Skip to content
Menu
CapexCue · Public evidence · Printed 11 Nov 2026
Explore projects / Project dossier

Baker Project

United States · Water and environment

In-depth research Release 1

Project scope

The project has Lower and Upper divisions. The Lower Division’s described federal facility is Thief Valley Dam; its carriage and distribution facilities were privately constructed. The Upper Division’s major features are Mason Dam, Phillips Lake, Lilley Pumping Plant, Lilley Relift Pumping Plant, and recreation facilities. The source also describes the dams, reservoir, and pumping plants’ dimensions and capacities. These are existing project features described by the page, not evidence of new construction.

Reported status and procurement

Reported development

The source reports construction of Thief Valley Dam beginning September 12, 1931, and completing May 6, 1932; Upper Division facilities began construction in 1965 and were completed in 1968. These are historical construction dates, not evidence of present works.

Procurement availability
Unknown / not established

A source report alone does not establish current progress or an open buying window.

Project summary

The Baker Project has Lower and Upper divisions and provides supplemental irrigation water. Its described facilities include Thief Valley Dam in the Lower Division and Mason Dam, Phillips Lake, and the Lilley pumping plants in the Upper Division. The source reports historical construction dates for Thief Valley Dam and Upper Division facilities; these do not indicate current construction.

Evidence limits and unknowns

The source page is undated. The supplied evidence snapshot was observed on 2026-10-02; that is not a source publication date. The supplied context is partial: the whole document was not reviewed, and linked documents and images were not acquired or interpreted.

Current project status, present or planned works, an upcoming milestone, procurement plans or availability, purchasing packages, and financing are not established. The Current Conditions area presents resource labels and links rather than a status report.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
United States
Based on reviewed release evidence
Region
North America
Category
Water and environment
Derived from released evidence
Physical assets
Not classified

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Project name

Source reported

Baker Project

Attributed to US Bureau of Reclamation own-government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-02

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-02

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation own-government project narrative

Technical record · Baker Project
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/div[1]/h1
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
883d34ff-58a6-42b6-9596-abffab113f30
Evidence reference
50e88b64-9bb2-49f1-8ce1-44b51add4bbb
Source revision
cde4ad81-cd52-44af-a381-48eecdd60a33
Content fingerprint
4f87678baeb4d39f10064105d57c99b785ffc02edfc6273361122981c35210ad
Source address
https://www.usbr.gov/projects/index.php?id=516

Scope

Source reported

The project has Lower and Upper divisions. The Lower Division’s described federal facility is Thief Valley Dam; its carriage and distribution facilities were privately constructed. The Upper Division’s major features are Mason Dam, Phillips Lake, Lilley Pumping Plant, Lilley Relift Pumping Plant, and recreation facilities. The source also describes the dams, reservoir, and pumping plants’ dimensions and capacities. These are existing project features described by the page, not evidence of new construction.

Attributed to US Bureau of Reclamation own-government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-02

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-02

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation own-government project narrative

Technical record · The project has Lower and Upper divisions. The …
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/div[4]/p[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
671a0cd1-8663-4b57-b99b-a6436b5ad96e
Evidence reference
ccaee2b5-ae72-456a-b394-40f366b0e080
Source revision
cde4ad81-cd52-44af-a381-48eecdd60a33
Content fingerprint
4f87678baeb4d39f10064105d57c99b785ffc02edfc6273361122981c35210ad
Source address
https://www.usbr.gov/projects/index.php?id=516

Delivery

Source reported

The source reports construction of Thief Valley Dam beginning September 12, 1931, and completing May 6, 1932; Upper Division facilities began construction in 1965 and were completed in 1968. These are historical construction dates, not evidence of present works.

Attributed to US Bureau of Reclamation own-government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-02

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-02

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation own-government project narrative

Technical record · The source reports construction of Thief Valley Dam …
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/div[6]/p[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
ac6f25ec-d4bf-4bba-a1a3-3a996c9c9371
Evidence reference
b6ae5368-55a1-4a37-8165-e9b88b0c3019
Source revision
cde4ad81-cd52-44af-a381-48eecdd60a33
Content fingerprint
4f87678baeb4d39f10064105d57c99b785ffc02edfc6273361122981c35210ad
Source address
https://www.usbr.gov/projects/index.php?id=516

Location

Source reported

East-central Oregon, in Baker County and the Baker/Powder River area. The source places the Lower Division’s service area along the Powder River northeast of Baker and the Upper Division’s service area adjacent to and north of Baker, on both sides of the Powder River.

Attributed to US Bureau of Reclamation own-government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-02

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-02

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation own-government project narrative

Technical record · East-central Oregon, in Baker County and the Baker/Powder …
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/div[1]/div[2]/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
2536f1a7-335a-4c8b-9871-2681864a2f7c
Evidence reference
d2d1f0e6-070e-48ad-b795-105739ee9e47
Source revision
cde4ad81-cd52-44af-a381-48eecdd60a33
Content fingerprint
4f87678baeb4d39f10064105d57c99b785ffc02edfc6273361122981c35210ad
Source address
https://www.usbr.gov/projects/index.php?id=516
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.