Stallingborough Combined Cycle Gas Turbine (CCGT) generating plant and Carbon Capture Plant (CCP)

United Kingdom · Energy

In-depth research Release 1

Project scope

Plan: The project comprises the construction and operation of the Stallingborough CCGT generating plant and CCP which is anticipated to generate approximately 900 megawatts of electricity. Natural gas will be transported to the Main Site by a pipeline from the Ulceby and Habrough area in an easterly direction. Electricity will be supplied from the Main Site into the grid by a new electrical connection leading in a southerly direction to the existing West Grimsby substation. The Stallingborough CCGT generating plant and CCP is located within land owned by the Applicant’s Group, whereas the route for the natural gas pipeline and electricity connection, which is owned by a number of third parties, will be determined as part of the route selection and iterative environmental impact assessment processes. The potential cooling water infrastructure would be located within the Humber estuary where the foreshore is owned by the Crown Estate and the potential laydown area at the RWE CHP Grimsby site is under RWE ownership.The Main Site will be fitted with carbon capture equipment and carbon dioxide will be transported to offshore geological storage under the north sea and this transport and storage is expected to utilise the separate Viking CCS pipeline (PINS case reference EN070008). A connection between the Main Site and the Viking CCS pipeline will be delivered as a part of a separate project and consenting process.

Reported status and procurement

Reported development

This project is at the pre-application stage. The application is expected to be submitted July 2027.

Procurement availability
Unknown / not established

A source report alone does not establish current progress or an open buying window.

Project summary

The Planning Inspectorate project-page text observed on 1 October 2026 described the project as pre-application, with an application expected in July 2027. This is a reported status and forecast, not confirmation of submission or later progress.

The planned development includes a CCGT generating plant with carbon capture, with generation anticipated at approximately 900 MW. The description includes gas and electricity connections whose routes were to be determined, potential cooling-water infrastructure, and carbon-dioxide transport expected to use the separate Viking CCS pipeline. The connection to that pipeline is described as part of a separate project and consenting process.

The main site is approximately 4 km south-east of Immingham.

Evidence limits and unknowns

The supplied text does not establish whether the application was submitted after the stated July 2027 expectation or whether the project has since progressed.

The supplied description does not establish the selected gas-pipeline or electricity-connection routes, whether potential cooling-water infrastructure will proceed, or procurement availability.

Only the supplied project-page text was reviewed. Email-containing and link-only paragraphs, linked documents and graphical content were outside the review.

Later project progress and purchasing availability are unverified.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
United Kingdom
Based on reviewed release evidence
Region
Europe
Category
Energy
Derived from released evidence
Physical assets
Carbon Capture, Electricity Transmission

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Project name

Source reported

Stallingborough Combined Cycle Gas Turbine (CCGT) generating plant and Carbon Capture Plant (CCP)

Attributed to Planning Inspectorate.

Source: Planning Inspectorate · publication date not recorded · observed 2026-10-01

Sources and evidence · Planning Inspectorate
Source published: Not recordedObserved: 2026-10-01

Planning Inspectorate
Attributed to Planning Inspectorate

Technical record · Stallingborough Combined Cycle Gas Turbine (CCGT) generating plant …
Evidence location
native-name-name
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
7067b60a-2796-470b-9199-b4f6b044df30
Evidence reference
922acc45-0de2-46aa-a63c-7bb13bacce47
Source revision
7c39bb5a-e1a2-4b62-90da-fef25e636247
Content fingerprint
825c25056abae0dcfef7b18ddf25243c7613441bf999a461332e4a5adbcf628b
Source address
https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010161

Scope

Planned

The project comprises the construction and operation of the Stallingborough CCGT generating plant and CCP which is anticipated to generate approximately 900 megawatts of electricity. Natural gas will be transported to the Main Site by a pipeline from the Ulceby and Habrough area in an easterly direction. Electricity will be supplied from the Main Site into the grid by a new electrical connection leading in a southerly direction to the existing West Grimsby substation. The Stallingborough CCGT generating plant and CCP is located within land owned by the Applicant’s Group, whereas the route for the natural gas pipeline and electricity connection, which is owned by a number of third parties, will be determined as part of the route selection and iterative environmental impact assessment processes. The potential cooling water infrastructure would be located within the Humber estuary where the foreshore is owned by the Crown Estate and the potential laydown area at the RWE CHP Grimsby site is under RWE ownership.The Main Site will be fitted with carbon capture equipment and carbon dioxide will be transported to offshore geological storage under the north sea and this transport and storage is expected to utilise the separate Viking CCS pipeline (PINS case reference EN070008). A connection between the Main Site and the Viking CCS pipeline will be delivered as a part of a separate project and consenting process.

Attributed to Planning Inspectorate.

Source: Planning Inspectorate · publication date not recorded · observed 2026-10-01

Sources and evidence · Planning Inspectorate
Source published: Not recordedObserved: 2026-10-01

Planning Inspectorate
Attributed to Planning Inspectorate

Technical record · The project comprises the construction and operation of …
Evidence location
native-scope-scope
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
133fb2d2-6c25-42fa-9c6b-5347d33140c1
Evidence reference
e558b9c8-759e-4385-9de7-387e257bd5b0
Source revision
7c39bb5a-e1a2-4b62-90da-fef25e636247
Content fingerprint
825c25056abae0dcfef7b18ddf25243c7613441bf999a461332e4a5adbcf628b
Source address
https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010161

Delivery

Source reported

This project is at the pre-application stage. The application is expected to be submitted July 2027.

Attributed to Planning Inspectorate.

Source: Planning Inspectorate · publication date not recorded · observed 2026-10-01

Sources and evidence · Planning Inspectorate
Source published: Not recordedObserved: 2026-10-01

Planning Inspectorate
Attributed to Planning Inspectorate

Technical record · This project is at the pre-application stage. The …
Evidence location
native-delivery-adverse_context
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
9107f014-2984-4913-9fa1-01c070f8c322
Evidence reference
33797738-078d-4ee5-994a-845cd6880128
Source revision
7c39bb5a-e1a2-4b62-90da-fef25e636247
Content fingerprint
825c25056abae0dcfef7b18ddf25243c7613441bf999a461332e4a5adbcf628b
Source address
https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010161

Location

Source reported

The main site for the CCGT generating plant and CCP is approximately 4km south east of Immingham.

Attributed to Planning Inspectorate.

Source: Planning Inspectorate · publication date not recorded · observed 2026-10-01

Sources and evidence · Planning Inspectorate
Source published: Not recordedObserved: 2026-10-01

Planning Inspectorate
Attributed to Planning Inspectorate

Technical record · The main site for the CCGT generating plant …
Evidence location
native-location-location
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
3b969cf0-8b73-4189-8b14-137a568e9b2e
Evidence reference
1a341a0b-3bdb-4e5e-8a85-1e9c3cdacd41
Source revision
7c39bb5a-e1a2-4b62-90da-fef25e636247
Content fingerprint
825c25056abae0dcfef7b18ddf25243c7613441bf999a461332e4a5adbcf628b
Source address
https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010161
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.