pumped-storage scope is explicit despite no formal project title."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Chitravathi River, Andhra Pradesh is in India; pumped-storage scope is explicit despite no formal project title."}, "category": {"state": "accepted", "reason": "Chitravathi River, Andhra Pradesh is in India; pumped-storage scope is explicit despite no formal project title."}}, "region_codes": ["asia"], "release_hash": "6eea7b11e1470b411707f8e9f36f6b266ea5d9fa55904ed836a51ce7afb47bbe", "assessment_id": "a1aa4e97-690b-45cc-a484-0a3e72c3e777", "country_codes": ["IN"], "assessment_hash": "cc2640b2a687cdc9d13214b0ae6df0efdbb44c414abed2406f08327fa3636927", "country_label": "India", "region_label": "Asia", "type_labels": ["Pumped Hydro"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}