{"name": "Laylaa Solar PV IPP", "slug": "laylaa-solar-pv-ipp-5c17cc6b-7e6", "as_of": "2026-10-18T06:27:52.754347+00:00", "depth": "basic", "facts": {"date": {"value": "The source says the project was expected to be fully operational by 2024; it does not confirm whether that expectation was achieved.", "rights": "facts_only", "source": {"url": "https://www.acwapower.com/en/what-we-do/projects/laylaa-solar-pv-ipp/", "name": "www.acwapower.com", "origin": "live", "checksum": "df849bc4ada31ae5a83aeac611a2178d3fade87ced5943d82bdf6d85f97e540e", "observed_at": "2026-10-17T20:08:47.822313+00:00", "revision_id": "53f42571-1a81-4b49-b9df-3f06f36a65e4", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[2]", "claim_id": "88558c87-c770-4182-a5e7-59fcbb9e2357", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.acwapower.com", "evidence_id": "15277d40-e100-4de1-aa1a-e338e667b00d", "valid_until": null, "assertion_id": "1a43133d-27ee-4116-afce-ab5aaec3ece5", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Laylaa Solar PV IPP", "rights": "facts_only", "source": {"url": "https://www.acwapower.com/en/what-we-do/projects/laylaa-solar-pv-ipp/", "name": "www.acwapower.com", "origin": "live", "checksum": "df849bc4ada31ae5a83aeac611a2178d3fade87ced5943d82bdf6d85f97e540e", "observed_at": "2026-10-17T20:08:47.822313+00:00", "revision_id": "53f42571-1a81-4b49-b9df-3f06f36a65e4", "published_at": null}, "locator": "/html/head/main/div/section[1]/div[1]/div/div/div/div/div[1]/h3", "claim_id": "85c10b55-2de9-45dd-81f5-6f7d62771cd8", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acwapower.com", "evidence_id": "b541c05d-978c-4323-bfd8-ea537712993e", "valid_until": null, "assertion_id": "32343e0a-c44e-4aa0-8fe4-6b56922f3d45", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "A 91 MW solar photovoltaic independent power project.", "rights": "facts_only", "source": {"url": "https://www.acwapower.com/en/what-we-do/projects/laylaa-solar-pv-ipp/", "name": "www.acwapower.com", "origin": "live", "checksum": "df849bc4ada31ae5a83aeac611a2178d3fade87ced5943d82bdf6d85f97e540e", "observed_at": "2026-10-17T20:08:47.822313+00:00", "revision_id": "53f42571-1a81-4b49-b9df-3f06f36a65e4", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "418507a4-534e-4a34-be93-ddff247ccf7a", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acwapower.com", "evidence_id": "5a6498a8-21dc-4fb9-8f69-bd220b3d0996", "valid_until": null, "assertion_id": "2856aad4-8975-445a-bb8d-2b008495fd1d", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Aflaj governorate, Riyadh province, Saudi Arabia.", "rights": "facts_only", "source": {"url": "https://www.acwapower.com/en/what-we-do/projects/laylaa-solar-pv-ipp/", "name": "www.acwapower.com", "origin": "live", "checksum": "df849bc4ada31ae5a83aeac611a2178d3fade87ced5943d82bdf6d85f97e540e", "observed_at": "2026-10-17T20:08:47.822313+00:00", "revision_id": "53f42571-1a81-4b49-b9df-3f06f36a65e4", "published_at": null}, "locator": "/html/head/main/div/section[4]/div/ul/li[1]", "claim_id": "84853cd8-d219-4125-a881-8f9cd03a1133", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acwapower.com", "evidence_id": "a1dfcd8e-41f6-4b43-a69f-2581fc6f6d5a", "valid_until": null, "assertion_id": "e3ab20b1-fa52-47a4-8af1-4c9d52476d0f", "temporal_expression": "", "extraction_confidence": 0.9}, "investment": {"value": "The project narrative estimates USD 106.9 million (SAR 401 million); the Key facts section lists project cost as US$107 million.", "rights": "facts_only", "source": {"url": "https://www.acwapower.com/en/what-we-do/projects/laylaa-solar-pv-ipp/", "name": "www.acwapower.com", "origin": "live", "checksum": "df849bc4ada31ae5a83aeac611a2178d3fade87ced5943d82bdf6d85f97e540e", "observed_at": "2026-10-17T20:08:47.822313+00:00", "revision_id": "53f42571-1a81-4b49-b9df-3f06f36a65e4", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[2]", "claim_id": "11a15752-c3ed-48df-8a70-9edda92c3bad", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acwapower.com", "evidence_id": "15277d40-e100-4de1-aa1a-e338e667b00d", "valid_until": null, "assertion_id": "77b1f707-cfcb-44cf-8b15-15b530c7a2d5", "temporal_expression": "", "extraction_confidence": 0.9}, "procurement": {"value": "ACWA Power won the tender after submitting the lowest bid of 11.2 halala per kilowatt hour. The power purchase agreement was signed between Laylaa Solar Energy Company, the project company and ACWA Power affiliate, and Saudi Power Procurement Company, the principal offtaker.", "rights": "facts_only", "source": {"url": "https://www.acwapower.com/en/what-we-do/projects/laylaa-solar-pv-ipp/", "name": "www.acwapower.com", "origin": "live", "checksum": "df849bc4ada31ae5a83aeac611a2178d3fade87ced5943d82bdf6d85f97e540e", "observed_at": "2026-10-17T20:08:47.822313+00:00", "revision_id": "53f42571-1a81-4b49-b9df-3f06f36a65e4", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "19f6c487-fc77-4890-bbda-a5aae506261c", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acwapower.com", "evidence_id": "5a6498a8-21dc-4fb9-8f69-bd220b3d0996", "valid_until": null, "assertion_id": "23e4a120-9164-4f95-b76f-8d43a47a8d15", "temporal_expression": "", "extraction_confidence": 0.9}, "source_program": {"value": "Part of the third round of Saudi Arabia\u2019s National Renewable Energy Program (NREP), led by the Ministry of Energy.", "rights": "facts_only", "source": {"url": "https://www.acwapower.com/en/what-we-do/projects/laylaa-solar-pv-ipp/", "name": "www.acwapower.com", "origin": "live", "checksum": "df849bc4ada31ae5a83aeac611a2178d3fade87ced5943d82bdf6d85f97e540e", "observed_at": "2026-10-17T20:08:47.822313+00:00", "revision_id": "53f42571-1a81-4b49-b9df-3f06f36a65e4", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "a03cd1e1-74db-47eb-aa36-d4d0195624e5", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acwapower.com", "evidence_id": "5a6498a8-21dc-4fb9-8f69-bd220b3d0996", "valid_until": null, "assertion_id": "5b3a3289-fc18-4f54-8d1b-7137c15df73d", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "f472b4a4-befb-4776-a349-9ce971df7e41", "publication": {"local_only": false, "reviewed_at": "2026-10-18T06:29:23.559792+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Laylaa Solar PV IPP is a reported 91 MW solar photovoltaic independent power project in Aflaj governorate, Riyadh province, Saudi Arabia. ACWA Power reports that it won the tender and that a power purchase agreement was signed with Saudi Power Procurement Company. The source gives two project-cost figures: USD 106.9 million (SAR 401 million) in the narrative and US$107 million in its key facts. It stated an expectation of full operation by 2024, but does not confirm whether this was achieved.", "schema_version": "1.0", "public_unknowns": ["The supplied text does not confirm whether the expectation of full operation by 2024 was met.", "The supplied text does not document current procurement status or a current buying window."], "evidence_observed_at": "2026-10-17T20:08:47.822313+00:00", "knowledge_reviewed_at": "2026-10-18T06:27:53.176210+00:00", "decisive_evidence_observed_at": "2026-10-17T20:08:47.822313+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Laylaa Solar PV IPP", "original_project_title": "Laylaa Solar PV IPP", "canonical_url": "https://capexcue.com/projects/laylaa-solar-pv-ipp-5c17cc6b-7e6/", "release": {"id": "d122cd55-21c5-48d0-85c0-07de37aa5eec", "number": 1, "published_at": "2026-10-18T06:29:35.532255+00:00"}, "release_reference": "release 1 (d122cd55-21c5-48d0-85c0-07de37aa5eec)", "current_dossier_url": "https://capexcue.com/projects/laylaa-solar-pv-ipp-5c17cc6b-7e6/", "citation": "CapexCue \u2014 Laylaa Solar PV IPP \u2014 dossier released 2026-10-18T06:29:35.532255+00:00, release 1 (d122cd55-21c5-48d0-85c0-07de37aa5eec) \u2014 https://capexcue.com/projects/laylaa-solar-pv-ipp-5c17cc6b-7e6/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "independently_reviewed_metadata", "value": "energy", "support": {"end": 53, "start": 0, "sources": [{"url": "https://www.acwapower.com/en/what-we-do/projects/laylaa-solar-pv-ipp/", "name": "www.acwapower.com", "origin": "live", "checksum": "df849bc4ada31ae5a83aeac611a2178d3fade87ced5943d82bdf6d85f97e540e", "observed_at": "2026-10-17T20:08:47.822313+00:00", "revision_id": "53f42571-1a81-4b49-b9df-3f06f36a65e4", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "A 91 MW solar photovoltaic independent power project.", "statement": "A 91 MW solar photovoltaic independent power project.", "qualifications": {"attribution": "www.acwapower.com"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "independently_reviewed_metadata", "value": "energy", "support": {"end": 53, "start": 0, "sources": [{"url": "https://www.acwapower.com/en/what-we-do/projects/laylaa-solar-pv-ipp/", "name": "www.acwapower.com", "origin": "live", "checksum": "df849bc4ada31ae5a83aeac611a2178d3fade87ced5943d82bdf6d85f97e540e", "observed_at": "2026-10-17T20:08:47.822313+00:00", "revision_id": "53f42571-1a81-4b49-b9df-3f06f36a65e4", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "A 91 MW solar photovoltaic independent power project.", "statement": "A 91 MW solar photovoltaic independent power project.", "qualifications": {"attribution": "www.acwapower.com"}}}, "input_hash": "071557db9603246187f9b4f9a3915b642c3d5931c6eb9beca9f786de1809970c", "release_id": "d122cd55-21c5-48d0-85c0-07de37aa5eec", "type_codes": ["solar_pv"], "field_states": {"type": {"state": "accepted", "reason": "The supplied scope identifies solar photovoltaic generation as the project asset. No additional physical project components are stated."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "The supplied location identifies the project as being in Aflaj governorate, Riyadh province, Saudi Arabia."}, "category": {"state": "accepted", "reason": "The project is described as a 91 MW solar photovoltaic independent power project; its NREP context is consistent with an energy asset."}}, "region_codes": ["middle_east_north_africa"], "release_hash": "49402958ef86154c777c59dfeca2d7d59170945d33d446e72004e0abcd9ff20c", "assessment_id": "4f9f8caa-88b0-482a-b50e-e55f651c53c5", "country_codes": ["SA"], "assessment_hash": "d64e6e8e581478afa986018eee9ac8ad4e887f87974dfb039db50cc928964b76", "country_label": "Saudi Arabia", "region_label": "Middle East North Africa", "type_labels": ["Solar PV"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}