Origin Energy Mortlake Power Station Battery

Australia · Energy

In-depth research Release 1

Project scope

Plan: Origin plans to construct a 300 MW / 650 MWh grid-forming battery using SMA inverters. It is planned to be commissioned with grid-forming functionality enabled, tuned to improve system stability in Victoria, and operated with that functionality enabled at all times.

Reported status and procurement

Reported development

Battery storage (primary project activity).

Procurement availability
Unknown / not established

A source report alone does not establish current progress or an open buying window.

Project summary

ARENA's project listing describes a planned 300 MW / 650 MWh grid-forming battery at Mortlake Power Station in Mortlake, Victoria, with SMA inverters. Origin Energy Power Limited is listed as the lead organisation. The listing reports $24 million in ARENA funding and a total project cost of $417 million. It lists project dates of 1 February 2024 to 30 April 2029 and says the page was last updated 29 May 2024.

Evidence limits and unknowns

The source, last updated 29 May 2024, does not establish whether construction has started, whether the project has been completed, or its current status.

The source does not state procurement status, supplier purchasing availability, or a buying window.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
Australia
Based on reviewed release evidence
Region
Oceania
Category
Energy
Derived from released evidence
Physical assets
Battery Storage

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Date

Source reported

Listed project start date: 1 February 2024; listed end date: 30 April 2029. ARENA page last updated: 29 May 2024.

Attributed to arena.gov.au.

Source: arena.gov.au · publication date not recorded · observed 2026-10-15

Sources and evidence · arena.gov.au
Source published: Not recordedObserved: 2026-10-15

arena.gov.au
Attributed to arena.gov.au

Technical record · Listed project start date: 1 February 2024; listed …
Evidence location
/html/body/div/main/div[2]/div[1]/div/div/ul/li[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
c22ae7b1-54ee-47bb-99f0-a005328a9654
Evidence reference
69c834f6-9106-4b80-947d-fb1e95092065
Source revision
ea8ddc9c-9cbb-45b4-b856-fa33dba7fdce
Content fingerprint
d8c355cf1e546c73916e7530c42c659b074dc46435a4095c56fb068b8db214d8
Source address
https://arena.gov.au/projects/origin-energy-mortlake-power-station-battery/

Project name

Source reported

Origin Energy Mortlake Power Station Battery

Attributed to arena.gov.au.

Source: arena.gov.au · publication date not recorded · observed 2026-10-15

Sources and evidence · arena.gov.au
Source published: Not recordedObserved: 2026-10-15

arena.gov.au
Attributed to arena.gov.au

Technical record · Origin Energy Mortlake Power Station Battery
Evidence location
/html/body/div/main/div[1]/div/div/div/h1
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
b6552b6b-0eaf-4066-911a-d50efbdd1f84
Evidence reference
ebece87d-637b-4730-bce5-638361fdaa93
Source revision
ea8ddc9c-9cbb-45b4-b856-fa33dba7fdce
Content fingerprint
d8c355cf1e546c73916e7530c42c659b074dc46435a4095c56fb068b8db214d8
Source address
https://arena.gov.au/projects/origin-energy-mortlake-power-station-battery/

Scope

Planned

Origin plans to construct a 300 MW / 650 MWh grid-forming battery using SMA inverters. It is planned to be commissioned with grid-forming functionality enabled, tuned to improve system stability in Victoria, and operated with that functionality enabled at all times.

Attributed to arena.gov.au.

Source: arena.gov.au · publication date not recorded · observed 2026-10-15

Sources and evidence · arena.gov.au
Source published: Not recordedObserved: 2026-10-15

arena.gov.au
Attributed to arena.gov.au

Technical record · Origin plans to construct a 300 MW / …
Evidence location
/html/body/div/main/div[2]/div[2]/div[1]/div/p
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
0b4386d6-7205-46c7-9ef0-0fb6f3b8545a
Evidence reference
a28cada9-bffc-4264-89a3-e0a83bce5fa8
Source revision
ea8ddc9c-9cbb-45b4-b856-fa33dba7fdce
Content fingerprint
d8c355cf1e546c73916e7530c42c659b074dc46435a4095c56fb068b8db214d8
Source address
https://arena.gov.au/projects/origin-energy-mortlake-power-station-battery/

Current activity

Source reported

Battery storage (primary project activity).

Attributed to arena.gov.au.

Source: arena.gov.au · publication date not recorded · observed 2026-10-15

Sources and evidence · arena.gov.au
Source published: Not recordedObserved: 2026-10-15

arena.gov.au
Attributed to arena.gov.au

Technical record · Battery storage (primary project activity).
Evidence location
/html/body/div/main/div[2]/div[2]/div[2]/div[1]/ul/li
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
43f20d27-58f7-4c3d-b571-5545f8fbb96b
Evidence reference
333afbb1-0e39-4e1b-9351-4359e577032f
Source revision
ea8ddc9c-9cbb-45b4-b856-fa33dba7fdce
Content fingerprint
d8c355cf1e546c73916e7530c42c659b074dc46435a4095c56fb068b8db214d8
Source address
https://arena.gov.au/projects/origin-energy-mortlake-power-station-battery/

Location

Source reported

Mortlake Power Station, Mortlake, Victoria.

Attributed to arena.gov.au.

Source: arena.gov.au · publication date not recorded · observed 2026-10-15

Sources and evidence · arena.gov.au
Source published: Not recordedObserved: 2026-10-15

arena.gov.au
Attributed to arena.gov.au

Technical record · Mortlake Power Station, Mortlake, Victoria.
Evidence location
/html/body/div/main/div[2]/div[1]/div/div/ul/li[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
5a58d645-4db4-4c84-a75e-50b77358fbb0
Evidence reference
22a990ef-a838-4896-938b-b254ea23e2dc
Source revision
ea8ddc9c-9cbb-45b4-b856-fa33dba7fdce
Content fingerprint
d8c355cf1e546c73916e7530c42c659b074dc46435a4095c56fb068b8db214d8
Source address
https://arena.gov.au/projects/origin-energy-mortlake-power-station-battery/

Developer

Source reported

Origin Energy Power Limited, listed as the lead organisation.

Attributed to arena.gov.au.

Source: arena.gov.au · publication date not recorded · observed 2026-10-15

Sources and evidence · arena.gov.au
Source published: Not recordedObserved: 2026-10-15

arena.gov.au
Attributed to arena.gov.au

Technical record · Origin Energy Power Limited, listed as the lead …
Evidence location
/html/body/div/main/div[2]/div[1]/div/div/ul/li[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
bc88dc76-a0ba-401e-98d8-0acf4be3f086
Evidence reference
22a990ef-a838-4896-938b-b254ea23e2dc
Source revision
ea8ddc9c-9cbb-45b4-b856-fa33dba7fdce
Content fingerprint
d8c355cf1e546c73916e7530c42c659b074dc46435a4095c56fb068b8db214d8
Source address
https://arena.gov.au/projects/origin-energy-mortlake-power-station-battery/

Source programme

Source reported

Advancing Renewables Program.

Attributed to arena.gov.au.

Source: arena.gov.au · publication date not recorded · observed 2026-10-15

Sources and evidence · arena.gov.au
Source published: Not recordedObserved: 2026-10-15

arena.gov.au
Attributed to arena.gov.au

Technical record · Advancing Renewables Program.
Evidence location
/html/body/div/main/div[2]/div[1]/div/div/ul/li[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
09e82b09-a944-4f7d-965a-e335d90a7e31
Evidence reference
22a990ef-a838-4896-938b-b254ea23e2dc
Source revision
ea8ddc9c-9cbb-45b4-b856-fa33dba7fdce
Content fingerprint
d8c355cf1e546c73916e7530c42c659b074dc46435a4095c56fb068b8db214d8
Source address
https://arena.gov.au/projects/origin-energy-mortlake-power-station-battery/

Financing amount

Source reported

$24 million funded by ARENA; total project cost listed as $417 million.

Attributed to arena.gov.au.

Source: arena.gov.au · publication date not recorded · observed 2026-10-15

Sources and evidence · arena.gov.au
Source published: Not recordedObserved: 2026-10-15

arena.gov.au
Attributed to arena.gov.au

Technical record · $24 million funded by ARENA; total project cost …
Evidence location
/html/body/div/main/div[1]/div/div/div/ul/li[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
70d4d265-9b1f-4476-bb5f-91dff24bf15f
Evidence reference
862a308a-f3a4-405e-af07-630f3a4c362e
Source revision
ea8ddc9c-9cbb-45b4-b856-fa33dba7fdce
Content fingerprint
d8c355cf1e546c73916e7530c42c659b074dc46435a4095c56fb068b8db214d8
Source address
https://arena.gov.au/projects/origin-energy-mortlake-power-station-battery/
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.