Plan: The CEC summary lists capacity as 300 MW and 1,200 MWh. The description says Corby Energy Storage, LLC proposes a 300-MW battery energy storage system with a project substation, inverters, and ancillary facilities including fencing, a sound barrier, roads, retention basins, storage containers, and SCADA. The proposed connection to PG&E’s existing Vaca-Dixon Substation is an approximately 1.1-mile, 230-kV gen-tie with overhead and underground portions. Separately, PG&E would install a new 230-kV Double Bus Bay at that existing substation and construct, own, and operate the gen-tie segment from the ownership-change pole south of I-80 to the first point of interconnection, including five of the ten structures.

Reported status and procurement

Reported development

Plan: The proposed operating arrangement is unstaffed after construction, with control from an offsite control room through SCADA and periodic inspections and maintenance as necessary.

Procurement availability
Unknown / not established

Reported regulatory context

CEC docket 24-OPT-05; project type is listed as Opt-In and status as Under Review.

A source report alone does not establish current progress or an open buying window.

Project summary

The California Energy Commission (CEC) identifies the project as the Corby Battery Energy Storage System Project. Its summary lists 300 MW and 1,200 MWh; its description proposes a battery storage system on an approximately 40.3-acre parcel southwest of Kilkenny Road and Byrnes Road in Solano County, California. The proposed grid connection is an approximately 1.1-mile, 230-kV gen-tie to PG&E’s existing Vaca-Dixon Substation, with overhead and underground portions. (CEC project summary and description.)

The CEC summary lists North Bay Interconnect, LLC and Corby Energy Storage, LLC as project owners. The description identifies Corby Energy Storage as the applicant proposing to construct, own, and operate the project; PG&E would construct, own, and operate specified gen-tie facilities, including a new 230-kV Double Bus Bay at the existing substation. The CEC lists docket 24-OPT-05 and status “Under Review.” (CEC project summary and description.)

Separately, a PG&E progress table hosted by WECC describes Corby as a battery storage generation plant with 300 MW net output to the Vaca-Dixon 230-kV Bus in Vacaville. It lists Jan-2027 in the “Date in Service” column and “ENGINEERING,” which the table defines as “Engineering and design stage.” These are utility-side interconnection entries, not confirmation of plant output or actual service. The table heading gives planned-project context and a waiver qualification through 2025, but no Corby-specific waiver decision date. (PG&E progress report, Table 2, p. 6.)

The CEC page’s Past Events section lists an Informational and Environmental Scoping Meeting dated November 6, 2025, and a CEC Staff Assessment Public Meeting dated September 1, 2026; the listings do not confirm either meeting occurred. (CEC project page, Past Events.)

Reading scope: The CEC project page was observed on November 7, 2026. For the PG&E report, only page 6 of 12 was reviewed; other pages and graphical content were not interpreted. The page-6 table is a utility-side report, not a whole-project status assessment.

Evidence limits and unknowns

The cited sources do not establish that the listed CEC meetings occurred. (CEC project page, Past Events.)

The cited sources do not establish actual energization, commissioning, certification, commercial operation, or achieved output. The PG&E date and engineering entry are planned or reported interconnection details. (CEC project summary and description; PG&E progress report, Table 2, p. 6.)

No available procurement package, open procurement, or buying window is established by the cited material. (CEC project page; PG&E progress report, p. 6.)

The PG&E table heading does not give a Corby-specific waiver decision date. (PG&E progress report, Table 2, p. 6.)

The reviewed PG&E report material does not establish whether later pages or graphical content contain additional project information. (PG&E progress report, coverage reviewed: p. 6 of 12.)

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
United States
Derived from the reviewed site location
Region
North America
Category
Energy
Derived from released evidence
Physical assets
Battery Storage

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Date

Source reported

The page lists an Informational and Environmental Scoping Meeting dated November 6, 2025, and a CEC Staff Assessment Public Meeting dated September 1, 2026, under Past Events; the listings do not confirm that the meetings occurred.

Attributed to California Energy Commission (externally supplied capture).

Source: California Energy Commission (externally supplied capture) · publication date not recorded · observed 2026-11-07

Sources and evidence · California Energy Commission (externally supplied capture)
Source published: Not recordedObserved: 2026-11-07

California Energy Commission (externally supplied capture)
Attributed to California Energy Commission (externally supplied capture)

Technical record · The page lists an Informational and Environmental Scoping …
Evidence location
/html/body/div[2]/div/div[4]/div/div/div/main/div[3]/div[2]/div/div[1]/h2
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
aa9c0059-96b4-47e2-903c-3d83891241e4
Evidence reference
3bd95827-0dd7-430d-a970-1bd361e550eb
Source revision
b3be02af-25b3-464a-a2fd-3a3053bacd3f
Content fingerprint
c52055b86159874a6155f47f0280e82a4f7cc06c6e196f6b665bba44a95372a3
Source address
https://www.energy.ca.gov/powerplant/battery-storage-system/corby-battery-energy-storage-system-project

Project name

Source reported

Corby Battery Energy Storage System Project.

Attributed to California Energy Commission (externally supplied capture).

Source: California Energy Commission (externally supplied capture) · publication date not recorded · observed 2026-11-07

Sources and evidence · California Energy Commission (externally supplied capture)
Source published: Not recordedObserved: 2026-11-07

California Energy Commission (externally supplied capture)
Attributed to California Energy Commission (externally supplied capture)

Technical record · Corby Battery Energy Storage System Project.
Evidence location
/html/body/div[2]/div/div[4]/div/div/div/div[1]/h1
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
20100998-5cfd-41fc-840a-37ba70334912
Evidence reference
d853f4da-b652-44eb-badf-525c4f4723b4
Source revision
b3be02af-25b3-464a-a2fd-3a3053bacd3f
Content fingerprint
c52055b86159874a6155f47f0280e82a4f7cc06c6e196f6b665bba44a95372a3
Source address
https://www.energy.ca.gov/powerplant/battery-storage-system/corby-battery-energy-storage-system-project

Owner

Source reported

The CEC summary lists North Bay Interconnect, LLC and Corby Energy Storage, LLC as project owners. The description identifies Corby Energy Storage, LLC as applicant proposing to construct, own, and operate the project; PG&E would construct, own, and operate the specified portion of the gen-tie.

Attributed to California Energy Commission (externally supplied capture).

Source: California Energy Commission (externally supplied capture) · publication date not recorded · observed 2026-11-07

Sources and evidence · California Energy Commission (externally supplied capture)
Source published: Not recordedObserved: 2026-11-07

California Energy Commission (externally supplied capture)
Attributed to California Energy Commission (externally supplied capture)

Technical record · The CEC summary lists North Bay Interconnect, LLC …
Evidence location
/html/body/div[2]/div/div[4]/div/div/div/main/div[1]/div/div/div/div/div/div/div/dl
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
a4c35ad2-3428-4c1c-8ae0-bfaf5af3e96b
Evidence reference
9a20cceb-96d4-47f8-a253-1f851b6c09a7
Source revision
b3be02af-25b3-464a-a2fd-3a3053bacd3f
Content fingerprint
c52055b86159874a6155f47f0280e82a4f7cc06c6e196f6b665bba44a95372a3
Source address
https://www.energy.ca.gov/powerplant/battery-storage-system/corby-battery-energy-storage-system-project

Scope

Planned

The CEC summary lists capacity as 300 MW and 1,200 MWh. The description says Corby Energy Storage, LLC proposes a 300-MW battery energy storage system with a project substation, inverters, and ancillary facilities including fencing, a sound barrier, roads, retention basins, storage containers, and SCADA. The proposed connection to PG&E’s existing Vaca-Dixon Substation is an approximately 1.1-mile, 230-kV gen-tie with overhead and underground portions. Separately, PG&E would install a new 230-kV Double Bus Bay at that existing substation and construct, own, and operate the gen-tie segment from the ownership-change pole south of I-80 to the first point of interconnection, including five of the ten structures.

Attributed to California Energy Commission (externally supplied capture).

Source: California Energy Commission (externally supplied capture) · publication date not recorded · observed 2026-11-07

Sources and evidence · California Energy Commission (externally supplied capture)
Source published: Not recordedObserved: 2026-11-07

California Energy Commission (externally supplied capture)
Attributed to California Energy Commission (externally supplied capture)

Technical record · The CEC summary lists capacity as 300 MW …
Evidence location
/html/body/div[2]/div/div[4]/div/div/div/main/div[1]/div/div/div/div/div/div/div/dl
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
e14660e6-b1b0-4c37-a20b-2ccd19e62b6c
Evidence reference
9a20cceb-96d4-47f8-a253-1f851b6c09a7
Source revision
b3be02af-25b3-464a-a2fd-3a3053bacd3f
Content fingerprint
c52055b86159874a6155f47f0280e82a4f7cc06c6e196f6b665bba44a95372a3
Source address
https://www.energy.ca.gov/powerplant/battery-storage-system/corby-battery-energy-storage-system-project

Current activity

Planned

The proposed operating arrangement is unstaffed after construction, with control from an offsite control room through SCADA and periodic inspections and maintenance as necessary.

Attributed to California Energy Commission (externally supplied capture).

Source: California Energy Commission (externally supplied capture) · publication date not recorded · observed 2026-11-07

Sources and evidence · California Energy Commission (externally supplied capture)
Source published: Not recordedObserved: 2026-11-07

California Energy Commission (externally supplied capture)
Attributed to California Energy Commission (externally supplied capture)

Technical record · The proposed operating arrangement is unstaffed after construction, …
Evidence location
/html/body/div[2]/div/div[4]/div/div/div/main/div[2]/div[2]/p
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
77c00f01-9cde-46bd-bf2e-7f531c2672d5
Evidence reference
05c9c276-0b9f-4a5f-91fa-30a45397929c
Source revision
b3be02af-25b3-464a-a2fd-3a3053bacd3f
Content fingerprint
c52055b86159874a6155f47f0280e82a4f7cc06c6e196f6b665bba44a95372a3
Source address
https://www.energy.ca.gov/powerplant/battery-storage-system/corby-battery-energy-storage-system-project

Location

Source reported

An approximately 40.3-acre privately owned parcel southwest of the intersection of Kilkenny Road and Byrnes Road, in Solano County, California; Assessor’s Parcel Number 0141-030-090.

Attributed to California Energy Commission (externally supplied capture).

Source: California Energy Commission (externally supplied capture) · publication date not recorded · observed 2026-11-07

Sources and evidence · California Energy Commission (externally supplied capture)
Source published: Not recordedObserved: 2026-11-07

California Energy Commission (externally supplied capture)
Attributed to California Energy Commission (externally supplied capture)

Technical record · An approximately 40.3-acre privately owned parcel southwest of …
Evidence location
/html/body/div[2]/div/div[4]/div/div/div/main/div[1]/div/div/div/div/div/div/div/dl
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
f7795934-7aa2-41df-ab50-41b0e58dcd89
Evidence reference
9a20cceb-96d4-47f8-a253-1f851b6c09a7
Source revision
b3be02af-25b3-464a-a2fd-3a3053bacd3f
Content fingerprint
c52055b86159874a6155f47f0280e82a4f7cc06c6e196f6b665bba44a95372a3
Source address
https://www.energy.ca.gov/powerplant/battery-storage-system/corby-battery-energy-storage-system-project

Regulatory evidence

Source reported

CEC docket 24-OPT-05; project type is listed as Opt-In and status as Under Review.

Attributed to California Energy Commission (externally supplied capture).

Source: California Energy Commission (externally supplied capture) · publication date not recorded · observed 2026-11-07

Sources and evidence · California Energy Commission (externally supplied capture)
Source published: Not recordedObserved: 2026-11-07

California Energy Commission (externally supplied capture)
Attributed to California Energy Commission (externally supplied capture)

Technical record · CEC docket 24-OPT-05; project type is listed as …
Evidence location
/html/body/div[2]/div/div[4]/div/div/div/main/div[1]/div/div/div/div/div/div/div/dl
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
eca4919c-ddd6-4121-bea1-83c135bb7714
Evidence reference
9a20cceb-96d4-47f8-a253-1f851b6c09a7
Source revision
b3be02af-25b3-464a-a2fd-3a3053bacd3f
Content fingerprint
c52055b86159874a6155f47f0280e82a4f7cc06c6e196f6b665bba44a95372a3
Source address
https://www.energy.ca.gov/powerplant/battery-storage-system/corby-battery-energy-storage-system-project

Source qualifications and unresolved questions

  • Canonical facts retain their original source scope. Later source qualifications do not redefine the original asset or establish open supplier procurement.

The Corby row describes a Battery Storage generation plant with 300 MW net output to PG&E’s Vaca-Dixon Substation 230 kV Bus in Vacaville, Solano County, California. This is utility-side interconnection reporting, not evidence of achieved output. [u0001, page 6] (reported). PG&E via WECC (externally supplied capture), source observed 2026-11-07; https://www.wecc.org/sites/default/files/documents/progress_report/2026/PGAE%202026%20APR.pdf The row lists Jan-2027 under “Date in Service” (January 2027). In the context of Table 2’s planned-project heading, this is a listed utility-side date, not confirmation of actual service. [u0001, page 6] (planned). PG&E via WECC (externally supplied capture), source observed 2026-11-07; https://www.wecc.org/sites/default/files/documents/progress_report/2026/PGAE%202026%20APR.pdf The Corby row lists ENGINEERING; the table footnote defines this as “Engineering and design stage.” [u0001, page 6] (reported). PG&E via WECC (externally supplied capture), source observed 2026-11-07; https://www.wecc.org/sites/default/files/documents/progress_report/2026/PGAE%202026%20APR.pdf Table 2 is headed “Planned Generation Interconnection Projects” and states “Waiver of ‘Significant Transmission Project’ Status Granted in years up to and including 2025.” This is table-level context; the page does not give a Corby-specific waiver decision date. [u0001, page 6] (reported). PG&E via WECC (externally supplied capture), source observed 2026-11-07; https://www.wecc.org/sites/default/files/documents/progress_report/2026/PGAE%202026%20APR.pdf

Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.