Skip to content
Menu
CapexCue · Public evidence · Printed 11 Nov 2026
Explore projects / Project dossier

Hirohara Battery Energy Storage System (BESS); also referenced as “Hirohara BESS”.

Japan · Energy

In-depth research Release 1

Project scope

Battery energy storage system and associated infrastructure.

Reported status and procurement

Reported development

Successful delivery and installation of all major project equipment, including 32 Tesla Megapack 2 XL battery units.

Procurement availability
Unknown / not established

Reported financing

Project financing secured.

A source report alone does not establish current progress or an open buying window.

Project summary

Hirohara BESS is a battery energy storage system with associated infrastructure in Miyazaki City, Miyazaki Prefecture, Japan. Eku Energy Japan reports that all major project equipment has been delivered and installed, including 32 Tesla Megapack 2 XL battery units. The next reported construction phase includes integration and commissioning, system testing, and regulatory inspections; commercial operations were reported as on track for January 2027. Eku Energy Japan is identified as the asset owner, and Tokyo Gas Co., Ltd. is to operate the facility for 20 years under the offtake arrangement. The release reports project financing from MUFG Bank but gives no financing amount. The opening dateline says August 4, 2026, while the page date field displays “4/8/2026” without specifying its format.

Evidence limits and unknowns

Rated power and energy capacity are not stated in the project description.

The supplied release does not identify procurement status or an open supplier package.

The financing amount is not stated.

The format of the page date field “4/8/2026” is unspecified.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
Japan
Based on reviewed release evidence
Region
Asia
Category
Energy
Derived from released evidence
Physical assets
Battery Storage

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Date

Source reported

The opening paragraph is datelined “Tokyo, Japan August 4, 2026”; the page date field displays “4/8/2026” (date format not specified).

Attributed to www.ekuenergy.com.

Source: www.ekuenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · www.ekuenergy.com
Source published: Not recordedObserved: 2026-10-17

www.ekuenergy.com
Attributed to www.ekuenergy.com

Technical record · The opening paragraph is datelined “Tokyo, Japan August …
Evidence location
/html/body/div[4]/div/div/div[2]/div[2]/div/div[1]/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
db6981a8-1773-449f-9216-84f20ed6e3a1
Evidence reference
2ec71066-4104-459c-9625-3b701c0b2dcf
Source revision
6b4217b7-92dc-4d71-821d-aad82571970e
Content fingerprint
39b8e732f09e8495cebae7b6bcc1836cbf1b03d60fa2cf70b510951d3bbb24f8
Source address
https://www.ekuenergy.com/en/news-and-blogs/news-hirohara-construction-milestone

Project name

Source reported

Hirohara Battery Energy Storage System (BESS); also referenced as “Hirohara BESS”.

Attributed to www.ekuenergy.com.

Source: www.ekuenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · www.ekuenergy.com
Source published: Not recordedObserved: 2026-10-17

www.ekuenergy.com
Attributed to www.ekuenergy.com

Technical record · Hirohara Battery Energy Storage System (BESS); also referenced …
Evidence location
/html/body/div[4]/div/div/div[2]/div[2]/div/div[1]/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
1c0fe784-c8aa-4cbb-835b-2f73bf844440
Evidence reference
2ec71066-4104-459c-9625-3b701c0b2dcf
Source revision
6b4217b7-92dc-4d71-821d-aad82571970e
Content fingerprint
39b8e732f09e8495cebae7b6bcc1836cbf1b03d60fa2cf70b510951d3bbb24f8
Source address
https://www.ekuenergy.com/en/news-and-blogs/news-hirohara-construction-milestone

Owner

Source reported

Eku Energy Japan owns the battery storage asset.

Attributed to www.ekuenergy.com.

Source: www.ekuenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · www.ekuenergy.com
Source published: Not recordedObserved: 2026-10-17

www.ekuenergy.com
Attributed to www.ekuenergy.com

Technical record · Eku Energy Japan owns the battery storage asset.
Evidence location
/html/body/div[4]/div/div/div[2]/div[2]/div/div[1]/p[3]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
2483ed07-2948-4004-a6be-b18f2350f2ec
Evidence reference
e47f71ea-3835-47cd-964e-03064a51ef9c
Source revision
6b4217b7-92dc-4d71-821d-aad82571970e
Content fingerprint
39b8e732f09e8495cebae7b6bcc1836cbf1b03d60fa2cf70b510951d3bbb24f8
Source address
https://www.ekuenergy.com/en/news-and-blogs/news-hirohara-construction-milestone

Scope

Source reported

Battery energy storage system and associated infrastructure.

Attributed to www.ekuenergy.com.

Source: www.ekuenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · www.ekuenergy.com
Source published: Not recordedObserved: 2026-10-17

www.ekuenergy.com
Attributed to www.ekuenergy.com

Technical record · Battery energy storage system and associated infrastructure.
Evidence location
/html/body/div[4]/div/div/div[2]/div[2]/div/div[1]/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
8f8d9273-aa6d-4bc0-9809-ba34a8b3f147
Evidence reference
2ec71066-4104-459c-9625-3b701c0b2dcf
Source revision
6b4217b7-92dc-4d71-821d-aad82571970e
Content fingerprint
39b8e732f09e8495cebae7b6bcc1836cbf1b03d60fa2cf70b510951d3bbb24f8
Source address
https://www.ekuenergy.com/en/news-and-blogs/news-hirohara-construction-milestone

Sector

Source reported

Battery energy storage system (BESS).

Attributed to www.ekuenergy.com.

Source: www.ekuenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · www.ekuenergy.com
Source published: Not recordedObserved: 2026-10-17

www.ekuenergy.com
Attributed to www.ekuenergy.com

Technical record · Battery energy storage system (BESS).
Evidence location
/html/body/div[4]/div/div/div[2]/div[2]/div/div[1]/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
f58ac438-917e-409b-af4e-08fffa3cc1d8
Evidence reference
2ec71066-4104-459c-9625-3b701c0b2dcf
Source revision
6b4217b7-92dc-4d71-821d-aad82571970e
Content fingerprint
39b8e732f09e8495cebae7b6bcc1836cbf1b03d60fa2cf70b510951d3bbb24f8
Source address
https://www.ekuenergy.com/en/news-and-blogs/news-hirohara-construction-milestone

Country

Source reported

Japan.

Attributed to www.ekuenergy.com.

Source: www.ekuenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · www.ekuenergy.com
Source published: Not recordedObserved: 2026-10-17

www.ekuenergy.com
Attributed to www.ekuenergy.com

Technical record · Japan.
Evidence location
/html/body/div[4]/div/div/div[2]/div[2]/div/div[1]/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
728d9a06-4417-4bc8-b659-311a43002de6
Evidence reference
2ec71066-4104-459c-9625-3b701c0b2dcf
Source revision
6b4217b7-92dc-4d71-821d-aad82571970e
Content fingerprint
39b8e732f09e8495cebae7b6bcc1836cbf1b03d60fa2cf70b510951d3bbb24f8
Source address
https://www.ekuenergy.com/en/news-and-blogs/news-hirohara-construction-milestone

Funding

Source reported

MUFG Bank is identified as the project financing provider; financing amount is not stated.

Attributed to www.ekuenergy.com.

Source: www.ekuenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · www.ekuenergy.com
Source published: Not recordedObserved: 2026-10-17

www.ekuenergy.com
Attributed to www.ekuenergy.com

Technical record · MUFG Bank is identified as the project financing …
Evidence location
/html/body/div[4]/div/div/div[2]/div[2]/div/div[1]/p[4]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
15059034-4001-413d-88b9-549f642ff650
Evidence reference
5edba457-309d-4762-bd20-1075ca8b6a7c
Source revision
6b4217b7-92dc-4d71-821d-aad82571970e
Content fingerprint
39b8e732f09e8495cebae7b6bcc1836cbf1b03d60fa2cf70b510951d3bbb24f8
Source address
https://www.ekuenergy.com/en/news-and-blogs/news-hirohara-construction-milestone

Delivery

Reported as actual

Successful delivery and installation of all major project equipment, including 32 Tesla Megapack 2 XL battery units.

Attributed to www.ekuenergy.com.

Source: www.ekuenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · www.ekuenergy.com
Source published: Not recordedObserved: 2026-10-17

www.ekuenergy.com
Attributed to www.ekuenergy.com

Technical record · Successful delivery and installation of all major project …
Evidence location
/html/body/div[4]/div/div/div[2]/div[2]/div/div[1]/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
dfeafb69-73cf-4b20-ae35-8f53a0a5574d
Evidence reference
2ec71066-4104-459c-9625-3b701c0b2dcf
Source revision
6b4217b7-92dc-4d71-821d-aad82571970e
Content fingerprint
39b8e732f09e8495cebae7b6bcc1836cbf1b03d60fa2cf70b510951d3bbb24f8
Source address
https://www.ekuenergy.com/en/news-and-blogs/news-hirohara-construction-milestone

Location

Source reported

Miyazaki City, Miyazaki Prefecture, Japan.

Attributed to www.ekuenergy.com.

Source: www.ekuenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · www.ekuenergy.com
Source published: Not recordedObserved: 2026-10-17

www.ekuenergy.com
Attributed to www.ekuenergy.com

Technical record · Miyazaki City, Miyazaki Prefecture, Japan.
Evidence location
/html/body/div[4]/div/div/div[2]/div[2]/div/div[1]/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
087f9514-98a4-4a17-bbea-5d45f6aa0921
Evidence reference
2ec71066-4104-459c-9625-3b701c0b2dcf
Source revision
6b4217b7-92dc-4d71-821d-aad82571970e
Content fingerprint
39b8e732f09e8495cebae7b6bcc1836cbf1b03d60fa2cf70b510951d3bbb24f8
Source address
https://www.ekuenergy.com/en/news-and-blogs/news-hirohara-construction-milestone

Operator

Planned

Tokyo Gas Co., Ltd. is to operate the facility over a 20-year term under the offtake arrangement.

Attributed to www.ekuenergy.com.

Source: www.ekuenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · www.ekuenergy.com
Source published: Not recordedObserved: 2026-10-17

www.ekuenergy.com
Attributed to www.ekuenergy.com

Technical record · Tokyo Gas Co., Ltd. is to operate the …
Evidence location
/html/body/div[4]/div/div/div[2]/div[2]/div/div[1]/p[3]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
ec0c0744-92bd-4251-9ebc-7d8b35c12b8d
Evidence reference
e47f71ea-3835-47cd-964e-03064a51ef9c
Source revision
6b4217b7-92dc-4d71-821d-aad82571970e
Content fingerprint
39b8e732f09e8495cebae7b6bcc1836cbf1b03d60fa2cf70b510951d3bbb24f8
Source address
https://www.ekuenergy.com/en/news-and-blogs/news-hirohara-construction-milestone

Next milestone

Planned

The project is to move into integration and commissioning, system testing, and regulatory inspections; commercial operations were reported as on track for January 2027.

Attributed to www.ekuenergy.com.

Source: www.ekuenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · www.ekuenergy.com
Source published: Not recordedObserved: 2026-10-17

www.ekuenergy.com
Attributed to www.ekuenergy.com

Technical record · The project is to move into integration and …
Evidence location
/html/body/div[4]/div/div/div[2]/div[2]/div/div[1]/p[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
dfeaeb25-32ef-4529-9e26-4ea952c69195
Evidence reference
58312f5b-7f92-4bb5-a95c-e8f7a0e1db26
Source revision
6b4217b7-92dc-4d71-821d-aad82571970e
Content fingerprint
39b8e732f09e8495cebae7b6bcc1836cbf1b03d60fa2cf70b510951d3bbb24f8
Source address
https://www.ekuenergy.com/en/news-and-blogs/news-hirohara-construction-milestone

Financing stage

Source reported

Project financing secured.

Attributed to www.ekuenergy.com.

Source: www.ekuenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · www.ekuenergy.com
Source published: Not recordedObserved: 2026-10-17

www.ekuenergy.com
Attributed to www.ekuenergy.com

Technical record · Project financing secured.
Evidence location
/html/body/div[4]/div/div/div[2]/div[2]/div/div[1]/p[4]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
e327f016-5c8e-490d-b00b-c81cda84fd6f
Evidence reference
5edba457-309d-4762-bd20-1075ca8b6a7c
Source revision
6b4217b7-92dc-4d71-821d-aad82571970e
Content fingerprint
39b8e732f09e8495cebae7b6bcc1836cbf1b03d60fa2cf70b510951d3bbb24f8
Source address
https://www.ekuenergy.com/en/news-and-blogs/news-hirohara-construction-milestone
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.