Project scope

Planned construction and operation of a 500 MW / 1,000 MWh grid-forming battery with advanced inverters, connecting directly to TransGrid’s existing 330 kV switchyard at Liddell.

Reported status and procurement

Reported development
Not established
Procurement availability
Unknown / not established

Reported regulatory context

NSW planning approval has been received for a battery energy storage system of up to 500 MW / 2,000 MWh at the proposed location; this approval capacity differs from the project’s stated 500 MW / 1,000 MWh scope.

A source report alone does not establish current progress or an open buying window.

Project summary

ARENA’s listing identifies the project as AGL Energy’s Liddell large-scale battery deployment. It describes planned construction and operation of a 500 MW / 1,000 MWh grid-forming battery with advanced inverters at the retired Liddell Power Station in Muswellbrook, with a planned direct connection to TransGrid’s existing 330 kV switchyard. The listing separately reports NSW planning approval for a system of up to 500 MW / 2,000 MWh. AGL Energy Limited is listed as Lead Organisation, and the stated project period is 1 March 2024 to 31 October 2028. ARENA funding is reported as $35 million, with total project cost reported as $694.68 million. The listing gives its last-updated date as 06 May 2025.

Evidence limits and unknowns

The listing, last updated 06 May 2025, does not specify battery or inverter models or supplier identities; it states the project rating, inverter technology and planned connection.

The listing mentions procuring local content but provides no tender details, procurement schedule or current procurement status.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
Australia
Based on reviewed release evidence
Region
Oceania
Category
Energy
Derived from released evidence
Physical assets
Battery Storage

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Date

Source reported

The listing gives a start date of 1 March 2024 and an end date of 31 October 2028.

Attributed to arena.gov.au.

Source: arena.gov.au · publication date not recorded · observed 2026-10-15

Sources and evidence · arena.gov.au
Source published: Not recordedObserved: 2026-10-15

arena.gov.au
Attributed to arena.gov.au

Technical record · The listing gives a start date of 1 …
Evidence location
/html/body/div/main/div[2]/div[1]/div/div/ul/li[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
bf3b47b2-9fe4-4fa4-a5f7-a3a3e2aa172e
Evidence reference
e0de5326-75e6-4135-97a7-5f496aad8a2f
Source revision
8535eee3-610d-4791-af60-09848cb3d6be
Content fingerprint
5ed170dca084344271d51013c0b13117f40c5fec5a48a4ffd73dc4018c4c66df
Source address
https://arena.gov.au/projects/agl-liddell-large-scale-battery-with-advanced-inverters-deployment-project/

Project name

Source reported

AGL Energy – Liddell Large Scale Battery with advanced inverters; Deployment Project

Attributed to arena.gov.au.

Source: arena.gov.au · publication date not recorded · observed 2026-10-15

Sources and evidence · arena.gov.au
Source published: Not recordedObserved: 2026-10-15

arena.gov.au
Attributed to arena.gov.au

Technical record · AGL Energy – Liddell Large Scale Battery with …
Evidence location
/html/body/div/main/div[1]/div/div/div/h1
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
740f19f8-9043-4a91-b985-f3e93e99ff9d
Evidence reference
f51f3f2a-9488-4f7f-8f6f-eb78dcb640c1
Source revision
8535eee3-610d-4791-af60-09848cb3d6be
Content fingerprint
5ed170dca084344271d51013c0b13117f40c5fec5a48a4ffd73dc4018c4c66df
Source address
https://arena.gov.au/projects/agl-liddell-large-scale-battery-with-advanced-inverters-deployment-project/

Scope

Planned

Planned construction and operation of a 500 MW / 1,000 MWh grid-forming battery with advanced inverters, connecting directly to TransGrid’s existing 330 kV switchyard at Liddell.

Attributed to arena.gov.au.

Source: arena.gov.au · publication date not recorded · observed 2026-10-15

Sources and evidence · arena.gov.au
Source published: Not recordedObserved: 2026-10-15

arena.gov.au
Attributed to arena.gov.au

Technical record · Planned construction and operation of a 500 MW …
Evidence location
/html/body/div/main/div[2]/div[2]/div[1]/div/p
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
a10a459b-149a-4ffb-8015-03a00a77b41d
Evidence reference
09f379a3-5605-47b0-8982-2211e537d06a
Source revision
8535eee3-610d-4791-af60-09848cb3d6be
Content fingerprint
5ed170dca084344271d51013c0b13117f40c5fec5a48a4ffd73dc4018c4c66df
Source address
https://arena.gov.au/projects/agl-liddell-large-scale-battery-with-advanced-inverters-deployment-project/

Location

Source reported

Retired Liddell Power Station, Muswellbrook, New South Wales; the station ceased operations in April 2023.

Attributed to arena.gov.au.

Source: arena.gov.au · publication date not recorded · observed 2026-10-15

Sources and evidence · arena.gov.au
Source published: Not recordedObserved: 2026-10-15

arena.gov.au
Attributed to arena.gov.au

Technical record · Retired Liddell Power Station, Muswellbrook, New South Wales; …
Evidence location
/html/body/div/main/div[2]/div[2]/div[1]/div/p
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
21dd3ee0-1c66-4c8d-b2d8-dcb77b61d109
Evidence reference
09f379a3-5605-47b0-8982-2211e537d06a
Source revision
8535eee3-610d-4791-af60-09848cb3d6be
Content fingerprint
5ed170dca084344271d51013c0b13117f40c5fec5a48a4ffd73dc4018c4c66df
Source address
https://arena.gov.au/projects/agl-liddell-large-scale-battery-with-advanced-inverters-deployment-project/

Developer

Source reported

AGL Energy Limited, listed as the Lead Organisation.

Attributed to arena.gov.au.

Source: arena.gov.au · publication date not recorded · observed 2026-10-15

Sources and evidence · arena.gov.au
Source published: Not recordedObserved: 2026-10-15

arena.gov.au
Attributed to arena.gov.au

Technical record · AGL Energy Limited, listed as the Lead Organisation.
Evidence location
/html/body/div/main/div[2]/div[1]/div/div/ul/li[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
9b87bca5-73be-46c6-b7de-55c3ee720300
Evidence reference
b2db83d3-55bf-45d4-ad07-38cfedc439dc
Source revision
8535eee3-610d-4791-af60-09848cb3d6be
Content fingerprint
5ed170dca084344271d51013c0b13117f40c5fec5a48a4ffd73dc4018c4c66df
Source address
https://arena.gov.au/projects/agl-liddell-large-scale-battery-with-advanced-inverters-deployment-project/

Investment estimate

Source reported

Total project cost: $694.68 million.

Attributed to arena.gov.au.

Source: arena.gov.au · publication date not recorded · observed 2026-10-15

Sources and evidence · arena.gov.au
Source published: Not recordedObserved: 2026-10-15

arena.gov.au
Attributed to arena.gov.au

Technical record · Total project cost: $694.68 million.
Evidence location
/html/body/div/main/div[1]/div/div/div/ul/li[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
44d5bfe7-2616-449a-96d1-0a56f9f78c4b
Evidence reference
c1442a5d-dcbe-4f73-97ae-d2759caaaf1c
Source revision
8535eee3-610d-4791-af60-09848cb3d6be
Content fingerprint
5ed170dca084344271d51013c0b13117f40c5fec5a48a4ffd73dc4018c4c66df
Source address
https://arena.gov.au/projects/agl-liddell-large-scale-battery-with-advanced-inverters-deployment-project/

Regulatory evidence

Reported as actual

NSW planning approval has been received for a battery energy storage system of up to 500 MW / 2,000 MWh at the proposed location; this approval capacity differs from the project’s stated 500 MW / 1,000 MWh scope.

Attributed to arena.gov.au.

Source: arena.gov.au · publication date not recorded · observed 2026-10-15

Sources and evidence · arena.gov.au
Source published: Not recordedObserved: 2026-10-15

arena.gov.au
Attributed to arena.gov.au

Technical record · NSW planning approval has been received for a …
Evidence location
/html/body/div/main/div[2]/div[2]/div[1]/div/p
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
06a6f7a4-f446-46d3-86ce-00cd82e5e8cc
Evidence reference
09f379a3-5605-47b0-8982-2211e537d06a
Source revision
8535eee3-610d-4791-af60-09848cb3d6be
Content fingerprint
5ed170dca084344271d51013c0b13117f40c5fec5a48a4ffd73dc4018c4c66df
Source address
https://arena.gov.au/projects/agl-liddell-large-scale-battery-with-advanced-inverters-deployment-project/

Source programme

Source reported

Advancing Renewables Program.

Attributed to arena.gov.au.

Source: arena.gov.au · publication date not recorded · observed 2026-10-15

Sources and evidence · arena.gov.au
Source published: Not recordedObserved: 2026-10-15

arena.gov.au
Attributed to arena.gov.au

Technical record · Advancing Renewables Program.
Evidence location
/html/body/div/main/div[2]/div[1]/div/div/ul/li[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
3547ce1b-0e21-4e3a-aa00-c486971cf3da
Evidence reference
b2db83d3-55bf-45d4-ad07-38cfedc439dc
Source revision
8535eee3-610d-4791-af60-09848cb3d6be
Content fingerprint
5ed170dca084344271d51013c0b13117f40c5fec5a48a4ffd73dc4018c4c66df
Source address
https://arena.gov.au/projects/agl-liddell-large-scale-battery-with-advanced-inverters-deployment-project/

Financing amount

Reported as actual

$35 million funded by ARENA.

Attributed to arena.gov.au.

Source: arena.gov.au · publication date not recorded · observed 2026-10-15

Sources and evidence · arena.gov.au
Source published: Not recordedObserved: 2026-10-15

arena.gov.au
Attributed to arena.gov.au

Technical record · $35 million funded by ARENA.
Evidence location
/html/body/div/main/div[1]/div/div/div/ul/li[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
a560e196-18cf-438a-9dd1-d6e520f7614f
Evidence reference
b1c1aa41-75eb-438a-9095-7097cf1fa410
Source revision
8535eee3-610d-4791-af60-09848cb3d6be
Content fingerprint
5ed170dca084344271d51013c0b13117f40c5fec5a48a4ffd73dc4018c4c66df
Source address
https://arena.gov.au/projects/agl-liddell-large-scale-battery-with-advanced-inverters-deployment-project/
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.