Skip to content
Menu
CapexCue · Public evidence · Printed 11 Nov 2026

Free project evidence

Explore projects

Search by scope, place or organization, then check the dated evidence before deciding what's worth pursuing.

866 projects

Page 30 of 35

Order: Selected first

Recursos Norte de El Teniente

In-depth research
Chile · Industrial processes

Source-reported scope: A new operating sector of El Teniente; reported estimated mineral reserves of 157 million tonnes at 0.75% copper grade, using panel caving and preconditioning.

View project dossier
Pakistan · Energy

Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.

View project dossier
France · Transport and logistics

Planned scope: Replace the existing three-span metallic railway bridge, about 143 m long, with a new deck of steel beams integrated into concrete for ballasted track. The new deck is specified as 143.92 m long, compared with 142.80 m for the existing deck, and is intended to increase clearance below the bridge by 49 cm to 6.1 m. The existing supports are to be retained and their foundations strengthened: 12 piles are specified for the Varennes-sur-Seine C3 abutment, while other supports are to be reinforced by cement-grout injection. Separately, the opinion records a temporary river-pile discrepancy: the dossier indicated 32 piles in the major riverbed, while the latest sizing was said to require 8–12; this is distinct from the 12 piles specified at C3.

View project dossier
South Africa · Energy

Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.

View project dossier
Country not established · Project category unassigned

Source-reported scope: Reported scope is limited here to Phase 2—Yurkovich Family Pavilion, including design and construction of a new acute-care tower—and Phase 3—South Tower and Ilich Pavilion renovations to existing hospital facilities for inpatient psychiatry, psychiatry assessment units, medical/surgical inpatient units, a main loading and logistics area, and clinical support functions.

View project dossier
Germany · Energy

Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.

View project dossier
Switzerland · Energy

Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.

View project dossier
Saudi Arabia · Energy

Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.

View project dossier
India · Energy

Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.

View project dossier
Colombia · Energy

Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.

View project dossier
Poland · Energy

Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.

View project dossier
Tanzania · Energy

Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.

View project dossier
United Arab Emirates · Energy

Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.

View project dossier
Germany · Energy

Planned scope: Planned 400 MW battery storage facility with at least 800 MWh capacity and the ability to deliver maximum output for at least two hours. Planned equipment includes more than 200 lithium-ion battery units, more than 100 inverters, over 50 medium-voltage transformers, two high-voltage transformers and two switch panels. It is to connect via the Hilgenberg substation, which Amprion is building less than 50 metres away. Before foundations can be laid, the 8.5-hectare site in the southern part of the industrial area requires preparation.

View project dossier

Salak Binary

In-depth research
Indonesia · Energy

Source-reported scope: New 16.6 MW geothermal generating unit using a binary-cycle system to convert residual heat (brine) into electricity.

View project dossier
Uzbekistan · Energy

Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.

View project dossier
Philippines · Energy

Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.

View project dossier
United States · Water and environment

Source-reported scope: An inter-basin system conveying water from upper tributaries of the San Juan River toward the Rio Grande Basin. The described collection system includes diversion dams, feeder conduits, siphons and tunnels, with imported water flowing down Azotea and Willow Creeks to Heron Reservoir. The project description also includes Heron Dam and Reservoir, the Pojoaque Tributary Unit with Nambe Falls Dam and Reservoir, and enlargement of the existing El Vado Dam outlet works to pass Heron releases. The source gives conflicting Oso Tunnel capacities: 650 cubic feet per second in the collection-system description and 550 cubic feet per second in its overview table; it does not resolve the discrepancy.

View project dossier
Mexico · Energy

Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.

View project dossier
South Africa · Energy

Source-reported scope: bioenergy, covering one generating unit (Sappi Saiccor ST 3). The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.

View project dossier
Saudi Arabia · Energy

Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.

View project dossier

Follow up to five projects free.

A free account keeps your follows and recorded changes alongside later company assessments.

Create free account