# Whitestone Solar Farm

Publisher: CapexCue
Canonical dossier: <https://capexcue.com/projects/rr22-whitestone/>
Dossier reference: release 1 (75e438cd-874d-407e-bcc2-7366e39b3511)

Released project intelligence

Oldest supporting observation: 2026-10-01T02:16:36.633281+00:00
Dossier released: 2026-10-16T09:04:02.298146+00:00
Source report dates and capture dates are listed per fact below; neither establishes an event date.

## Project summary

Whitestone Solar Farm is described as a planned generating station with estimated capacity of up to 750MW, connecting to the National Grid Brinsworth Substation. Its described scope includes PV modules, battery energy storage, onsite cabling, collector and satellite substations, and ancillary development; the source does not establish that these works have been completed. At the 2026-10-01 source observation, the page reported the project at pre-examination and stated that registration comments had been published; this is not confirmation of later or current progress.

## Evidence limits and unknowns

- The review covered the supplied project-page paragraphs, not the whole source page. Email-containing and link-only paragraphs, linked documents, and graphical content were outside the supplied review.
- Later project progress is unverified; the source-observed pre-examination status is not established as current.
- The supplied evidence does not establish procurement, a supplier package, budget, EPC appointment, or an open buying opportunity.

Current purchasing availability: unknown.
Source-dated plans do not establish current progress or available supplier packages.

## Project metadata

Country: United Kingdom
Region: Europe
Physical assets: Battery Storage, Electricity Transmission, Solar PV
Derived from the exact released evidence; unresolved fields remain unclassified.

## Project category

Energy
Derived from the reviewed scope statement; delivery stage remains unclassified.
A Solar Farm generating station with an estimated capacity of up to 750MW and connecting to the National Grid Brinsworth Substation. The development comprises of solar photovoltaic (PV) modules, an associated Battery Energy Storage System, onsite cabling, a collector substation and satellite substations, and other associated and ancillary development.
Source: Planning Inspectorate — https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110020 | published unknown | observed 2026-10-01T02:16:36.633281+00:00

Project overview
Oldest decisive evidence: 2026-10-01T02:16:36.633281+00:00
Newest evidence: 2026-10-01T02:16:36.633281+00:00
Knowledge reviewed: 2026-10-16T09:04:01.957882+00:00
Publication reviewed: 2026-10-16T09:04:01.957882+00:00

## Name
Whitestone Solar Farm
Status: reported
Attribution: Planning Inspectorate
Source: Planning Inspectorate — https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110020 | published unknown | observed 2026-10-01T02:16:36.633281+00:00

## Scope
A Solar Farm generating station with an estimated capacity of up to 750MW and connecting to the National Grid Brinsworth Substation. The development comprises of solar photovoltaic (PV) modules, an associated Battery Energy Storage System, onsite cabling, a collector substation and satellite substations, and other associated and ancillary development.
Status: planned
Attribution: Planning Inspectorate
Source: Planning Inspectorate — https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110020 | published unknown | observed 2026-10-01T02:16:36.633281+00:00

## Location
Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
Status: reported
Attribution: Planning Inspectorate
Source: Planning Inspectorate — https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110020 | published unknown | observed 2026-10-01T02:16:36.633281+00:00


## Cite this dossier

CapexCue — Whitestone Solar Farm — dossier released 2026-10-16T09:04:02.298146+00:00, release 1 (75e438cd-874d-407e-bcc2-7366e39b3511) — https://capexcue.com/projects/rr22-whitestone/.

For current information and later dossier updates, visit <https://capexcue.com/projects/rr22-whitestone/>.
This file records the release identified above; the current dossier may change.