Skip to content
Menu
CapexCue · Public evidence · Printed 11 Nov 2026
Explore projects / Project dossier

East Northants Resource Management Facility project

United Kingdom · Water and environment

In-depth research Release 1

Project scope

The application concerns alteration of existing facilities and construction of new facilities at the East Northants Resource Management Facility, for recovery and disposal of hazardous waste and disposal of low-level radioactive waste. The page classifies the application type as hazardous waste facilities. The number, design and boundaries of the individual facilities are not given in the supplied text.

Reported status and procurement

Reported development
Not established
Procurement availability
Unknown / not established

A source report alone does not establish current progress or an open buying window.

Project summary

The project information page describes an application to alter existing and build new facilities for hazardous-waste recovery and disposal, and for disposal of low-level radioactive waste. It classifies the application as hazardous waste facilities. The site is listed at Stamford Road, Northamptonshire, 2.6 km north of Kings Cliffe, East Northamptonshire. The page reports that the application was granted on 11 July 2013 and labels the project post-decision; its latest-update heading is dated 29 January 2020. These are reported page statements, not confirmation of current construction or procurement activity.

Evidence limits and unknowns

The source does not give the number or design of individual facilities, and its map-view boundary is unavailable.

The page's latest-update heading is dated 29 January 2020; it does not individually date the post-decision status statement. Current construction, operation and procurement status are not established by the cited text.

No contractor, procurement package, investment amount or financing arrangement is identified in the project information reviewed here.

The page says examination documents are archived and no longer available there, and refers readers to the Documents tab for the Secretary of State’s decision and Development Consent Order. Those documents are not included in the evidence reviewed here.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
United Kingdom
Based on reviewed release evidence
Region
Europe
Category
Water and environment
Derived from released evidence
Physical assets
Not classified

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Project name

Source reported

East Northants Resource Management Facility project

Attributed to Planning Inspectorate.

Source: Planning Inspectorate · publication date not recorded · observed 2026-10-01

Sources and evidence · Planning Inspectorate
Source published: Not recordedObserved: 2026-10-01

Planning Inspectorate
Attributed to Planning Inspectorate

Technical record · East Northants Resource Management Facility project
Evidence location
/html/head/title
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
01546ee8-2a42-44f8-9736-6e1b2807ec53
Evidence reference
812f0b3b-24e0-4937-80d4-3dea61d3ff4d
Source revision
d65cf6a5-572d-4f81-9ab2-8ba435fd38eb
Content fingerprint
298cafcd7fef4270d0c8e30e15606ceb5ff4e3d55de1633914b7a7391774785d
Source address
https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/WS010001

Scope

Source reported

The application concerns alteration of existing facilities and construction of new facilities at the East Northants Resource Management Facility, for recovery and disposal of hazardous waste and disposal of low-level radioactive waste. The page classifies the application type as hazardous waste facilities. The number, design and boundaries of the individual facilities are not given in the supplied text.

Attributed to Planning Inspectorate.

Source: Planning Inspectorate · publication date not recorded · observed 2026-10-01

Sources and evidence · Planning Inspectorate
Source published: Not recordedObserved: 2026-10-01

Planning Inspectorate
Attributed to Planning Inspectorate

Technical record · The application concerns alteration of existing facilities and …
Evidence location
/html/body/div[2]/main/div/div[2]/section[2]/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
81ed8e0e-8c56-404d-b92c-d56a09fef288
Evidence reference
51795db9-6d24-4548-a679-3fe509e237b1
Source revision
d65cf6a5-572d-4f81-9ab2-8ba435fd38eb
Content fingerprint
298cafcd7fef4270d0c8e30e15606ceb5ff4e3d55de1633914b7a7391774785d
Source address
https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/WS010001

Location

Source reported

East Northants Resource Management Facility, Stamford Road, Northamptonshire; described as 2.6 km north of Kings Cliffe, East Northamptonshire. The project boundary is not available in the page's map view.

Attributed to Planning Inspectorate.

Source: Planning Inspectorate · publication date not recorded · observed 2026-10-01

Sources and evidence · Planning Inspectorate
Source published: Not recordedObserved: 2026-10-01

Planning Inspectorate
Attributed to Planning Inspectorate

Technical record · East Northants Resource Management Facility, Stamford Road, Northamptonshire; …
Evidence location
/html/body/div[2]/main/div/div[2]/section[2]/p[3]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
3748ab32-23a7-403f-a78e-c496a8045301
Evidence reference
75808181-c3ef-4eac-bae1-ca8241586b05
Source revision
d65cf6a5-572d-4f81-9ab2-8ba435fd38eb
Content fingerprint
298cafcd7fef4270d0c8e30e15606ceb5ff4e3d55de1633914b7a7391774785d
Source address
https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/WS010001
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.