Project scope

Plan: The shared connection includes an offshore electrical substation, three submarine links over 45 km to the landing at Erdeven, and three underground land links over 26 km to the onshore substation at Pluvigner. The offshore substation is described as 70 m square, 30 m above and 90 m below the sea surface. The submarine links are to be buried 0.3–2.5 m deep; on land, the links use trenches 0.5–0.7 m wide and about 1 m deep. The Pluvigner substation occupies 8.4 ha, with four 28 m pylons connecting it to the electricity network.

Reported status and procurement

Reported development

Plan: Connection works were expected to start in 2027 and last three years. The opinion gives the installations a 30-year operating life.

Procurement availability
Unknown / not established

Reported regulatory context

The connection environmental authorization is part of a process that precedes the two wind-farm authorization procedures; the overall impact assessment is to be updated as the operations mature. The project requires local-plan compatibility changes in six municipalities and partial downgrading of 14 classified wooded areas. The opinion reports the dossier's residual impact assessment for those local-plan changes as negligible. The environmental authority's opinion is not an authorization decision and is neither favorable nor unfavorable.

A source report alone does not establish current progress or an open buying window.

Project summary

South Brittany Shared Grid Connection for the Offshore Wind Farms (a descriptive English rendering of the project heading) is a planned shared connection for two offshore wind farms in Brittany Sud, France, linking them to the national electricity network. RTE is identified as the connection project owner. The planned works include an offshore substation, three submarine links over 45 km to a landing at Erdeven, and three underground land links over 26 km to an onshore substation at Pluvigner. The environmental authority’s opinion, dated 18 December 2025, expected connection works to start in 2027 and last three years; it gives the installations a 30-year operating life. These are forecasts in that opinion, not confirmation of the current schedule or operating status. The authority says the impact study is to be updated as the wind-farm operations mature and notes imprecision, incompleteness and inconsistencies in the study. Its opinion is neither favorable nor unfavorable and is not itself an authorization decision.

Evidence limits and unknowns

The submarine cable burial method was not yet defined in the opinion; it was to depend on dialogue with the works contractor.

The designation for wind farm 2 was still in progress following a tender, and the ports for wind-farm maintenance bases had not been selected.

The opinion describes the authorization process but does not establish that the required authorizations have been granted.

This synthesis uses supplied text from pages 2–12 and 43–44 only; pages 13–42 and graphical content were not interpreted, and OCR was not commissioned.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
France
Based on reviewed release evidence
Region
Europe
Category
Energy
Derived from released evidence
Physical assets
Electricity Transmission

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Project name

Source reported

South Brittany Shared Grid Connection for the Offshore Wind Farms

Attributed to IGEDD Autorité environnementale opinion: authority synthesis and attributed developer facts.

Source: IGEDD environmental authority native opinion text · publication date not recorded · observed 2026-10-03

Sources and evidence · IGEDD environmental authority native opinion text
Source published: Not recordedObserved: 2026-10-03

IGEDD environmental authority native opinion text
Attributed to IGEDD Autorité environnementale opinion: authority synthesis and attributed developer facts

Technical record · South Brittany Shared Grid Connection for the Offshore …
Evidence location
page:3
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
911a2446-6555-4d53-9a5a-e0af1808ef9e
Evidence reference
1f92dd67-1f15-46cd-8294-993c6cf193c0
Source revision
f242c331-b73f-4f5a-be37-747118cc5fbe
Content fingerprint
acf58c4deda82b52bd7ccd4d1a8bac4dbe1047fd05de5970f888c8abdc391e15
Source address
https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/6_-_parc_eoliens_en_zone_bretagne_sud_raccordement_mutualise_au_reseau_electrique_mecdu_cle293d4a.pdf

Scope

Planned

The shared connection includes an offshore electrical substation, three submarine links over 45 km to the landing at Erdeven, and three underground land links over 26 km to the onshore substation at Pluvigner. The offshore substation is described as 70 m square, 30 m above and 90 m below the sea surface. The submarine links are to be buried 0.3–2.5 m deep; on land, the links use trenches 0.5–0.7 m wide and about 1 m deep. The Pluvigner substation occupies 8.4 ha, with four 28 m pylons connecting it to the electricity network.

Attributed to IGEDD Autorité environnementale opinion: authority synthesis and attributed developer facts.

Source: IGEDD environmental authority native opinion text · publication date not recorded · observed 2026-10-03

Sources and evidence · IGEDD environmental authority native opinion text
Source published: Not recordedObserved: 2026-10-03

IGEDD environmental authority native opinion text
Attributed to IGEDD Autorité environnementale opinion: authority synthesis and attributed developer facts

Technical record · The shared connection includes an offshore electrical substation, …
Evidence location
page:3
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
bf7859de-609d-4e49-9b20-b28d49aa8e4d
Evidence reference
1f92dd67-1f15-46cd-8294-993c6cf193c0
Source revision
f242c331-b73f-4f5a-be37-747118cc5fbe
Content fingerprint
acf58c4deda82b52bd7ccd4d1a8bac4dbe1047fd05de5970f888c8abdc391e15
Source address
https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/6_-_parc_eoliens_en_zone_bretagne_sud_raccordement_mutualise_au_reseau_electrique_mecdu_cle293d4a.pdf

Country

Source reported

France.

Attributed to IGEDD Autorité environnementale opinion: authority synthesis and attributed developer facts.

Source: IGEDD environmental authority native opinion text · publication date not recorded · observed 2026-10-03

Sources and evidence · IGEDD environmental authority native opinion text
Source published: Not recordedObserved: 2026-10-03

IGEDD environmental authority native opinion text
Attributed to IGEDD Autorité environnementale opinion: authority synthesis and attributed developer facts

Technical record · France.
Evidence location
page:6
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
75659a55-9654-4d7a-99f2-84f02adf946b
Evidence reference
ae1b7fce-2fae-499a-8024-b0a24a5164bd
Source revision
f242c331-b73f-4f5a-be37-747118cc5fbe
Content fingerprint
acf58c4deda82b52bd7ccd4d1a8bac4dbe1047fd05de5970f888c8abdc391e15
Source address
https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/6_-_parc_eoliens_en_zone_bretagne_sud_raccordement_mutualise_au_reseau_electrique_mecdu_cle293d4a.pdf

Project ecology

Source reported

The opinion's principal environmental issues concern the integrated project, rather than being separately apportioned to each component: seabed forms and habitats, marine and terrestrial biodiversity, migratory fish, birds and bats, marine mammals, landscape and archaeological heritage, and greenhouse-gas effects. It identifies uncertainty in impact assessment, including wetlands whose individual functional effects could not be concluded from the baseline. For the connection, the opinion describes 15 monitoring measures with follow-up over ten years but no specified corrective measures if conservation objectives are not met; only 10 of 48 avoidance, reduction and compensation measures refer to four monitoring measures. The authority recommends better linkage and corrective measures.

Attributed to IGEDD Autorité environnementale opinion: authority synthesis and attributed developer facts.

Source: IGEDD environmental authority native opinion text · publication date not recorded · observed 2026-10-03

Sources and evidence · IGEDD environmental authority native opinion text
Source published: Not recordedObserved: 2026-10-03

IGEDD environmental authority native opinion text
Attributed to IGEDD Autorité environnementale opinion: authority synthesis and attributed developer facts

Technical record · The opinion's principal environmental issues concern the integrated …
Evidence location
page:3
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
9540f0cc-38e1-4654-bf06-0b7d9be971aa
Evidence reference
1f92dd67-1f15-46cd-8294-993c6cf193c0
Source revision
f242c331-b73f-4f5a-be37-747118cc5fbe
Content fingerprint
acf58c4deda82b52bd7ccd4d1a8bac4dbe1047fd05de5970f888c8abdc391e15
Source address
https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/6_-_parc_eoliens_en_zone_bretagne_sud_raccordement_mutualise_au_reseau_electrique_mecdu_cle293d4a.pdf

Current activity

Planned

Transmission of electricity from both offshore wind farms to the national electricity network through a shared marine and terrestrial connection.

Attributed to IGEDD Autorité environnementale opinion: authority synthesis and attributed developer facts.

Source: IGEDD environmental authority native opinion text · publication date not recorded · observed 2026-10-03

Sources and evidence · IGEDD environmental authority native opinion text
Source published: Not recordedObserved: 2026-10-03

IGEDD environmental authority native opinion text
Attributed to IGEDD Autorité environnementale opinion: authority synthesis and attributed developer facts

Technical record · Transmission of electricity from both offshore wind farms …
Evidence location
page:3
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
a72ce147-2985-4f51-a025-8b4d685b5fcc
Evidence reference
1f92dd67-1f15-46cd-8294-993c6cf193c0
Source revision
f242c331-b73f-4f5a-be37-747118cc5fbe
Content fingerprint
acf58c4deda82b52bd7ccd4d1a8bac4dbe1047fd05de5970f888c8abdc391e15
Source address
https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/6_-_parc_eoliens_en_zone_bretagne_sud_raccordement_mutualise_au_reseau_electrique_mecdu_cle293d4a.pdf

Delivery

Planned

Connection works were expected to start in 2027 and last three years. The opinion gives the installations a 30-year operating life.

Attributed to IGEDD Autorité environnementale opinion: authority synthesis and attributed developer facts.

Source: IGEDD environmental authority native opinion text · publication date not recorded · observed 2026-10-03

Sources and evidence · IGEDD environmental authority native opinion text
Source published: Not recordedObserved: 2026-10-03

IGEDD environmental authority native opinion text
Attributed to IGEDD Autorité environnementale opinion: authority synthesis and attributed developer facts

Technical record · Connection works were expected to start in 2027 …
Evidence location
page:9
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
c4d4026c-d1ff-470e-9d9c-6df896c17b5d
Evidence reference
ce6e779a-3cb9-4189-b3ce-578cd8bc76d1
Source revision
f242c331-b73f-4f5a-be37-747118cc5fbe
Content fingerprint
acf58c4deda82b52bd7ccd4d1a8bac4dbe1047fd05de5970f888c8abdc391e15
Source address
https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/6_-_parc_eoliens_en_zone_bretagne_sud_raccordement_mutualise_au_reseau_electrique_mecdu_cle293d4a.pdf

Location

Source reported

The offshore substation is in territorial waters at the boundary of the exclusive economic zone. The submarine connection comes ashore at Erdeven and runs to an onshore substation at Pluvigner; the project requires local-plan changes in six municipalities.

Attributed to IGEDD Autorité environnementale opinion: authority synthesis and attributed developer facts.

Source: IGEDD environmental authority native opinion text · publication date not recorded · observed 2026-10-03

Sources and evidence · IGEDD environmental authority native opinion text
Source published: Not recordedObserved: 2026-10-03

IGEDD environmental authority native opinion text
Attributed to IGEDD Autorité environnementale opinion: authority synthesis and attributed developer facts

Technical record · The offshore substation is in territorial waters at …
Evidence location
page:7
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
4e0806c8-d366-48be-bbbe-428e04856a0a
Evidence reference
be6f92e0-ebe6-4d7b-b237-610400f206a6
Source revision
f242c331-b73f-4f5a-be37-747118cc5fbe
Content fingerprint
acf58c4deda82b52bd7ccd4d1a8bac4dbe1047fd05de5970f888c8abdc391e15
Source address
https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/6_-_parc_eoliens_en_zone_bretagne_sud_raccordement_mutualise_au_reseau_electrique_mecdu_cle293d4a.pdf

Developer

Source reported

Réseau de transport d’électricité (RTE) is identified as the project owner for the connection and as responsible for the overall project's environmental impact study in the connection authorization application.

Attributed to IGEDD Autorité environnementale opinion: authority synthesis and attributed developer facts.

Source: IGEDD environmental authority native opinion text · publication date not recorded · observed 2026-10-03

Sources and evidence · IGEDD environmental authority native opinion text
Source published: Not recordedObserved: 2026-10-03

IGEDD environmental authority native opinion text
Attributed to IGEDD Autorité environnementale opinion: authority synthesis and attributed developer facts

Technical record · Réseau de transport d’électricité (RTE) is identified as …
Evidence location
page:6
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
410a87c3-2fb6-49b7-b870-ead4dae9c38f
Evidence reference
ae1b7fce-2fae-499a-8024-b0a24a5164bd
Source revision
f242c331-b73f-4f5a-be37-747118cc5fbe
Content fingerprint
acf58c4deda82b52bd7ccd4d1a8bac4dbe1047fd05de5970f888c8abdc391e15
Source address
https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/6_-_parc_eoliens_en_zone_bretagne_sud_raccordement_mutualise_au_reseau_electrique_mecdu_cle293d4a.pdf

Regulatory evidence

Source reported

The connection environmental authorization is part of a process that precedes the two wind-farm authorization procedures; the overall impact assessment is to be updated as the operations mature. The project requires local-plan compatibility changes in six municipalities and partial downgrading of 14 classified wooded areas. The opinion reports the dossier's residual impact assessment for those local-plan changes as negligible. The environmental authority's opinion is not an authorization decision and is neither favorable nor unfavorable.

Attributed to IGEDD Autorité environnementale opinion: authority synthesis and attributed developer facts.

Source: IGEDD environmental authority native opinion text · publication date not recorded · observed 2026-10-03

Sources and evidence · IGEDD environmental authority native opinion text
Source published: Not recordedObserved: 2026-10-03

IGEDD environmental authority native opinion text
Attributed to IGEDD Autorité environnementale opinion: authority synthesis and attributed developer facts

Technical record · The connection environmental authorization is part of a …
Evidence location
page:2
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
d25fb828-98b7-4aae-99cd-3482782fc52a
Evidence reference
6ccf1ecb-d480-4d2f-ad20-dec04074b13f
Source revision
f242c331-b73f-4f5a-be37-747118cc5fbe
Content fingerprint
acf58c4deda82b52bd7ccd4d1a8bac4dbe1047fd05de5970f888c8abdc391e15
Source address
https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/6_-_parc_eoliens_en_zone_bretagne_sud_raccordement_mutualise_au_reseau_electrique_mecdu_cle293d4a.pdf
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.