Skip to content
Menu
CapexCue · Public evidence · Printed 11 Nov 2026
Explore projects / Project dossier

Northwich Flood Risk Management Scheme

United Kingdom · Water and environment

In-depth research Release 1

Project scope

A flood-defence scheme reported to protect around 400 homes and businesses. The described measures include floodgates and lightweight-aluminium temporary barriers; at Dane Bridge, a double layer of barriers forms a channel to keep the River Dane contained and prevent water escaping toward London Road or Watling Street. The source also cautions that flooding cannot be entirely ruled out.

Reported status and procurement

Reported development

The scheme is reported to have been in place since June 2018, to undergo regular testing and upkeep, and to have been called into action several times in recent years: during Storm Babet (2023), Storm Henk, Storm Bert and Storm Darragh (2024), and New Year 2025, Storm Claudia and Storm Bram (2025).

Procurement availability
Unknown / not established

A source report alone does not establish current progress or an open buying window.

Project summary

An Environment Agency press release published 7 October 2026 describes the Northwich scheme’s winter-preparedness exercise and routine upkeep. The exercise details are reported plans; the supplied article text does not confirm that the exercise or planned works were completed. The scheme is reported to protect around 400 homes and businesses, but the release also notes that flooding cannot be entirely ruled out.

Evidence limits and unknowns

The supplied article text reports the October exercise and works as planned, but does not confirm whether they took place or give results.

The supplied article text does not provide a complete asset inventory, technical design or capacity.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
United Kingdom
Based on reviewed release evidence
Region
Europe
Category
Water and environment
Derived from released evidence
Physical assets
Not classified

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Project name

Source reported

Northwich Flood Risk Management Scheme

Attributed to GOV.UK / Environment Agency.

Source: UK Environment Agency / GOV.UK · publication date not recorded · observed 2026-10-07

Sources and evidence · UK Environment Agency / GOV.UK
Source published: Not recordedObserved: 2026-10-07

UK Environment Agency / GOV.UK
Attributed to GOV.UK / Environment Agency

Technical record · Northwich Flood Risk Management Scheme
Evidence location
/html/body/div[2]/main/div[2]/div[1]/div[1]/div/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
1d67e6b8-36af-4c9b-aca3-b4484d62969e
Evidence reference
238ec0d9-7d0f-42ad-9869-2c2c1b137fbf
Source revision
d5ebf300-a890-4cee-b19e-181ddc08f3c0
Content fingerprint
03e1276abeb8f3e361340124b7c4b799cacbdd12b661e7adf3aa83ec134b778c
Source address
https://www.gov.uk/government/news/getting-winter-ready-northwich-defences-put-to-the-test

Scope

Source reported

A flood-defence scheme reported to protect around 400 homes and businesses. The described measures include floodgates and lightweight-aluminium temporary barriers; at Dane Bridge, a double layer of barriers forms a channel to keep the River Dane contained and prevent water escaping toward London Road or Watling Street. The source also cautions that flooding cannot be entirely ruled out.

Attributed to GOV.UK / Environment Agency.

Source: UK Environment Agency / GOV.UK · publication date not recorded · observed 2026-10-07

Sources and evidence · UK Environment Agency / GOV.UK
Source published: Not recordedObserved: 2026-10-07

UK Environment Agency / GOV.UK
Attributed to GOV.UK / Environment Agency

Technical record · A flood-defence scheme reported to protect around 400 …
Evidence location
/html/body/div[2]/main/div[2]/div[1]/div[1]/div/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
5a5643be-b91a-47df-8588-0ca4be66000d
Evidence reference
238ec0d9-7d0f-42ad-9869-2c2c1b137fbf
Source revision
d5ebf300-a890-4cee-b19e-181ddc08f3c0
Content fingerprint
03e1276abeb8f3e361340124b7c4b799cacbdd12b661e7adf3aa83ec134b778c
Source address
https://www.gov.uk/government/news/getting-winter-ready-northwich-defences-put-to-the-test

Current activity

Planned

The Environment Agency scheduled an annual winter-preparedness exercise to test the scheme from 5pm on Sunday 11 October to 5am on Monday 12 October 2026. Plans included erecting 69 metres of temporary defences, closing 12 floodgates, installing temporary barriers at Waitrose, Baron’s Quay and Dane Bridge, and rehearsing joint over-pumping with Cheshire West and Chester Council and United Utilities. Dane Bridge on London Road was to close to traffic, with an alternative route signposted. United Utilities had confirmed deployment of over-pumping resources for winter; the Council had positioned pumps and planned a Dane Street test with the Environment Agency. The exercise was also intended to allow routine checks and maintenance. These are reported plans, not confirmation that the exercise or works were completed.

Attributed to GOV.UK / Environment Agency.

Source: UK Environment Agency / GOV.UK · publication date not recorded · observed 2026-10-07

Sources and evidence · UK Environment Agency / GOV.UK
Source published: Not recordedObserved: 2026-10-07

UK Environment Agency / GOV.UK
Attributed to GOV.UK / Environment Agency

Technical record · The Environment Agency scheduled an annual winter-preparedness exercise …
Evidence location
/html/body/div[2]/main/div[1]/div[2]/p
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
b2a4692c-366e-40f8-a360-40f53a8a96d2
Evidence reference
e66d930d-99e1-41f9-bb6b-790cdfa93c2a
Source revision
d5ebf300-a890-4cee-b19e-181ddc08f3c0
Content fingerprint
03e1276abeb8f3e361340124b7c4b799cacbdd12b661e7adf3aa83ec134b778c
Source address
https://www.gov.uk/government/news/getting-winter-ready-northwich-defences-put-to-the-test

Delivery

Source reported

The scheme is reported to have been in place since June 2018, to undergo regular testing and upkeep, and to have been called into action several times in recent years: during Storm Babet (2023), Storm Henk, Storm Bert and Storm Darragh (2024), and New Year 2025, Storm Claudia and Storm Bram (2025).

Attributed to GOV.UK / Environment Agency.

Source: UK Environment Agency / GOV.UK · publication date not recorded · observed 2026-10-07

Sources and evidence · UK Environment Agency / GOV.UK
Source published: Not recordedObserved: 2026-10-07

UK Environment Agency / GOV.UK
Attributed to GOV.UK / Environment Agency

Technical record · The scheme is reported to have been in …
Evidence location
/html/body/div[2]/main/div[2]/div[1]/div[1]/div/p[8]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
7d7f2a9f-4cfc-445b-8389-756308c39972
Evidence reference
a5898411-3f4c-4d37-afad-6c43714da47b
Source revision
d5ebf300-a890-4cee-b19e-181ddc08f3c0
Content fingerprint
03e1276abeb8f3e361340124b7c4b799cacbdd12b661e7adf3aa83ec134b778c
Source address
https://www.gov.uk/government/news/getting-winter-ready-northwich-defences-put-to-the-test

Location

Source reported

Northwich. The planned exercise identifies Waitrose, Baron’s Quay, Dane Bridge on London Road, and Dane Street as locations for defence activity or pump testing.

Attributed to GOV.UK / Environment Agency.

Source: UK Environment Agency / GOV.UK · publication date not recorded · observed 2026-10-07

Sources and evidence · UK Environment Agency / GOV.UK
Source published: Not recordedObserved: 2026-10-07

UK Environment Agency / GOV.UK
Attributed to GOV.UK / Environment Agency

Technical record · Northwich. The planned exercise identifies Waitrose, Baron’s Quay, …
Evidence location
/html/body/div[2]/main/div[2]/div[1]/div[1]/div/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
90f5d58f-127a-48e1-b2a9-5924bbba16ed
Evidence reference
238ec0d9-7d0f-42ad-9869-2c2c1b137fbf
Source revision
d5ebf300-a890-4cee-b19e-181ddc08f3c0
Content fingerprint
03e1276abeb8f3e361340124b7c4b799cacbdd12b661e7adf3aa83ec134b778c
Source address
https://www.gov.uk/government/news/getting-winter-ready-northwich-defences-put-to-the-test
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.