Almena Unit

United States · Water and environment

In-depth research Release 1

Project scope

A multipurpose system consisting of Norton Dam and Keith Sebelius Reservoir (formerly Norton Reservoir), Almena Diversion Dam, the Almena Main and South Canals, laterals, and drains. The general description says the unit serves 5,763 acres. The detailed canal account says the Main Canal serves 3,830 acres and the South Canal 1,520 acres; it also says the lateral system serves 2,450 acres and the remaining 2,900 acres are served by canal turnouts. The detailed service figures total 5,350 acres, not 5,763; the source does not explain the difference. Reported engineering details include a 101-foot-high, 6,450-foot-long Norton Dam; spillway capacity of 94,600 cubic feet per second; outlet capacity of 330 cubic feet per second; and a reservoir capacity of 134,738 acre-feet, allocated among dead storage (2,718), inactive capacity (2,566), irrigation and municipal supply (30,651), and flood control (98,803). The diversion dam is described as an approximately 150-foot-long, 19-foot-high concrete weir with earth dikes. The Main Canal is 20 miles long with 100-cubic-feet-per-second capacity; the South Canal is 8.3 miles long with 36-cubic-feet-per-second capacity. The source also reports 17 laterals totaling 14.3 miles and 6.4 miles of collector drains. Construction milestones reported for these facilities: Norton Dam and Reservoir began in December 1961 and were completed in December 1964; Almena Diversion Dam began in August 1965 and was completed in February 1967; canals, laterals, and drains began in October 1965 and were completed in May 1967. Initial water storage began in October 1964.

Reported status and procurement

Reported development

The unit is described as storing and supplying water for irrigation and for the municipal needs of Norton, providing downstream flood protection through controlled storage, and supporting recreation. The page states that Norton receives a full municipal water supply from Norton Reservoir and that floodwater is stored, to the extent practicable, for later irrigation and municipal releases.

Procurement availability
Unknown / not established

A source report alone does not establish current progress or an open buying window.

Project summary

The Almena Unit is a water-resource system in the Prairie Dog Creek valley of north-central Kansas. Its reported facilities include Norton Dam and Keith Sebelius Reservoir, Almena Diversion Dam, and associated canals, laterals, and drains. The source describes irrigation, municipal water supply for Norton, downstream flood protection, and recreation as purposes or benefits.

Evidence note: The supplied source evidence was observed on 2 October 2026; this is the observation date, not the date of this review. This summary is limited to the supplied HTML text. Linked documents and images or captions were not reviewed.

Evidence limits and unknowns

The general description gives 5,763 acres, while each detailed service breakdown totals 5,350 acres. The source does not explain the difference.

The construction dates are historical, with the reported works completed by May 1967. The supplied text does not establish current construction or rehabilitation, current condition, procurement, or a purchasing opportunity.

The source provides no publication date. Its operating and administrative statements are undated, and it does not explain the timing or scope of its different wildlife-agency attributions.

The supplied text does not identify a project cost, financing stage, borrower, sponsor, or contractor. Evidence observed on 2 October 2026 does not establish present project status.

Project milestones

Attributed project events and plans. Source report dates and dossier release dates are separate.

  1. Norton Dam and Reservoir · Construction began

    Reported event · date precision: month

    Not independently corroborated.

    This source report does not establish current progress.

    Technical record for this milestone

    Recorded event date: December 1961

    Released statement reference: released-statement:scope:1319:1402:construction_began

    Derived from the reviewed scope statement; this is not a verbatim source quotation.

    Norton Dam and Reservoir began in December 1961 and were completed in December 1964

    attribution
    US Bureau of Reclamation own-government project narrative

    Source published not recorded · observed 2026-10-02

    Source revision: 81f0f3bb-4431-4472-842e-69e9071a609f

  2. Initial water storage · Storage began

    Reported event · date precision: month

    Not independently corroborated.

    This source report does not establish current progress.

    Technical record for this milestone

    Recorded event date: October 1964

    Released statement reference: released-statement:scope:1565:1609:water_storage_began

    Derived from the reviewed scope statement; this is not a verbatim source quotation.

    Initial water storage began in October 1964.

    attribution
    US Bureau of Reclamation own-government project narrative

    Source published not recorded · observed 2026-10-02

    Source revision: 81f0f3bb-4431-4472-842e-69e9071a609f

  3. Norton Dam and Reservoir · Construction completed

    Reported event · date precision: month

    Not independently corroborated.

    This source report does not establish current progress.

    Technical record for this milestone

    Recorded event date: December 1964

    Released statement reference: released-statement:scope:1319:1402:construction_completed

    Derived from the reviewed scope statement; this is not a verbatim source quotation.

    Norton Dam and Reservoir began in December 1961 and were completed in December 1964

    attribution
    US Bureau of Reclamation own-government project narrative

    Source published not recorded · observed 2026-10-02

    Source revision: 81f0f3bb-4431-4472-842e-69e9071a609f

  4. Almena Diversion Dam · Construction began

    Reported event · date precision: month

    Not independently corroborated.

    This source report does not establish current progress.

    Technical record for this milestone

    Recorded event date: August 1965

    Released statement reference: released-statement:scope:1404:1480:construction_began

    Derived from the reviewed scope statement; this is not a verbatim source quotation.

    Almena Diversion Dam began in August 1965 and was completed in February 1967

    attribution
    US Bureau of Reclamation own-government project narrative

    Source published not recorded · observed 2026-10-02

    Source revision: 81f0f3bb-4431-4472-842e-69e9071a609f

  5. canals, laterals, and drains · Construction began

    Reported event · date precision: month

    Not independently corroborated.

    This source report does not establish current progress.

    Technical record for this milestone

    Recorded event date: October 1965

    Released statement reference: released-statement:scope:1482:1563:construction_began

    Derived from the reviewed scope statement; this is not a verbatim source quotation.

    canals, laterals, and drains began in October 1965 and were completed in May 1967

    attribution
    US Bureau of Reclamation own-government project narrative

    Source published not recorded · observed 2026-10-02

    Source revision: 81f0f3bb-4431-4472-842e-69e9071a609f

  6. Almena Diversion Dam · Construction completed

    Reported event · date precision: month

    Not independently corroborated.

    This source report does not establish current progress.

    Technical record for this milestone

    Recorded event date: February 1967

    Released statement reference: released-statement:scope:1404:1480:construction_completed

    Derived from the reviewed scope statement; this is not a verbatim source quotation.

    Almena Diversion Dam began in August 1965 and was completed in February 1967

    attribution
    US Bureau of Reclamation own-government project narrative

    Source published not recorded · observed 2026-10-02

    Source revision: 81f0f3bb-4431-4472-842e-69e9071a609f

  7. canals, laterals, and drains · Construction completed

    Reported event · date precision: month

    Not independently corroborated.

    This source report does not establish current progress.

    Technical record for this milestone

    Recorded event date: May 1967

    Released statement reference: released-statement:scope:1482:1563:construction_completed

    Derived from the reviewed scope statement; this is not a verbatim source quotation.

    canals, laterals, and drains began in October 1965 and were completed in May 1967

    attribution
    US Bureau of Reclamation own-government project narrative

    Source published not recorded · observed 2026-10-02

    Source revision: 81f0f3bb-4431-4472-842e-69e9071a609f

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
United States
Based on reviewed release evidence
Region
North America
Category
Water and environment
Derived from released evidence
Physical assets
Not classified

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Project name

Source reported

Almena Unit

Attributed to US Bureau of Reclamation own-government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-02

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-02

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation own-government project narrative

Technical record · Almena Unit
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/div[1]/h1
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
4b8310b2-6ea1-4f9b-be48-fc99bafb266f
Evidence reference
c88e5a2a-729e-4c29-a7c3-4d647f61898d
Source revision
81f0f3bb-4431-4472-842e-69e9071a609f
Content fingerprint
0d11415ddea295c3d507f2888fd8e964552ad8d8f2d438f4c7ba3e585a732225
Source address
https://www.usbr.gov/projects/index.php?id=339

Scope

Source reported

A multipurpose system consisting of Norton Dam and Keith Sebelius Reservoir (formerly Norton Reservoir), Almena Diversion Dam, the Almena Main and South Canals, laterals, and drains. The general description says the unit serves 5,763 acres. The detailed canal account says the Main Canal serves 3,830 acres and the South Canal 1,520 acres; it also says the lateral system serves 2,450 acres and the remaining 2,900 acres are served by canal turnouts. The detailed service figures total 5,350 acres, not 5,763; the source does not explain the difference. Reported engineering details include a 101-foot-high, 6,450-foot-long Norton Dam; spillway capacity of 94,600 cubic feet per second; outlet capacity of 330 cubic feet per second; and a reservoir capacity of 134,738 acre-feet, allocated among dead storage (2,718), inactive capacity (2,566), irrigation and municipal supply (30,651), and flood control (98,803). The diversion dam is described as an approximately 150-foot-long, 19-foot-high concrete weir with earth dikes. The Main Canal is 20 miles long with 100-cubic-feet-per-second capacity; the South Canal is 8.3 miles long with 36-cubic-feet-per-second capacity. The source also reports 17 laterals totaling 14.3 miles and 6.4 miles of collector drains. Construction milestones reported for these facilities: Norton Dam and Reservoir began in December 1961 and were completed in December 1964; Almena Diversion Dam began in August 1965 and was completed in February 1967; canals, laterals, and drains began in October 1965 and were completed in May 1967. Initial water storage began in October 1964.

Attributed to US Bureau of Reclamation own-government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-02

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-02

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation own-government project narrative

Technical record · A multipurpose system consisting of Norton Dam and …
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/div[4]/p[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
586b8293-d1e2-4977-8730-20a3737fcaa0
Evidence reference
223c6c6d-8398-45de-830a-4e5c88268660
Source revision
81f0f3bb-4431-4472-842e-69e9071a609f
Content fingerprint
0d11415ddea295c3d507f2888fd8e964552ad8d8f2d438f4c7ba3e585a732225
Source address
https://www.usbr.gov/projects/index.php?id=339

Country

Source reported

United States (Kansas).

Attributed to US Bureau of Reclamation own-government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-02

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-02

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation own-government project narrative

Technical record · United States (Kansas).
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/div[1]/div[2]/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
af1baa7b-b2c7-4149-b5d5-ca1134f7439b
Evidence reference
fbb74e39-44fe-44b3-8c90-a4febac99fe4
Source revision
81f0f3bb-4431-4472-842e-69e9071a609f
Content fingerprint
0d11415ddea295c3d507f2888fd8e964552ad8d8f2d438f4c7ba3e585a732225
Source address
https://www.usbr.gov/projects/index.php?id=339

Current activity

Source reported

The unit is described as storing and supplying water for irrigation and for the municipal needs of Norton, providing downstream flood protection through controlled storage, and supporting recreation. The page states that Norton receives a full municipal water supply from Norton Reservoir and that floodwater is stored, to the extent practicable, for later irrigation and municipal releases.

Attributed to US Bureau of Reclamation own-government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-02

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-02

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation own-government project narrative

Technical record · The unit is described as storing and supplying …
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/div[4]/p[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
db165164-1168-426b-8dd2-730ad78f91bc
Evidence reference
604f67b4-c2a1-4d68-856d-3a4b1e9442f2
Source revision
81f0f3bb-4431-4472-842e-69e9071a609f
Content fingerprint
0d11415ddea295c3d507f2888fd8e964552ad8d8f2d438f4c7ba3e585a732225
Source address
https://www.usbr.gov/projects/index.php?id=339

Location

Source reported

Along the Prairie Dog Creek valley in north-central Kansas. Norton Dam is reported about 2.5 miles upstream from Norton, Kansas; Almena Diversion Dam is reported 8 miles northeast of Norton and about 11 miles downstream from Norton Dam. The irrigation lands are in Prairie Dog Creek Valley, extending from about 2 miles southwest of Almena to 3 miles east of Long Island.

Attributed to US Bureau of Reclamation own-government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-02

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-02

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation own-government project narrative

Technical record · Along the Prairie Dog Creek valley in north-central …
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/div[4]/p[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
bf866560-b459-4242-869c-091d5c95668a
Evidence reference
d92c9d20-1a32-4735-a70b-e9487eda7ea5
Source revision
81f0f3bb-4431-4472-842e-69e9071a609f
Content fingerprint
0d11415ddea295c3d507f2888fd8e964552ad8d8f2d438f4c7ba3e585a732225
Source address
https://www.usbr.gov/projects/index.php?id=339
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.