{"name": "Whitestone Solar Farm", "slug": "rr22-whitestone", "as_of": "2026-10-01T03:31:18.937533+00:00", "depth": "basic", "facts": {"name": {"value": "Whitestone Solar Farm", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110020", "name": "Planning Inspectorate", "origin": "live", "checksum": "004863c949ae7630d97624d10c7313f8cceb86303ac50dcfe1c043a34cc644d1", "observed_at": "2026-10-01T02:16:36.633281+00:00", "revision_id": "dfaf1703-9bae-4444-88f1-2529cee1639f", "published_at": null}, "locator": "native-name-name", "claim_id": "0ca95b4c-3526-4d3d-be9a-4c3df41f2c8e", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "5e492cc9-29d5-4e17-a9e8-2a63857b9916", "valid_until": null, "assertion_id": "fca96e89-d94a-469c-b44b-56535b643f95", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "A Solar Farm generating station with an estimated capacity of up to 750MW and connecting to the National Grid Brinsworth Substation. The development comprises of solar photovoltaic (PV) modules, an associated Battery Energy Storage System, onsite cabling, a collector substation and satellite substations, and other associated and ancillary development.", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110020", "name": "Planning Inspectorate", "origin": "live", "checksum": "004863c949ae7630d97624d10c7313f8cceb86303ac50dcfe1c043a34cc644d1", "observed_at": "2026-10-01T02:16:36.633281+00:00", "revision_id": "dfaf1703-9bae-4444-88f1-2529cee1639f", "published_at": null}, "locator": "native-scope-scope", "claim_id": "23e6a4b5-4311-4638-89b9-84c58adfaa75", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "3e6a02e3-cdde-4d37-9158-64935e4ba566", "valid_until": null, "assertion_id": "e735f54d-0973-4f0b-82a2-71d3a63cdeb4", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110020", "name": "Planning Inspectorate", "origin": "live", "checksum": "004863c949ae7630d97624d10c7313f8cceb86303ac50dcfe1c043a34cc644d1", "observed_at": "2026-10-01T02:16:36.633281+00:00", "revision_id": "dfaf1703-9bae-4444-88f1-2529cee1639f", "published_at": null}, "locator": "native-location-location", "claim_id": "64f66d73-1dfd-4fb1-bc49-d094c1de58b4", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "f7de9f66-2d20-4d7f-b145-b04f8e84ca1b", "valid_until": null, "assertion_id": "71bc6a5d-be2d-4837-b990-58ef0ac69c6b", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "f9f9dffb-2d87-4e09-8fe2-972e8d317af3", "publication": {"local_only": false, "reviewed_at": "2026-10-16T09:04:01.957882+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Whitestone Solar Farm is described as a planned generating station with estimated capacity of up to 750MW, connecting to the National Grid Brinsworth Substation. Its described scope includes PV modules, battery energy storage, onsite cabling, collector and satellite substations, and ancillary development; the source does not establish that these works have been completed. At the 2026-10-01 source observation, the page reported the project at pre-examination and stated that registration comments had been published; this is not confirmation of later or current progress.", "schema_version": "1.0", "public_unknowns": ["The review covered the supplied project-page paragraphs, not the whole source page. Email-containing and link-only paragraphs, linked documents, and graphical content were outside the supplied review.", "Later project progress is unverified; the source-observed pre-examination status is not established as current.", "The supplied evidence does not establish procurement, a supplier package, budget, EPC appointment, or an open buying opportunity."], "evidence_observed_at": "2026-10-01T02:16:36.633281+00:00", "knowledge_reviewed_at": "2026-10-16T09:04:01.957882+00:00", "decisive_evidence_observed_at": "2026-10-01T02:16:36.633281+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Whitestone Solar Farm", "original_project_title": "Whitestone Solar Farm", "canonical_url": "https://capexcue.com/projects/rr22-whitestone/", "release": {"id": "75e438cd-874d-407e-bcc2-7366e39b3511", "number": 1, "published_at": "2026-10-16T09:04:02.298146+00:00"}, "release_reference": "release 1 (75e438cd-874d-407e-bcc2-7366e39b3511)", "current_dossier_url": "https://capexcue.com/projects/rr22-whitestone/", "citation": "CapexCue \u2014 Whitestone Solar Farm \u2014 dossier released 2026-10-16T09:04:02.298146+00:00, release 1 (75e438cd-874d-407e-bcc2-7366e39b3511) \u2014 https://capexcue.com/projects/rr22-whitestone/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 353, "start": 0, "sources": [{"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110020", "name": "Planning Inspectorate", "origin": "live", "checksum": "004863c949ae7630d97624d10c7313f8cceb86303ac50dcfe1c043a34cc644d1", "observed_at": "2026-10-01T02:16:36.633281+00:00", "revision_id": "dfaf1703-9bae-4444-88f1-2529cee1639f", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "A Solar Farm generating station with an estimated capacity of up to 750MW and connecting to the National Grid Brinsworth Substation. The development comprises of solar photovoltaic (PV) modules, an associated Battery Energy Storage System, onsite cabling, a collector substation and satellite substations, and other associated and ancillary development.", "statement": "A Solar Farm generating station with an estimated capacity of up to 750MW and connecting to the National Grid Brinsworth Substation. The development comprises of solar photovoltaic (PV) modules, an associated Battery Energy Storage System, onsite cabling, a collector substation and satellite substations, and other associated and ancillary development.", "qualifications": {"attribution": "Planning Inspectorate"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 353, "start": 0, "sources": [{"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110020", "name": "Planning Inspectorate", "origin": "live", "checksum": "004863c949ae7630d97624d10c7313f8cceb86303ac50dcfe1c043a34cc644d1", "observed_at": "2026-10-01T02:16:36.633281+00:00", "revision_id": "dfaf1703-9bae-4444-88f1-2529cee1639f", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "A Solar Farm generating station with an estimated capacity of up to 750MW and connecting to the National Grid Brinsworth Substation. The development comprises of solar photovoltaic (PV) modules, an associated Battery Energy Storage System, onsite cabling, a collector substation and satellite substations, and other associated and ancillary development.", "statement": "A Solar Farm generating station with an estimated capacity of up to 750MW and connecting to the National Grid Brinsworth Substation. The development comprises of solar photovoltaic (PV) modules, an associated Battery Energy Storage System, onsite cabling, a collector substation and satellite substations, and other associated and ancillary development.", "qualifications": {"attribution": "Planning Inspectorate"}}}, "input_hash": "6e288d5ec9999b5167450ccbfc6afb8afd15fbf39cec74fe23b766f1428ab286", "release_id": "75e438cd-874d-407e-bcc2-7366e39b3511", "type_codes": ["battery_storage", "electricity_transmission", "solar_pv"], "field_states": {"type": {"state": "accepted", "reason": "Doncaster and Rotherham identify the United Kingdom; PV/BESS and collector/satellite substations are planned components."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Doncaster and Rotherham identify the United Kingdom; PV/BESS and collector/satellite substations are planned components."}, "category": {"state": "accepted", "reason": "Doncaster and Rotherham identify the United Kingdom; PV/BESS and collector/satellite substations are planned components."}}, "region_codes": ["europe"], "release_hash": "f422e2d26437b5208eeee144e2726b9d60938cd63133be545a8a3ac204f56e15", "assessment_id": "37c89d9c-4582-4a6a-984d-5c01a126e3a6", "country_codes": ["GB"], "assessment_hash": "ebd16666e59fd3c066199338a3e4c9dae712897075741724d6738eaa6f0454a0", "country_label": "United Kingdom", "region_label": "Europe", "type_labels": ["Battery Storage", "Electricity Transmission", "Solar PV"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}