# Identified in the source descriptively as the first 500 MW pumped-storage project on the Chitravathi River; the source does not provide a formal project name.

Publisher: CapexCue
Canonical dossier: <https://capexcue.com/projects/identified-in-the-source-descriptively-as-the-first-500-mw-pumped-storage-project-on-the-chitravathi-river-the-source-do-59f5bd38-673/>
Dossier reference: release 1 (91b91471-847e-4837-a9c4-a58dbc8a76e4)

Released project intelligence

Oldest supporting observation: 2026-10-17T10:10:44.910061+00:00
Dossier released: 2026-10-17T10:27:50.560394+00:00
Source report dates and capture dates are listed per fact below; neither establishes an event date.

## Project summary

Adani Green Energy’s Integrated Annual Report 2025-26 describes a 500 MW hydro pumped-storage project on the Chitravathi River in Andhra Pradesh. It identifies the project descriptively, without giving a formal name. The report says its five hydro-PSP projects are progressing as planned and gives a general completion expectation for this project, but no calendar target.

## Evidence limits and unknowns

- The cited passage does not give a formal project name, a specific completion date, or project-specific procurement details.

Current purchasing availability: unknown.
Source-dated plans do not establish current progress or available supplier packages.

## Project metadata

Country: India
Region: Asia
Physical assets: Pumped Hydro
Derived from the exact released evidence; unresolved fields remain unclassified.

## Project category

Energy
Derived from the reviewed scope statement; delivery stage remains unclassified.
500 MW hydro pumped-storage project (PSP).
Source: www.adanigreenenergy.com — https://www.adanigreenenergy.com/digital-reports/green-energy/2026/engineering-reliability-into-the-transition.html | published unknown | observed 2026-10-17T10:10:44.910061+00:00

Project overview
Oldest decisive evidence: 2026-10-17T10:10:44.910061+00:00
Newest evidence: 2026-10-17T10:10:44.910061+00:00
Knowledge reviewed: 2026-10-17T10:25:46.221126+00:00
Publication reviewed: 2026-10-17T10:27:14.347381+00:00

## Name
Identified in the source descriptively as the first 500 MW pumped-storage project on the Chitravathi River; the source does not provide a formal project name.
Status: reported
Attribution: www.adanigreenenergy.com
Source: www.adanigreenenergy.com — https://www.adanigreenenergy.com/digital-reports/green-energy/2026/engineering-reliability-into-the-transition.html | published unknown | observed 2026-10-17T10:10:44.910061+00:00

## Scope
500 MW hydro pumped-storage project (PSP).
Status: planned
Attribution: www.adanigreenenergy.com
Source: www.adanigreenenergy.com — https://www.adanigreenenergy.com/digital-reports/green-energy/2026/engineering-reliability-into-the-transition.html | published unknown | observed 2026-10-17T10:10:44.910061+00:00

## Activity
The source says its five hydro-pumped-storage projects are progressing as planned and identifies this as the first 500 MW PSP on the Chitravathi River.
Status: reported
Attribution: www.adanigreenenergy.com
Source: www.adanigreenenergy.com — https://www.adanigreenenergy.com/digital-reports/green-energy/2026/engineering-reliability-into-the-transition.html | published unknown | observed 2026-10-17T10:10:44.910061+00:00

## Location
Chitravathi River, Andhra Pradesh.
Status: reported
Attribution: www.adanigreenenergy.com
Source: www.adanigreenenergy.com — https://www.adanigreenenergy.com/digital-reports/green-energy/2026/engineering-reliability-into-the-transition.html | published unknown | observed 2026-10-17T10:10:44.910061+00:00

## Next Milestone
Expected to be completed in one of the shortest timelines; no specific completion date is given.
Status: planned
Attribution: www.adanigreenenergy.com
Source: www.adanigreenenergy.com — https://www.adanigreenenergy.com/digital-reports/green-energy/2026/engineering-reliability-into-the-transition.html | published unknown | observed 2026-10-17T10:10:44.910061+00:00


## Cite this dossier

CapexCue — Identified in the source descriptively as the first 500 MW pumped-storage project on the Chitravathi River; the source does not provide a formal project name. — dossier released 2026-10-17T10:27:50.560394+00:00, release 1 (91b91471-847e-4837-a9c4-a58dbc8a76e4) — https://capexcue.com/projects/identified-in-the-source-descriptively-as-the-first-500-mw-pumped-storage-project-on-the-chitravathi-river-the-source-do-59f5bd38-673/.

For current information and later dossier updates, visit <https://capexcue.com/projects/identified-in-the-source-descriptively-as-the-first-500-mw-pumped-storage-project-on-the-chitravathi-river-the-source-do-59f5bd38-673/>.
This file records the release identified above; the current dossier may change.