Project scope

Plan: Infrastructure BC describes a new eight-lane immersed tube tunnel that will replace the existing George Massey Tunnel. The new tunnel is described as having three vehicle lanes and one dedicated transit lane in each direction, plus a separated active transportation corridor for cyclists and pedestrians. The project also includes replacing the Deas Slough Bridge and decommissioning the existing tunnel once the new immersed tube tunnel is in operation.

Reported status and procurement

Reported development
Not established
Procurement availability
Unknown / not established

A source report alone does not establish current progress or an open buying window.

Project summary

Infrastructure BC describes the Fraser River Tunnel Project as a planned replacement for the George Massey Tunnel on Highway 99. The described scope includes a new eight-lane immersed tube tunnel, replacement of the Deas Slough Bridge, and decommissioning of the existing tunnel once the new tunnel is operating.

Evidence limits and unknowns

The selected excerpts do not establish the country, publication date, schedule, cost, current progress, opening or completion date, or procurement status.

Reading scope: this page is based on selected project-description and scope excerpts from Infrastructure BC. The original document was not supplied or authenticated, and the whole document was not reviewed.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Project name

Source reported

Fraser River Tunnel Project

Attributed to Infrastructure BC, Fraser River Tunnel Project (retained observation 4 November 2026) (external transcript).

Source: Infrastructure BC, Fraser River Tunnel Project (retained observation 4 November 2026) (external transcript) · publication date not recorded · observed 2026-11-06

Sources and evidence · Infrastructure BC, Fraser River Tunnel Project (retained observation 4 November 2026) (external transcript)
Source published: Not recordedObserved: 2026-11-06

Infrastructure BC, Fraser River Tunnel Project (retained observation 4 November 2026) (external transcript)
Attributed to Infrastructure BC, Fraser River Tunnel Project (retained observation 4 November 2026) (external transcript)

Technical record · Fraser River Tunnel Project
Evidence location
bytes:85893:86210
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
c060f3bf-28c5-49aa-a429-18b6ee41e15a
Evidence reference
16d7e702-de6d-4d68-a4af-980ba2c3ba9b
Source revision
f52353aa-1d98-4a6f-b7d4-169f29d7e198
Content fingerprint
9027b8101d3bbfa0bed9cd81a299382d2e6a1ef5e4e038d2189c81e0bbc9d2a1
Source address
https://www.infrastructurebc.com/project/fraser-river-tunnel-project/

Scope

Planned

Infrastructure BC describes a new eight-lane immersed tube tunnel that will replace the existing George Massey Tunnel. The new tunnel is described as having three vehicle lanes and one dedicated transit lane in each direction, plus a separated active transportation corridor for cyclists and pedestrians. The project also includes replacing the Deas Slough Bridge and decommissioning the existing tunnel once the new immersed tube tunnel is in operation.

Attributed to Infrastructure BC, Fraser River Tunnel Project (retained observation 4 November 2026) (external transcript).

Source: Infrastructure BC, Fraser River Tunnel Project (retained observation 4 November 2026) (external transcript) · publication date not recorded · observed 2026-11-06

Sources and evidence · Infrastructure BC, Fraser River Tunnel Project (retained observation 4 November 2026) (external transcript)
Source published: Not recordedObserved: 2026-11-06

Infrastructure BC, Fraser River Tunnel Project (retained observation 4 November 2026) (external transcript)
Attributed to Infrastructure BC, Fraser River Tunnel Project (retained observation 4 November 2026) (external transcript)

Technical record · Infrastructure BC describes a new eight-lane immersed tube …
Evidence location
bytes:85893:86210
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
b0b77718-a71c-422b-8f1e-b7e18083b5d9
Evidence reference
16d7e702-de6d-4d68-a4af-980ba2c3ba9b
Source revision
f52353aa-1d98-4a6f-b7d4-169f29d7e198
Content fingerprint
9027b8101d3bbfa0bed9cd81a299382d2e6a1ef5e4e038d2189c81e0bbc9d2a1
Source address
https://www.infrastructurebc.com/project/fraser-river-tunnel-project/

Location

Source reported

Highway 99, with the existing George Massey Tunnel identified as the tunnel to be replaced.

Attributed to Infrastructure BC, Fraser River Tunnel Project (retained observation 4 November 2026) (external transcript).

Source: Infrastructure BC, Fraser River Tunnel Project (retained observation 4 November 2026) (external transcript) · publication date not recorded · observed 2026-11-06

Sources and evidence · Infrastructure BC, Fraser River Tunnel Project (retained observation 4 November 2026) (external transcript)
Source published: Not recordedObserved: 2026-11-06

Infrastructure BC, Fraser River Tunnel Project (retained observation 4 November 2026) (external transcript)
Attributed to Infrastructure BC, Fraser River Tunnel Project (retained observation 4 November 2026) (external transcript)

Technical record · Highway 99, with the existing George Massey Tunnel …
Evidence location
bytes:85893:86210
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
1db9e93b-9f56-4280-9e4f-c168c93bc3f7
Evidence reference
16d7e702-de6d-4d68-a4af-980ba2c3ba9b
Source revision
f52353aa-1d98-4a6f-b7d4-169f29d7e198
Content fingerprint
9027b8101d3bbfa0bed9cd81a299382d2e6a1ef5e4e038d2189c81e0bbc9d2a1
Source address
https://www.infrastructurebc.com/project/fraser-river-tunnel-project/
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.