Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Free project evidence
Explore projects
Search by scope, place or organization, then check the dated evidence before deciding what's worth pursuing.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
“Ampliación Proyecto de Explotación La Cuesta” (La Cuesta Exploitation Project Expansion).
In-depth researchSource-reported scope: The project works table lists two permanent extraction-point works: Mina La Cuesta (132 m²) and Mina Improvisada (144 m²), each designated for construction and operation.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Angostura Unit
In-depth researchSource-reported scope: The described project comprises Angostura Dam and Reservoir and associated irrigation facilities. The dam is a composite concrete-gravity and earth-embankment structure with a 2,030-foot crest (970 feet concrete and 1,060 feet earth), a structural height of 193 feet, and a hydraulic height of 136 feet above the riverbed. Its spillway has five 50-by-30-foot radial gates and a stated discharge capacity of 247,000 cubic feet per second. The river outlet is a 4.5-foot-diameter steel conduit with a 4-foot-square slide gate and stated capacity of 590 cubic feet per second. The irrigation outlet has a 6-foot-diameter steel conduit, valve house, stilling basin and canal headworks; releases to the canal are controlled by two 3.5-foot-square slide gates. The Angostura Canal has a 29.7-mile alignment and 290-cubic-foot-per-second design capacity, and crosses the Cheyenne River through a 9,800-foot inverted siphon. The described unit lands extend about 24 miles downstream from the dam and are served by 39 miles of laterals and 34 miles of open and closed drains. Dam construction began August 23, 1946, and was completed December 7, 1949.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Animas-La Plata Project
In-depth researchSource-reported scope: The integrated project includes Ridges Basin Dam and Lake Nighthorse, the Durango Pumping Plant and Ridges Basin Inlet Conduit, the Navajo Nation Municipal Pipeline, and Basin Creek drop structures/improvements. The source describes the pipeline as the project's fourth major component and records related construction and operations as project features; it does not establish that every connection or activity was complete.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Follow up to five projects free.
A free account keeps your follows and recorded changes alongside later company assessments.
Create free account