Central Valley Project (CVP).

United States · Water and environment

In-depth research Release 1

Project scope

A multipurpose, interconnected system of dams, reservoirs, powerplants, canals, conduits, tunnels, and related facilities organized into interrelated divisions and units. The source counts 20 dams and reservoirs, 11 powerplants, and 500 miles of major canals, and describes a reach of about 400 miles. Separately, it says project plans encompassed 35 counties over an area about 500 miles long and 60 to 100 miles wide; these are distinct geographic descriptions that the page does not reconcile. Auburn Dam was intended to be the CVP's largest dam but is described as incomplete and in limbo, not as a completed facility. The CVP shares conveyance and coordinated operations with the State Water Project (SWP), but the source distinguishes the CVP from the SWP and from local water-rights infrastructure.

Reported status and procurement

Reported development

The page reports annual delivery of about 7 million acre-feet for agricultural, urban, and wildlife use; about 5 million acre-feet for farms; and about 600,000 acre-feet for municipal and industrial use. It also reports annual electricity generation of 5.6 billion kilowatt-hours. The water figures are not assigned a measurement year on the page.

Procurement availability
Unknown / not established

A source report alone does not establish current progress or an open buying window.

Project summary

The Central Valley Project (CVP) is described as a multipurpose water and power system in California. The page counts 20 dams and reservoirs, 11 powerplants, and 500 miles of major canals, and describes a reach of about 400 miles. Separately, it describes plans covering 35 counties over an area about 500 miles long and 60 to 100 miles wide; it does not reconcile those geographic descriptions. Auburn Dam is described as incomplete and in limbo, not a completed facility. The CVP shares conveyance and coordinated operations with the State Water Project, but is distinguished from it and from local water-rights infrastructure. The page describes reservoir storage and regulation, diversion and pumping, conveyance, and delivery; local districts distribute water from main canals to users. Reported annual figures include about 7 million acre-feet delivered and 5.6 billion kilowatt-hours generated; no measurement year is assigned to the water figures. Fish and wildlife purposes and allocations are reported, not measured ecological outcomes.

Evidence limits and unknowns

The supplied page has no publication date; its historic milestones and undated operating descriptions do not establish present-day facility or operational status.

The source identifies a historical Shasta Dam construction contract awarded July 6, 1938, but does not establish current procurement or purchasing activity. No buying window is identified.

Related documents and facility pages are linked or named, but were not acquired or interpreted.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
United States
Based on reviewed release evidence
Region
North America
Category
Water and environment
Derived from released evidence
Physical assets
Not classified

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Project name

Source reported

Central Valley Project (CVP).

Attributed to US Bureau of Reclamation own-government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-02

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-02

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation own-government project narrative

Technical record · Central Valley Project (CVP).
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/div[1]/h1
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
4ce1f04f-cbf4-45cd-8858-fd9795fd569d
Evidence reference
fd3f3955-018b-48f3-a1eb-3918437962b4
Source revision
0ad1472d-152c-4117-b5f2-9533b45a0e23
Content fingerprint
5c0ab432f9e7cd5c88fff03df3a0814b652e6dfe9a3cfb2cbd791b5a9de1f226
Source address
https://www.usbr.gov/projects/index.php?id=506

Scope

Source reported

A multipurpose, interconnected system of dams, reservoirs, powerplants, canals, conduits, tunnels, and related facilities organized into interrelated divisions and units. The source counts 20 dams and reservoirs, 11 powerplants, and 500 miles of major canals, and describes a reach of about 400 miles. Separately, it says project plans encompassed 35 counties over an area about 500 miles long and 60 to 100 miles wide; these are distinct geographic descriptions that the page does not reconcile. Auburn Dam was intended to be the CVP's largest dam but is described as incomplete and in limbo, not as a completed facility. The CVP shares conveyance and coordinated operations with the State Water Project (SWP), but the source distinguishes the CVP from the SWP and from local water-rights infrastructure.

Attributed to US Bureau of Reclamation own-government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-02

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-02

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation own-government project narrative

Technical record · A multipurpose, interconnected system of dams, reservoirs, powerplants, …
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/div[4]/ul/li[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
9d26871b-601c-4ff3-94af-792b0bb55715
Evidence reference
c31920c9-5b93-45eb-b994-6590b1d8c89b
Source revision
0ad1472d-152c-4117-b5f2-9533b45a0e23
Content fingerprint
5c0ab432f9e7cd5c88fff03df3a0814b652e6dfe9a3cfb2cbd791b5a9de1f226
Source address
https://www.usbr.gov/projects/index.php?id=506

Project ecology

Source reported

The source describes conserving fish and wildlife, providing water for the environment, and dedicating water to fish and wildlife and their habitat, as well as to state and federal wildlife refuges and wetlands. These are stated purposes and allocations, not evidence of measured ecological outcomes.

Attributed to US Bureau of Reclamation own-government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-02

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-02

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation own-government project narrative

Technical record · The source describes conserving fish and wildlife, providing …
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/div[4]/p[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
9df07dcf-5e38-424f-ada2-31e8321ef9eb
Evidence reference
a4cb118e-0a9b-4322-b8df-76eb888fa216
Source revision
0ad1472d-152c-4117-b5f2-9533b45a0e23
Content fingerprint
5c0ab432f9e7cd5c88fff03df3a0814b652e6dfe9a3cfb2cbd791b5a9de1f226
Source address
https://www.usbr.gov/projects/index.php?id=506

Current activity

Source reported

The page describes storage and regulation of water in reservoirs, diversion and pumping, conveyance through canals and tunnels, coordinated reservoir operations, and delivery under long-term contracts. It says distribution from main canals to individual users is the responsibility of local districts. It also reports historic construction milestones: initial units began with the Contra Costa Canal in October 1937; the canal was completed in 1948 and first delivered water in 1940; Shasta Dam work began in 1938 and was essentially complete in 1945, with storage beginning in January 1944 and first power delivered in June 1944. These historic milestones and undated operating descriptions do not establish the status of present works.

Attributed to US Bureau of Reclamation own-government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-02

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-02

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation own-government project narrative

Technical record · The page describes storage and regulation of water …
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/div[7]/p[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
5142227b-37a2-43b9-8e63-986c5c542108
Evidence reference
0da894e0-77e0-4275-8fa9-9c7574345dd7
Source revision
0ad1472d-152c-4117-b5f2-9533b45a0e23
Content fingerprint
5c0ab432f9e7cd5c88fff03df3a0814b652e6dfe9a3cfb2cbd791b5a9de1f226
Source address
https://www.usbr.gov/projects/index.php?id=506

Delivery

Source reported

The page reports annual delivery of about 7 million acre-feet for agricultural, urban, and wildlife use; about 5 million acre-feet for farms; and about 600,000 acre-feet for municipal and industrial use. It also reports annual electricity generation of 5.6 billion kilowatt-hours. The water figures are not assigned a measurement year on the page.

Attributed to US Bureau of Reclamation own-government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-02

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-02

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation own-government project narrative

Technical record · The page reports annual delivery of about 7 …
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/div[4]/ul/li[4]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
448696dc-12ae-4763-9335-3e8f6980032f
Evidence reference
e59a5d1e-69cb-4a71-a256-ce6ab9aa93ce
Source revision
0ad1472d-152c-4117-b5f2-9533b45a0e23
Content fingerprint
5c0ab432f9e7cd5c88fff03df3a0814b652e6dfe9a3cfb2cbd791b5a9de1f226
Source address
https://www.usbr.gov/projects/index.php?id=506

Location

Source reported

California, in Reclamation's California-Great Basin Region. The source describes the system as extending from the Cascade Range toward the Kern River, and also gives a Cascade Mountains-to-Tehachapi Mountains description.

Attributed to US Bureau of Reclamation own-government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-02

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-02

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation own-government project narrative

Technical record · California, in Reclamation's California-Great Basin Region. The source …
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/div[1]/div[2]/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
3d88da48-68a0-42ba-b5e1-7c5e067ae502
Evidence reference
9bd91063-6aeb-42eb-9ebc-b066151a0a8c
Source revision
0ad1472d-152c-4117-b5f2-9533b45a0e23
Content fingerprint
5c0ab432f9e7cd5c88fff03df3a0814b652e6dfe9a3cfb2cbd791b5a9de1f226
Source address
https://www.usbr.gov/projects/index.php?id=506
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.