The Grand Union Canal Transfer

United Kingdom · Water and environment

In-depth research Release 1

Project scope

Plan: The Grand Union Canal Transfer project will transfer water from Severn Trent’s supply area to areas of water deficit in Affinity Water’s supply area, via a combination of treatment plants, pipelines and use of the Canal & River Trust’s historic canal network. Recycled water will be treated in a new Advanced Water Treatment Plant before being transferred east via a new pipeline to the north-east of Birmingham and discharged into the Coventry Canal near Atherstone. Thereafter, the existing Coventry, Oxford and Grand Union canals, in addition to their statutory navigation role, will convey the treated recycled water to an abstraction point on the canal network between Milton Keynes and the Chilterns, where water will be stored in a new reservoir and further treated to drinking water quality prior to its entry via a new pipeline into Affinity Water’s distribution system to the west of Luton. The project is linear in nature and extends to approximately 160km.

Reported status and procurement

Reported development

This project is at the pre-application stage. The application is expected to be submitted July 2027.

Procurement availability
Unknown / not established

A source report alone does not establish current progress or an open buying window.

Project summary

The planned scheme would transfer recycled water from Severn Trent’s supply area to areas of water deficit in Affinity Water’s supply area, using new treatment and pipeline infrastructure alongside existing canals, with storage and further treatment before entry to Affinity Water’s network. The described route is approximately 160 km, from Minworth near Birmingham via Atherstone and the Coventry, Oxford and Grand Union canals to a reservoir near Luton. The project page reports pre-application status and an expected application submission in July 2027. The source was observed on 1 October 2026; these statements do not establish subsequent progress [u0026; source observation date: 1 October 2026].

Evidence limits and unknowns

The supplied paragraphs do not establish a tender timetable, budget, appointed EPC or contractor, capacity, or specific supplier packages.

Current progress after the source observation on 1 October 2026 is not established by this record; the reported July 2027 submission date is an expectation [u0026; source observation date: 1 October 2026].

Only the supplied project-page paragraphs were reviewed, not the whole page or linked documents. Email-containing and link-only material was excluded, and graphical content was not reviewed [source coverage and limitations; u0001–u0027].

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
United Kingdom
Based on reviewed release evidence
Region
Europe
Category
Water and environment
Derived from released evidence
Physical assets
Drinking Water, Wastewater Treatment

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Project name

Source reported

The Grand Union Canal Transfer

Attributed to Planning Inspectorate.

Source: Planning Inspectorate · publication date not recorded · observed 2026-10-01

Sources and evidence · Planning Inspectorate
Source published: Not recordedObserved: 2026-10-01

Planning Inspectorate
Attributed to Planning Inspectorate

Technical record · The Grand Union Canal Transfer
Evidence location
native-name-name
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
d64cf371-8b3d-43d0-a30d-9053bd52aed6
Evidence reference
08af3f97-69d7-43c2-861c-60efeab480e3
Source revision
ae6171e3-9646-4181-a975-5a53e45e27d5
Content fingerprint
4263091ce781dc97e719092e280e80a157be305b55c5f52967c021535f8c5630
Source address
https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/WA0210001

Scope

Planned

The Grand Union Canal Transfer project will transfer water from Severn Trent’s supply area to areas of water deficit in Affinity Water’s supply area, via a combination of treatment plants, pipelines and use of the Canal & River Trust’s historic canal network. Recycled water will be treated in a new Advanced Water Treatment Plant before being transferred east via a new pipeline to the north-east of Birmingham and discharged into the Coventry Canal near Atherstone. Thereafter, the existing Coventry, Oxford and Grand Union canals, in addition to their statutory navigation role, will convey the treated recycled water to an abstraction point on the canal network between Milton Keynes and the Chilterns, where water will be stored in a new reservoir and further treated to drinking water quality prior to its entry via a new pipeline into Affinity Water’s distribution system to the west of Luton. The project is linear in nature and extends to approximately 160km.

Attributed to Planning Inspectorate.

Source: Planning Inspectorate · publication date not recorded · observed 2026-10-01

Sources and evidence · Planning Inspectorate
Source published: Not recordedObserved: 2026-10-01

Planning Inspectorate
Attributed to Planning Inspectorate

Technical record · The Grand Union Canal Transfer project will transfer …
Evidence location
native-scope-scope
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
eda61968-26c7-437c-b323-6f36345f85b1
Evidence reference
9f63c7e9-e5b1-490f-8622-8ba6b14e649c
Source revision
ae6171e3-9646-4181-a975-5a53e45e27d5
Content fingerprint
4263091ce781dc97e719092e280e80a157be305b55c5f52967c021535f8c5630
Source address
https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/WA0210001

Delivery

Source reported

This project is at the pre-application stage. The application is expected to be submitted July 2027.

Attributed to Planning Inspectorate.

Source: Planning Inspectorate · publication date not recorded · observed 2026-10-01

Sources and evidence · Planning Inspectorate
Source published: Not recordedObserved: 2026-10-01

Planning Inspectorate
Attributed to Planning Inspectorate

Technical record · This project is at the pre-application stage. The …
Evidence location
native-delivery-adverse_context
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
1f2c2556-df6a-4741-8ccd-b94de21f7149
Evidence reference
1d300d4f-11f9-407b-9682-06c5ee210982
Source revision
ae6171e3-9646-4181-a975-5a53e45e27d5
Content fingerprint
4263091ce781dc97e719092e280e80a157be305b55c5f52967c021535f8c5630
Source address
https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/WA0210001

Location

Source reported

The project is linear in nature and extends to approximately 160km. From north to south, the project starts at the Minworth Wastewater Recycling Centre north-east of Birmingham. Thereafter water will be transferred eastwards to the Coventry Canal at Atherstone. From the Coventry Canal, the site of the project extends in a south-easterly direction connecting to the Oxford Canal followed by the Grand Union Canal. Water will then be abstracted and treated south of Milton Keynes before being transferred to an existing water supply reservoir near Luton.

Attributed to Planning Inspectorate.

Source: Planning Inspectorate · publication date not recorded · observed 2026-10-01

Sources and evidence · Planning Inspectorate
Source published: Not recordedObserved: 2026-10-01

Planning Inspectorate
Attributed to Planning Inspectorate

Technical record · The project is linear in nature and extends …
Evidence location
native-location-location
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
0b0934ef-dc49-47c6-b1d1-2c3a987f2c78
Evidence reference
cd2eb16b-3dad-4484-bac4-5fa4ee0b125a
Source revision
ae6171e3-9646-4181-a975-5a53e45e27d5
Content fingerprint
4263091ce781dc97e719092e280e80a157be305b55c5f52967c021535f8c5630
Source address
https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/WA0210001
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.