Project scope

Proposed grid-connected battery energy storage system rated at 450 MW / 1,800 MWh / 4 hours, with an on-site substation and O&M building. The referral describes planned overhead transmission lines to the Lower Tumut Switching Station; connection type is subject to Transgrid requirements. Associated works include upgrading the Miles Franklin Drive–Snowy Mountain Highway intersection. The referral gives Project Areas A+B as 30.10 ha, a 21.86 ha disturbance footprint and an 8.24 ha avoidance area; it notes these area calculations differ very marginally from the EPBC portal calculations because of GIS software differences.

Reported status and procurement

Reported development

Plan: The proposed lifecycle lists 4 months of pre-construction, 18 months of construction, 6 months of commissioning and post-construction, and approximately 35 years of operation.

Procurement availability
Unknown / not established

Reported regulatory context

EPBC number 2025/10200; the portal displays status “Awaiting Delegate Decision.” The portal also says project status fields may update over the next week.

A source report alone does not establish current progress or an open buying window.

Project summary

Talbingo Battery is proposed as a 450 MW / 1,800 MWh, four-hour grid-connected battery project at Talbingo, with an on-site substation, O&M building, planned grid connection and associated road-intersection works. The portal lists EPBC 2025/10200 as “Awaiting Delegate Decision” and cautions that status fields may change.

Evidence limits and unknowns

In the supplied portal observation (2026-10-17), financing, budget, contractor/EPC, procurement route and purchasing dates are not stated.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
Australia
Based on reviewed release evidence
Region
Oceania
Category
Energy
Derived from released evidence
Physical assets
Battery Storage, Electricity Transmission

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Project name

Source reported

Talbingo Battery, also described as the Talbingo BESS.

Attributed to epbcpublicportal.environment.gov.au.

Source: epbcpublicportal.environment.gov.au · publication date not recorded · observed 2026-10-17

Sources and evidence · epbcpublicportal.environment.gov.au
Source published: Not recordedObserved: 2026-10-17

epbcpublicportal.environment.gov.au
Attributed to epbcpublicportal.environment.gov.au

Technical record · Talbingo Battery, also described as the Talbingo BESS.
Evidence location
/html/body/form/div[2]/div[2]/div/div/div/div[1]/div[1]/div/text-position:141
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
b8992c57-4ae0-45e0-882f-9735a9d8fdfb
Evidence reference
4146a627-e8e4-4028-b033-2ca2230583f5
Source revision
bff9eee1-0215-4553-a8e7-eeb19cc1376f
Content fingerprint
4ac6148fe4e257a01fddad82bf548fcedfacc8c1d7e2a3e18c337ee5700b3ae8
Source address
https://epbcpublicportal.environment.gov.au/all-referrals/project-referral-summary/?id=56979373-4335-f011-8c4d-00224811099e

Scope

Planned

Proposed grid-connected battery energy storage system rated at 450 MW / 1,800 MWh / 4 hours, with an on-site substation and O&M building. The referral describes planned overhead transmission lines to the Lower Tumut Switching Station; connection type is subject to Transgrid requirements. Associated works include upgrading the Miles Franklin Drive–Snowy Mountain Highway intersection. The referral gives Project Areas A+B as 30.10 ha, a 21.86 ha disturbance footprint and an 8.24 ha avoidance area; it notes these area calculations differ very marginally from the EPBC portal calculations because of GIS software differences.

Attributed to epbcpublicportal.environment.gov.au.

Source: epbcpublicportal.environment.gov.au · publication date not recorded · observed 2026-10-17

Sources and evidence · epbcpublicportal.environment.gov.au
Source published: Not recordedObserved: 2026-10-17

epbcpublicportal.environment.gov.au
Attributed to epbcpublicportal.environment.gov.au

Technical record · Proposed grid-connected battery energy storage system rated at …
Evidence location
/html/body/form/div[2]/div[2]/div/div/div/div[2]/div[2]/div[2]/div[1]/div/div/div[1]/div/div/div/fieldset[2]/table
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
f475426f-5123-4100-93d4-3c344d7d65f2
Evidence reference
92c35053-35cb-4f47-8929-b2ff0c7e6990
Source revision
bff9eee1-0215-4553-a8e7-eeb19cc1376f
Content fingerprint
4ac6148fe4e257a01fddad82bf548fcedfacc8c1d7e2a3e18c337ee5700b3ae8
Source address
https://epbcpublicportal.environment.gov.au/all-referrals/project-referral-summary/?id=56979373-4335-f011-8c4d-00224811099e

Current activity

Planned

The proposed lifecycle lists 4 months of pre-construction, 18 months of construction, 6 months of commissioning and post-construction, and approximately 35 years of operation.

Attributed to epbcpublicportal.environment.gov.au.

Source: epbcpublicportal.environment.gov.au · publication date not recorded · observed 2026-10-17

Sources and evidence · epbcpublicportal.environment.gov.au
Source published: Not recordedObserved: 2026-10-17

epbcpublicportal.environment.gov.au
Attributed to epbcpublicportal.environment.gov.au

Technical record · The proposed lifecycle lists 4 months of pre-construction, …
Evidence location
/html/body/form/div[2]/div[2]/div/div/div/div[2]/div[2]/div[2]/div[1]/div/div/div[1]/div/div/div/fieldset[2]/table
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
719fe3e0-bb00-4013-bd71-4960f84564a4
Evidence reference
92c35053-35cb-4f47-8929-b2ff0c7e6990
Source revision
bff9eee1-0215-4553-a8e7-eeb19cc1376f
Content fingerprint
4ac6148fe4e257a01fddad82bf548fcedfacc8c1d7e2a3e18c337ee5700b3ae8
Source address
https://epbcpublicportal.environment.gov.au/all-referrals/project-referral-summary/?id=56979373-4335-f011-8c4d-00224811099e

Location

Source reported

563–571 Miles Franklin Drive, Talbingo NSW 2720, within the Snowy Valley Local Government Area; approximately 5 km south of Talbingo.

Attributed to epbcpublicportal.environment.gov.au.

Source: epbcpublicportal.environment.gov.au · publication date not recorded · observed 2026-10-17

Sources and evidence · epbcpublicportal.environment.gov.au
Source published: Not recordedObserved: 2026-10-17

epbcpublicportal.environment.gov.au
Attributed to epbcpublicportal.environment.gov.au

Technical record · 563–571 Miles Franklin Drive, Talbingo NSW 2720, within …
Evidence location
/html/body/form/div[2]/div[2]/div/div/div/div[2]/div[2]/div[2]/div[1]/div/div/div[1]/div/div/div/fieldset[2]/table
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
0dfcca98-2f7d-4e5e-9ea4-e5d5c90a304c
Evidence reference
92c35053-35cb-4f47-8929-b2ff0c7e6990
Source revision
bff9eee1-0215-4553-a8e7-eeb19cc1376f
Content fingerprint
4ac6148fe4e257a01fddad82bf548fcedfacc8c1d7e2a3e18c337ee5700b3ae8
Source address
https://epbcpublicportal.environment.gov.au/all-referrals/project-referral-summary/?id=56979373-4335-f011-8c4d-00224811099e

Developer

Planned

ACE Power, through its subsidiary Talbingo Battery Pty Ltd ATF Talbingo Battery Trust, is proposing the project.

Attributed to epbcpublicportal.environment.gov.au.

Source: epbcpublicportal.environment.gov.au · publication date not recorded · observed 2026-10-17

Sources and evidence · epbcpublicportal.environment.gov.au
Source published: Not recordedObserved: 2026-10-17

epbcpublicportal.environment.gov.au
Attributed to epbcpublicportal.environment.gov.au

Technical record · ACE Power, through its subsidiary Talbingo Battery Pty …
Evidence location
/html/body/form/div[2]/div[2]/div/div/div/div[2]/div[2]/div[2]/div[1]/div/div/div[1]/div/div/div/fieldset[2]/table
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
a937c139-716f-4373-9f4b-63d9f9622ba6
Evidence reference
92c35053-35cb-4f47-8929-b2ff0c7e6990
Source revision
bff9eee1-0215-4553-a8e7-eeb19cc1376f
Content fingerprint
4ac6148fe4e257a01fddad82bf548fcedfacc8c1d7e2a3e18c337ee5700b3ae8
Source address
https://epbcpublicportal.environment.gov.au/all-referrals/project-referral-summary/?id=56979373-4335-f011-8c4d-00224811099e

Regulatory evidence

Source reported

EPBC number 2025/10200; the portal displays status “Awaiting Delegate Decision.” The portal also says project status fields may update over the next week.

Attributed to epbcpublicportal.environment.gov.au.

Source: epbcpublicportal.environment.gov.au · publication date not recorded · observed 2026-10-17

Sources and evidence · epbcpublicportal.environment.gov.au
Source published: Not recordedObserved: 2026-10-17

epbcpublicportal.environment.gov.au
Attributed to epbcpublicportal.environment.gov.au

Technical record · EPBC number 2025/10200; the portal displays status “Awaiting …
Evidence location
/html/body/form/div[2]/div[2]/div/div/div/div[1]/div[2]/div[1]/span[2]/text-position:147
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
4a31a177-1924-490d-9cd2-8569540393fe
Evidence reference
2ae67a3c-d054-4994-aad0-219e82e8ca86
Source revision
bff9eee1-0215-4553-a8e7-eeb19cc1376f
Content fingerprint
4ac6148fe4e257a01fddad82bf548fcedfacc8c1d7e2a3e18c337ee5700b3ae8
Source address
https://epbcpublicportal.environment.gov.au/all-referrals/project-referral-summary/?id=56979373-4335-f011-8c4d-00224811099e
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.