Southern bypass of Ernée on the RN 12 (Déviation sud d’Ernée par la RN 12).

France · Transport and logistics

In-depth research Release 1

Project scope

Plan: A bidirectional 5 km road with a 2×1 carriageway: 3.6 km of new alignment west of Ernée and 1.4 km requalification of the existing RD 31 to the east. The described works include three overtaking sections, a viaduct across the Ernée valley, reinstatement of the RD 514, five roundabouts, four cycle-route sections, agricultural and ecological access/restoration structures, six natural-flow crossings, and road-runoff collection and treatment basins. The source also describes a carpooling area linked to a road access and coach stop.

Reported status and procurement

Reported development

Intended to divert mainly transit traffic from Ernée’s centre, with expected road-safety and quality-of-life benefits, and to complement the separate north-east RD 31 bypass opened in 2019. The environmental authority cautions that the current RN 12 will still pass through the centre and that its requalification has not advanced; it considers that requalification important to achieving the project’s stated objectives. It also recommends recalibrating traffic projections using 2023 counts and experience from other bypasses, rather than relying on the unrevised initial model.

Procurement availability
Unknown / not established

Reported regulatory context

The bypass was declared of public utility by prefectural order on 30 July 2021. The source says it requires authorization under water legislation and is subject to an application for derogation from prohibitions on destroying protected species and habitats. The National Council for Nature Protection opinion was not yet available when the environmental authority deliberated on 10 October 2025. That authority’s opinion is advisory, not an authorization decision, and is neither favorable nor unfavorable.

A source report alone does not establish current progress or an open buying window.

Project summary

Southern bypass of Ernée on the RN 12

The proposed project is a 5 km bidirectional road: 3.6 km of new alignment west of Ernée and 1.4 km of requalification of the RD 31 to the east. The works described include a viaduct across the Ernée valley, cycle-route sections and road-runoff treatment basins. The project owner is the French State, through the Pays de la Loire DREAL.

The project is intended to divert mainly transit traffic from Ernée’s centre and complement the north-east RD 31 bypass opened in 2019. The environmental authority notes that the existing RN 12 would still pass through the centre and that its requalification had not advanced; it considers requalification important to achieving the stated objectives. It also recommends recalibrating traffic projections using 2023 counts and experience from other bypasses.

The opinion describes seven compensation sites and measures including 7.3 km of hedge planting for 1.8 km destroyed. It also characterizes the project’s greenhouse-gas balance as unfavorable, with construction a major contributor, and says induced development around the bypass is not adequately assessed.

The source reports a total cost of €43.5 million and financing shares associated with the 2021–2027 State–Region plan; it does not establish disbursement or financial close.

The environmental authority’s opinion, deliberated on 10 October 2025, is advisory and is not an authorization decision. The source reports the project’s declaration of public utility and required authorization processes. Source: [IGEDD environmental authority opinion](https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/2_-_deviation_sud_d_ernee_53_par_la_rn_12_2e_avis__cle77be15.pdf), dated 10 October 2025.

Evidence limits and unknowns

The opinion expected a public consultation before the end of 2025 but does not confirm whether it occurred or give later authorization outcomes. It records that the National Council for Nature Protection opinion was not available on 10 October 2025.

The source does not establish whether traffic projections were recalibrated, whether the existing RN 12 through Ernée was requalified, or the project’s subsequent construction or opening status.

The opinion does not identify construction contractors or procurement packages or report procurement status.

The source does not establish whether the reported financing shares were fully committed or disbursed.

The opinion includes maps and figures; their graphical details were not interpreted for this page.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
France
Based on reviewed release evidence
Region
Europe
Category
Transport and logistics
Derived from released evidence
Physical assets
Road

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Project name

Source reported

Southern bypass of Ernée on the RN 12 (Déviation sud d’Ernée par la RN 12).

Attributed to IGEDD environmental authority assessment and attributed developer synthesis.

Source: IGEDD environmental authority native opinion text · publication date not recorded · observed 2026-10-03

Sources and evidence · IGEDD environmental authority native opinion text
Source published: Not recordedObserved: 2026-10-03

IGEDD environmental authority native opinion text
Attributed to IGEDD environmental authority assessment and attributed developer synthesis

Technical record · Southern bypass of Ernée on the RN 12 …
Evidence location
page:3
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
be3b83b4-33f9-450a-89e3-1c797efd958d
Evidence reference
8101be92-ff96-40b6-975a-ba3dc62ae19b
Source revision
e7306b17-ec52-4c15-a27d-7228e29bcaca
Content fingerprint
8d87a6942183eab2d207e91d8c0a9b134025247d6c4d420ef01d4f2380f39304
Source address
https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/2_-_deviation_sud_d_ernee_53_par_la_rn_12_2e_avis__cle77be15.pdf

Scope

Planned

A bidirectional 5 km road with a 2×1 carriageway: 3.6 km of new alignment west of Ernée and 1.4 km requalification of the existing RD 31 to the east. The described works include three overtaking sections, a viaduct across the Ernée valley, reinstatement of the RD 514, five roundabouts, four cycle-route sections, agricultural and ecological access/restoration structures, six natural-flow crossings, and road-runoff collection and treatment basins. The source also describes a carpooling area linked to a road access and coach stop.

Attributed to IGEDD environmental authority assessment and attributed developer synthesis.

Source: IGEDD environmental authority native opinion text · publication date not recorded · observed 2026-10-03

Sources and evidence · IGEDD environmental authority native opinion text
Source published: Not recordedObserved: 2026-10-03

IGEDD environmental authority native opinion text
Attributed to IGEDD environmental authority assessment and attributed developer synthesis

Technical record · A bidirectional 5 km road with a 2×1 …
Evidence location
page:5
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
3e27d470-f093-4b90-9f9f-eca15f17ed61
Evidence reference
d3e4dd8b-8ba2-4a14-a8d7-eadf600f4d1a
Source revision
e7306b17-ec52-4c15-a27d-7228e29bcaca
Content fingerprint
8d87a6942183eab2d207e91d8c0a9b134025247d6c4d420ef01d4f2380f39304
Source address
https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/2_-_deviation_sud_d_ernee_53_par_la_rn_12_2e_avis__cle77be15.pdf

Project ecology

Source reported

The source describes effects on a bocage and watercourse setting, including destruction of 1.8 km of hedges, and impacts on habitats and agricultural land. It reports seven compensation sites and measures including hedge planting (7.3 km for 1.8 km destroyed), wetland and habitat restoration, watercourse work, ponds and ecological crossings. The environmental authority also reports an unfavorable greenhouse-gas balance, heavily affected by construction, and says induced development around the bypass is not adequately assessed; it recommends further consideration of these effects and related measures.

Attributed to IGEDD environmental authority assessment and attributed developer synthesis.

Source: IGEDD environmental authority native opinion text · publication date not recorded · observed 2026-10-03

Sources and evidence · IGEDD environmental authority native opinion text
Source published: Not recordedObserved: 2026-10-03

IGEDD environmental authority native opinion text
Attributed to IGEDD environmental authority assessment and attributed developer synthesis

Technical record · The source describes effects on a bocage and …
Evidence location
page:7
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
cf4e9dee-2773-4bb5-be24-728590542801
Evidence reference
9d765378-3f3a-4948-a103-fc2a3d8fb47f
Source revision
e7306b17-ec52-4c15-a27d-7228e29bcaca
Content fingerprint
8d87a6942183eab2d207e91d8c0a9b134025247d6c4d420ef01d4f2380f39304
Source address
https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/2_-_deviation_sud_d_ernee_53_par_la_rn_12_2e_avis__cle77be15.pdf

Current activity

Source reported

Intended to divert mainly transit traffic from Ernée’s centre, with expected road-safety and quality-of-life benefits, and to complement the separate north-east RD 31 bypass opened in 2019. The environmental authority cautions that the current RN 12 will still pass through the centre and that its requalification has not advanced; it considers that requalification important to achieving the project’s stated objectives. It also recommends recalibrating traffic projections using 2023 counts and experience from other bypasses, rather than relying on the unrevised initial model.

Attributed to IGEDD environmental authority assessment and attributed developer synthesis.

Source: IGEDD environmental authority native opinion text · publication date not recorded · observed 2026-10-03

Sources and evidence · IGEDD environmental authority native opinion text
Source published: Not recordedObserved: 2026-10-03

IGEDD environmental authority native opinion text
Attributed to IGEDD environmental authority assessment and attributed developer synthesis

Technical record · Intended to divert mainly transit traffic from Ernée’s …
Evidence location
page:3
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
e68dbf12-2f2b-47af-a710-8c848af98059
Evidence reference
8101be92-ff96-40b6-975a-ba3dc62ae19b
Source revision
e7306b17-ec52-4c15-a27d-7228e29bcaca
Content fingerprint
8d87a6942183eab2d207e91d8c0a9b134025247d6c4d420ef01d4f2380f39304
Source address
https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/2_-_deviation_sud_d_ernee_53_par_la_rn_12_2e_avis__cle77be15.pdf

Location

Source reported

Around Ernée, in the Mayenne department, Pays de la Loire, France, on the RN 12 corridor between Fougères and Alençon. The new section is west of Ernée and the RD 31 section to be requalified is to the east.

Attributed to IGEDD environmental authority assessment and attributed developer synthesis.

Source: IGEDD environmental authority native opinion text · publication date not recorded · observed 2026-10-03

Sources and evidence · IGEDD environmental authority native opinion text
Source published: Not recordedObserved: 2026-10-03

IGEDD environmental authority native opinion text
Attributed to IGEDD environmental authority assessment and attributed developer synthesis

Technical record · Around Ernée, in the Mayenne department, Pays de …
Evidence location
page:3
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
a1a1dda4-e2f2-41a6-b277-dd00eb0b2262
Evidence reference
8101be92-ff96-40b6-975a-ba3dc62ae19b
Source revision
e7306b17-ec52-4c15-a27d-7228e29bcaca
Content fingerprint
8d87a6942183eab2d207e91d8c0a9b134025247d6c4d420ef01d4f2380f39304
Source address
https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/2_-_deviation_sud_d_ernee_53_par_la_rn_12_2e_avis__cle77be15.pdf

Investment estimate

Source reported

The source gives a total project cost of €43.5 million and reports financing shares of 72.5% State, 12.5% Region, 10% Mayenne Department and 5% Ernée intercommunal community, in connection with the 2021–2027 State–Region plan. The source does not establish disbursement or financial close.

Attributed to IGEDD environmental authority assessment and attributed developer synthesis.

Source: IGEDD environmental authority native opinion text · publication date not recorded · observed 2026-10-03

Sources and evidence · IGEDD environmental authority native opinion text
Source published: Not recordedObserved: 2026-10-03

IGEDD environmental authority native opinion text
Attributed to IGEDD environmental authority assessment and attributed developer synthesis

Technical record · The source gives a total project cost of …
Evidence location
page:4
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
138ba996-2040-449f-b947-3bb954eff12e
Evidence reference
16cc5f88-a61f-41b3-8a50-e657fe7bbd3f
Source revision
e7306b17-ec52-4c15-a27d-7228e29bcaca
Content fingerprint
8d87a6942183eab2d207e91d8c0a9b134025247d6c4d420ef01d4f2380f39304
Source address
https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/2_-_deviation_sud_d_ernee_53_par_la_rn_12_2e_avis__cle77be15.pdf

Regulatory evidence

Source reported

The bypass was declared of public utility by prefectural order on 30 July 2021. The source says it requires authorization under water legislation and is subject to an application for derogation from prohibitions on destroying protected species and habitats. The National Council for Nature Protection opinion was not yet available when the environmental authority deliberated on 10 October 2025. That authority’s opinion is advisory, not an authorization decision, and is neither favorable nor unfavorable.

Attributed to IGEDD environmental authority assessment and attributed developer synthesis.

Source: IGEDD environmental authority native opinion text · publication date not recorded · observed 2026-10-03

Sources and evidence · IGEDD environmental authority native opinion text
Source published: Not recordedObserved: 2026-10-03

IGEDD environmental authority native opinion text
Attributed to IGEDD environmental authority assessment and attributed developer synthesis

Technical record · The bypass was declared of public utility by …
Evidence location
page:2
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
8cf62dff-f124-4825-b9e9-7bc428d5b585
Evidence reference
f6c6cd12-f9cb-426e-90ac-f817f04723d3
Source revision
e7306b17-ec52-4c15-a27d-7228e29bcaca
Content fingerprint
8d87a6942183eab2d207e91d8c0a9b134025247d6c4d420ef01d4f2380f39304
Source address
https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/2_-_deviation_sud_d_ernee_53_par_la_rn_12_2e_avis__cle77be15.pdf

Next milestone

Planned

A public consultation was expected before the end of 2025. The supplied source does not confirm whether it took place.

Attributed to IGEDD environmental authority assessment and attributed developer synthesis.

Source: IGEDD environmental authority native opinion text · publication date not recorded · observed 2026-10-03

Sources and evidence · IGEDD environmental authority native opinion text
Source published: Not recordedObserved: 2026-10-03

IGEDD environmental authority native opinion text
Attributed to IGEDD environmental authority assessment and attributed developer synthesis

Technical record · A public consultation was expected before the end …
Evidence location
page:9
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
c3b387ae-a81a-44c7-b47e-6a6f041c88ca
Evidence reference
5eab5d63-8906-4d29-8239-9db2db80b45d
Source revision
e7306b17-ec52-4c15-a27d-7228e29bcaca
Content fingerprint
8d87a6942183eab2d207e91d8c0a9b134025247d6c4d420ef01d4f2380f39304
Source address
https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/2_-_deviation_sud_d_ernee_53_par_la_rn_12_2e_avis__cle77be15.pdf

Implementing agency

Source reported

The French State, through the regional directorate for environment, planning and housing for Pays de la Loire (DREAL), is identified as the project owner (maître d’ouvrage).

Attributed to IGEDD environmental authority assessment and attributed developer synthesis.

Source: IGEDD environmental authority native opinion text · publication date not recorded · observed 2026-10-03

Sources and evidence · IGEDD environmental authority native opinion text
Source published: Not recordedObserved: 2026-10-03

IGEDD environmental authority native opinion text
Attributed to IGEDD environmental authority assessment and attributed developer synthesis

Technical record · The French State, through the regional directorate for …
Evidence location
page:3
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
069e42a0-0ad5-45e2-a856-a3e86480cad0
Evidence reference
8101be92-ff96-40b6-975a-ba3dc62ae19b
Source revision
e7306b17-ec52-4c15-a27d-7228e29bcaca
Content fingerprint
8d87a6942183eab2d207e91d8c0a9b134025247d6c4d420ef01d4f2380f39304
Source address
https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/2_-_deviation_sud_d_ernee_53_par_la_rn_12_2e_avis__cle77be15.pdf
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.