Seawater reverse-osmosis desalination (SWRO). The 2023 milestone paragraph reports ramping up production during final testing to a full capacity of 630,000 m³ of potable water per day; another paragraph says daily capacity is more than 630,000 m³ and uses future-tense equipment wording. The source's capacity and status descriptions are therefore inconsistent and do not establish a single unqualified capacity/status.
Reported status and procurement
Reported development
The source says the plant was already supplying the Khobar water network. It reports production ramping up to full capacity during final testing; a quoted ACCIONA director says final testing and commissioning stages were being entered.
Procurement availability
Unknown / not established
Reported procurement
SWCC awarded the construction to ACCIONA and RTCC in 2020.
A source report alone does not establish current progress or an open buying window.
Project summary
Al Khobar 2 is an SWRO desalination plant in eastern Saudi Arabia, and the article says it was already supplying the Khobar water network. The 31 JAN 2023 article reports production ramping up during final testing to 630,000 m³/day, but elsewhere gives a figure of more than 630,000 m³/day and describes equipment in future tense; its capacity and status descriptions are not consistent. The article reports that SWCC awarded construction to ACCIONA and RTCC in 2020.
Evidence limits and unknowns
The source article dated 31 JAN 2023 does not establish the plant's completion or operating status after that date.
The article does not identify the project owner or operator, state project cost or financing, or establish whether any procurement package is currently open.
Is this project a fit for your company?
Check how this project relates to what your company supplies, with evidence gaps and a next step.
Create your account for free and include your business details to get custom commercial assessments.
Project metadata
Country
Saudi Arabia Based on reviewed release evidence
Region
Middle East North Africa
Category
Water and environment Derived from released evidence
Physical assets
Desalination
Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.
Released facts and supporting evidence
Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.
Date
Source reported
The source article is dated 31 JAN 2023; it reports the construction award occurred in 2020.
Attributed to www.acciona.com.
Source: www.acciona.com · publication date not recorded · observed 2026-10-17
Sources and evidence · www.acciona.com
Source published: Not recordedObserved: 2026-10-17
Seawater reverse-osmosis desalination (SWRO). The 2023 milestone paragraph reports ramping up production during final testing to a full capacity of 630,000 m³ of potable water per day; another paragraph says daily capacity is more than 630,000 m³ and uses future-tense equipment wording. The source's capacity and status descriptions are therefore inconsistent and do not establish a single unqualified capacity/status.
Attributed to www.acciona.com.
Source: www.acciona.com · publication date not recorded · observed 2026-10-17
Sources and evidence · www.acciona.com
Source published: Not recordedObserved: 2026-10-17
The source says the plant was already supplying the Khobar water network. It reports production ramping up to full capacity during final testing; a quoted ACCIONA director says final testing and commissioning stages were being entered.
Attributed to www.acciona.com.
Source: www.acciona.com · publication date not recorded · observed 2026-10-17
Sources and evidence · www.acciona.com
Source published: Not recordedObserved: 2026-10-17
Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.
No material timeline events have been released.
Follow this project
Get project updates by email when new information is published.
Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.
DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.