Skip to content
Menu
CapexCue · Public evidence · Printed 11 Nov 2026
Explore projects / Project dossier

Pinnapuram pumped storage plant, identified as the pumped-storage component of the overall project named Pinnapuram IRESP.

India · Energy

In-depth research Release 1

Project scope

Pumped-storage plant within an integrated renewable-energy scheme combining pumped storage, solar and wind. The pumped-storage component is listed at 1,680 MW. Reported plant design scope includes civil and hydro-mechanical works and interfaces with electro-mechanical works.

Reported status and procurement

Reported development

AFRY reports providing detailed design and engineering services for civil and hydro-mechanical works, interfacing with electro-mechanical works, and reviewing Phase A electro-mechanical technical specifications; the project facts describe AFRY as principal design consultant for the pumped-storage plant.

Procurement availability
Unknown / not established

A source report alone does not establish current progress or an open buying window.

Project summary

AFRY describes the Pinnapuram pumped-storage plant as a component of Greenko’s integrated solar, wind and storage project. Its listed capacity is 1,680 MW, and the reported site is Pinnapuram village in Andhra Pradesh. Reported plant design work covers civil and hydro-mechanical works and interfaces with electro-mechanical works; AFRY is identified as principal design consultant. The listed project duration is June 2022–December 2024, with December 2024 given as a commissioning target.

Evidence limits and unknowns

The supplied text does not confirm whether the plant is now commissioned or operating. It lists a December 2024 commissioning target and separately describes the overall project as nearing commercial operation, without confirming that commissioning occurred.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
India
Based on reviewed release evidence
Region
Asia
Category
Energy
Derived from released evidence
Physical assets
Pumped Hydro

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Date

Source reported

Project facts list a duration of June 2022–December 2024. A separate statement gives December 2024 as the target commissioning date; this is a stated target, not confirmation that commissioning occurred.

Attributed to afry.com.

Source: afry.com · publication date not recorded · observed 2026-10-17

Sources and evidence · afry.com
Source published: Not recordedObserved: 2026-10-17

afry.com
Attributed to afry.com

Technical record · Project facts list a duration of June 2022–December …
Evidence location
/html/body/div/div/main/div/div/div/article/div/div[2]/div[4]/div/div/section/div/ul/li[5]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
90b946fe-bc38-4863-a22e-f7088f4fbf94
Evidence reference
887790b9-c6c7-4fc1-8536-41aa5c3402f0
Source revision
f70a1ae9-5d7b-49c7-8747-cd593cfc9cf7
Content fingerprint
8c60a3aeeb7952f198936086c7a75de2aa34ffbfbc94fb4f6b30de607aba57d5
Source address
https://afry.com/en/project/pinnapuram-integrated-renewable-energy-storage-project-india

Project name

Source reported

Pinnapuram pumped storage plant, identified as the pumped-storage component of the overall project named Pinnapuram IRESP.

Attributed to afry.com.

Source: afry.com · publication date not recorded · observed 2026-10-17

Sources and evidence · afry.com
Source published: Not recordedObserved: 2026-10-17

afry.com
Attributed to afry.com

Technical record · Pinnapuram pumped storage plant, identified as the pumped-storage …
Evidence location
/html/body/div/div/main/div/div/div/article/div/div[2]/div[8]/div/div/div/div/div[2]/div/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
5940692f-c6b1-4ade-bea3-539894847607
Evidence reference
941b9c19-0344-421a-9fa2-2e66fa25ecf6
Source revision
f70a1ae9-5d7b-49c7-8747-cd593cfc9cf7
Content fingerprint
8c60a3aeeb7952f198936086c7a75de2aa34ffbfbc94fb4f6b30de607aba57d5
Source address
https://afry.com/en/project/pinnapuram-integrated-renewable-energy-storage-project-india

Scope

Source reported

Pumped-storage plant within an integrated renewable-energy scheme combining pumped storage, solar and wind. The pumped-storage component is listed at 1,680 MW. Reported plant design scope includes civil and hydro-mechanical works and interfaces with electro-mechanical works.

Attributed to afry.com.

Source: afry.com · publication date not recorded · observed 2026-10-17

Sources and evidence · afry.com
Source published: Not recordedObserved: 2026-10-17

afry.com
Attributed to afry.com

Technical record · Pumped-storage plant within an integrated renewable-energy scheme combining …
Evidence location
/html/body/div/div/main/div/div/div/article/div/div[2]/div[2]/div/div/section/div/p[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
b8694a92-1738-49ee-a1d5-af468f853b78
Evidence reference
c34ac8b6-d86e-445e-b996-999fb8874742
Source revision
f70a1ae9-5d7b-49c7-8747-cd593cfc9cf7
Content fingerprint
8c60a3aeeb7952f198936086c7a75de2aa34ffbfbc94fb4f6b30de607aba57d5
Source address
https://afry.com/en/project/pinnapuram-integrated-renewable-energy-storage-project-india

Sector

Source reported

Renewable energy storage and generation, integrated with solar and wind power.

Attributed to afry.com.

Source: afry.com · publication date not recorded · observed 2026-10-17

Sources and evidence · afry.com
Source published: Not recordedObserved: 2026-10-17

afry.com
Attributed to afry.com

Technical record · Renewable energy storage and generation, integrated with solar …
Evidence location
/html/body/div/div/main/div/div/div/article/div/div[2]/div[2]/div/div/section/div/p[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
7b3ad11f-f054-4cc8-ae82-ef756bf82170
Evidence reference
c34ac8b6-d86e-445e-b996-999fb8874742
Source revision
f70a1ae9-5d7b-49c7-8747-cd593cfc9cf7
Content fingerprint
8c60a3aeeb7952f198936086c7a75de2aa34ffbfbc94fb4f6b30de607aba57d5
Source address
https://afry.com/en/project/pinnapuram-integrated-renewable-energy-storage-project-india

Current activity

Source reported

AFRY reports providing detailed design and engineering services for civil and hydro-mechanical works, interfacing with electro-mechanical works, and reviewing Phase A electro-mechanical technical specifications; the project facts describe AFRY as principal design consultant for the pumped-storage plant.

Attributed to afry.com.

Source: afry.com · publication date not recorded · observed 2026-10-17

Sources and evidence · afry.com
Source published: Not recordedObserved: 2026-10-17

afry.com
Attributed to afry.com

Technical record · AFRY reports providing detailed design and engineering services …
Evidence location
/html/body/div/div/main/div/div/div/article/div/div[2]/div[3]/div/div/section/div[2]/div/p[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
fcabdf2d-8ab1-412e-8cf9-ee46faa4c884
Evidence reference
42c24096-522c-43ac-a67b-9f6a19228dfc
Source revision
f70a1ae9-5d7b-49c7-8747-cd593cfc9cf7
Content fingerprint
8c60a3aeeb7952f198936086c7a75de2aa34ffbfbc94fb4f6b30de607aba57d5
Source address
https://afry.com/en/project/pinnapuram-integrated-renewable-energy-storage-project-india

Location

Source reported

Pinnapuram village, Kurnool district, Andhra Pradesh, India.

Attributed to afry.com.

Source: afry.com · publication date not recorded · observed 2026-10-17

Sources and evidence · afry.com
Source published: Not recordedObserved: 2026-10-17

afry.com
Attributed to afry.com

Technical record · Pinnapuram village, Kurnool district, Andhra Pradesh, India.
Evidence location
/html/body/div/div/main/div/div/div/article/div/div[2]/div[8]/div/div/div/div/div[2]/div/p[5]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
a8ebcbad-c53a-4a57-a4a8-5be7d135d2e1
Evidence reference
3919870d-f609-457f-b4a1-2fba64d43d33
Source revision
f70a1ae9-5d7b-49c7-8747-cd593cfc9cf7
Content fingerprint
8c60a3aeeb7952f198936086c7a75de2aa34ffbfbc94fb4f6b30de607aba57d5
Source address
https://afry.com/en/project/pinnapuram-integrated-renewable-energy-storage-project-india

Developer

Source reported

Greenko is reported to have developed the overall Integrated Renewable Energy Storage Project.

Attributed to afry.com.

Source: afry.com · publication date not recorded · observed 2026-10-17

Sources and evidence · afry.com
Source published: Not recordedObserved: 2026-10-17

afry.com
Attributed to afry.com

Technical record · Greenko is reported to have developed the overall …
Evidence location
/html/body/div/div/main/div/div/div/article/div/div[2]/div[2]/div/div/section/div/p[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
5cd53231-b9a7-45a6-acb1-99df3005d3bb
Evidence reference
c34ac8b6-d86e-445e-b996-999fb8874742
Source revision
f70a1ae9-5d7b-49c7-8747-cd593cfc9cf7
Content fingerprint
8c60a3aeeb7952f198936086c7a75de2aa34ffbfbc94fb4f6b30de607aba57d5
Source address
https://afry.com/en/project/pinnapuram-integrated-renewable-energy-storage-project-india
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.