Project scope

Battery storage: an initial 100 MW/129 MWh installation, followed by a 50 MW/64.5 MWh expansion; the source says the full 150 MW was upgraded with Tesla’s Virtual Machine Mode to provide inertia support.

Reported status and procurement

Reported development

The source reports that the battery provides essential grid-support services and stores energy for delivery to the grid when needed.

Procurement availability
Unknown / not established

A source report alone does not establish current progress or an open buying window.

Project summary

Hornsdale Power Reserve is a grid-scale battery storage asset near Jamestown, South Australia, adjacent to Hornsdale Wind Farm. Its initial 100 MW/129 MWh installation was completed in November 2017, followed by a 50 MW/64.5 MWh expansion completed in September 2020. The source says the 150 MW facility was upgraded to provide inertia support. The source also reports that the battery provides grid-support services and stores energy for delivery to the grid when needed.

Evidence limits and unknowns

The page documents completed work in November 2017 and September 2020 but does not establish whether a current procurement package, further planned expansion, budget, or supplier opportunity exists.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
Australia
Based on reviewed release evidence
Region
Oceania
Category
Energy
Derived from released evidence
Physical assets
Battery Storage

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Date

Reported as actual

The initial 100 MW/129 MWh was completed in November 2017; the 50 MW/64.5 MWh expansion was completed in September 2020.

Attributed to hornsdalepowerreserve.com.au.

Source: hornsdalepowerreserve.com.au · publication date not recorded · observed 2026-10-17

Sources and evidence · hornsdalepowerreserve.com.au
Source published: Not recordedObserved: 2026-10-17

hornsdalepowerreserve.com.au
Attributed to hornsdalepowerreserve.com.au

Technical record · The initial 100 MW/129 MWh was completed in …
Evidence location
/html/body/main/div/div/section[2]/div/div[1]/div/div[2]/div/p[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
ee441563-e679-4842-a0ce-4bb96938d14b
Evidence reference
28cc3ccb-d41a-4460-b810-913fb8456a9d
Source revision
2e5a9d53-cb51-484b-b033-7c2a8f36a7a9
Content fingerprint
c9c0a84fb2e86f114c0a0ca3800ee1bf93a48154277d539818b67dd72368d57f
Source address
https://hornsdalepowerreserve.com.au/

Project name

Source reported

Hornsdale Power Reserve

Attributed to hornsdalepowerreserve.com.au.

Source: hornsdalepowerreserve.com.au · publication date not recorded · observed 2026-10-17

Sources and evidence · hornsdalepowerreserve.com.au
Source published: Not recordedObserved: 2026-10-17

hornsdalepowerreserve.com.au
Attributed to hornsdalepowerreserve.com.au

Technical record · Hornsdale Power Reserve
Evidence location
/html/head/title
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
45fa43ec-3365-4372-8fbe-ab989d56e957
Evidence reference
0a8913bd-519e-463a-8ce8-4cef80c1eb01
Source revision
2e5a9d53-cb51-484b-b033-7c2a8f36a7a9
Content fingerprint
c9c0a84fb2e86f114c0a0ca3800ee1bf93a48154277d539818b67dd72368d57f
Source address
https://hornsdalepowerreserve.com.au/

Scope

Reported as actual

Battery storage: an initial 100 MW/129 MWh installation, followed by a 50 MW/64.5 MWh expansion; the source says the full 150 MW was upgraded with Tesla’s Virtual Machine Mode to provide inertia support.

Attributed to hornsdalepowerreserve.com.au.

Source: hornsdalepowerreserve.com.au · publication date not recorded · observed 2026-10-17

Sources and evidence · hornsdalepowerreserve.com.au
Source published: Not recordedObserved: 2026-10-17

hornsdalepowerreserve.com.au
Attributed to hornsdalepowerreserve.com.au

Technical record · Battery storage: an initial 100 MW/129 MWh installation, …
Evidence location
/html/body/main/div/div/section[2]/div/div[1]/div/div[2]/div/p[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
cfe92144-16ee-4c37-a883-75bb9ab6cb0e
Evidence reference
28cc3ccb-d41a-4460-b810-913fb8456a9d
Source revision
2e5a9d53-cb51-484b-b033-7c2a8f36a7a9
Content fingerprint
c9c0a84fb2e86f114c0a0ca3800ee1bf93a48154277d539818b67dd72368d57f
Source address
https://hornsdalepowerreserve.com.au/

Sector

Source reported

Grid-scale battery energy storage.

Attributed to hornsdalepowerreserve.com.au.

Source: hornsdalepowerreserve.com.au · publication date not recorded · observed 2026-10-17

Sources and evidence · hornsdalepowerreserve.com.au
Source published: Not recordedObserved: 2026-10-17

hornsdalepowerreserve.com.au
Attributed to hornsdalepowerreserve.com.au

Technical record · Grid-scale battery energy storage.
Evidence location
/html/body/main/div/div/section[2]/div/div[1]/div/div[2]/div/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
14251b17-223f-4388-ba58-c06552706da9
Evidence reference
99650546-e857-412a-977f-b5eca83a912b
Source revision
2e5a9d53-cb51-484b-b033-7c2a8f36a7a9
Content fingerprint
c9c0a84fb2e86f114c0a0ca3800ee1bf93a48154277d539818b67dd72368d57f
Source address
https://hornsdalepowerreserve.com.au/

Current activity

Source reported

The source reports that the battery provides essential grid-support services and stores energy for delivery to the grid when needed.

Attributed to hornsdalepowerreserve.com.au.

Source: hornsdalepowerreserve.com.au · publication date not recorded · observed 2026-10-17

Sources and evidence · hornsdalepowerreserve.com.au
Source published: Not recordedObserved: 2026-10-17

hornsdalepowerreserve.com.au
Attributed to hornsdalepowerreserve.com.au

Technical record · The source reports that the battery provides essential …
Evidence location
/html/body/main/div/div/section[2]/div/div[1]/div/div[2]/div/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
36ace19b-1cf8-4c1d-870f-0a6a5239b1a0
Evidence reference
99650546-e857-412a-977f-b5eca83a912b
Source revision
2e5a9d53-cb51-484b-b033-7c2a8f36a7a9
Content fingerprint
c9c0a84fb2e86f114c0a0ca3800ee1bf93a48154277d539818b67dd72368d57f
Source address
https://hornsdalepowerreserve.com.au/

Location

Source reported

Approximately 15 km north of Jamestown, South Australia, next to the Hornsdale Wind Farm; the source also describes it as about a three-hour drive from Adelaide.

Attributed to hornsdalepowerreserve.com.au.

Source: hornsdalepowerreserve.com.au · publication date not recorded · observed 2026-10-17

Sources and evidence · hornsdalepowerreserve.com.au
Source published: Not recordedObserved: 2026-10-17

hornsdalepowerreserve.com.au
Attributed to hornsdalepowerreserve.com.au

Technical record · Approximately 15 km north of Jamestown, South Australia, …
Evidence location
/html/body/main/div/div/section[3]/div/div[2]/div/div[2]/div/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
d317d9c1-a386-475d-b847-dbdc317c45be
Evidence reference
022a5a35-4e2b-426d-8413-a70c82d56578
Source revision
2e5a9d53-cb51-484b-b033-7c2a8f36a7a9
Content fingerprint
c9c0a84fb2e86f114c0a0ca3800ee1bf93a48154277d539818b67dd72368d57f
Source address
https://hornsdalepowerreserve.com.au/
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.