Source-reported scope: geothermal, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Free project evidence
Explore projects
Search by scope, place or organization, then check the dated evidence before deciding what's worth pursuing.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: bioenergy, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Boysen Unit of the Pick-Sloan Missouri Basin Program
In-depth researchSource-reported scope: The unit consists of Boysen Dam, Boysen Reservoir, and Boysen Powerplant. The dam is described as a 220-foot zoned earthfill structure with a radial-gate-controlled overflow spillway and outlet works. The reservoir has 802,000 acre-feet of total controlled storage capacity at elevation 4,725 feet. The powerplant has 15,000 kW of installed capacity in two 7,500-kW units. The separate 1908 concrete dam described in the history was about 1.5 miles downstream of the present dam site and was removed in 1948; it is not part of this scope.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Brantley Project
In-depth researchSource-reported scope: The page describes Brantley as a multipurpose dam and gives conflicting completion accounts: one says the dam was completed in 1987, while another says Reclamation completed it in 1991. The page also describes Brantley Dam as lying between McMillan and Avalon and near the old McMillan site. Its account is limited to the dam and does not establish the full physical or administrative boundary of the Brantley Project.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: oil/gas, covering one generating unit (GT1-12). The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Brookhollow Avenue Data Centre Expansion, Norwest
In-depth researchSource-reported scope: Data-centre expansion, as identified by the record title.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Buffalo Rapids Project
In-depth researchSource-reported scope: An irrigation system with First and Second Divisions, described as providing irrigation water for 22,719 acres in the vicinity of Glendive, Fallon, and Terry. The First Division serves 13,254 acres and the Second Division 9,465 acres. The page describes the First Division’s Glendive Unit and extension, the Second Division’s Shirley, Terry, and Fallon Units, pumping plants, a Main Canal, separate canals and laterals, water-control structures, 62 miles of canals, and 96 miles of laterals. The page separately reports historical authorization estimates of 15,500 acres for the Glendive Unit and 3,000 acres for Glendive Extension, and an additional 6,000 acres associated with a third pumping unit; it does not reconcile these figures or their different stated bases.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Cachuma Project
In-depth researchSource-reported scope: An integrated system comprising Bradbury Dam and Lake Cachuma; the 6.4-mile Tecolote Tunnel; the 24-mile South Coast Conduit and four regulating reservoirs; and localized distribution systems with lateral pipelines and pumping plants. The Carpinteria system also includes an elevated 50,000-gallon tank. The page gives Bradbury Dam as 279 feet high from the bottom of the cutoff trench to the top, and Lake Cachuma as having a capacity of 193,300 acre-feet and a 42-mile shoreline.
Source-reported scope: geothermal, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Follow up to five projects free.
A free account keeps your follows and recorded changes alongside later company assessments.
Create free account