Skip to content
Menu
CapexCue · Public evidence · Printed 11 Nov 2026
Explore projects / Project dossier

Ișalnița BESS, a battery energy storage system for the Ișalnița Solar Park.

Romania · Energy

In-depth research Release 1

Project scope

Plan: Battery energy storage system planned with 20 MW installed power and 40 MWh storage capacity; designed to store electricity during periods of high renewable production and make it available when demand is higher.

Reported status and procurement

Reported development
Not established
Procurement availability
Unknown / not established

Reported procurement

An engineering, procurement and construction contract for the BESS has been signed by OMV Petrom and Simtel Team.

A source report alone does not establish current progress or an open buying window.

Project summary

The Ișalnița BESS is planned for the Ișalnița solar farm in Dolj County as a 20 MW / 40 MWh system intended to shift renewable electricity from high-production periods to times of higher demand. OMV Petrom and Simtel Team have signed an EPC contract for the system. The source article is dated September 11, 2026, and says construction was expected to take around seven months from signing; it does not provide the contract date.

Evidence limits and unknowns

The contract-signing date is not stated, so the reported seven-month construction estimate cannot be translated into a calendar completion date.

The source does not report whether BESS construction has since been completed or provide a current project-status update.

The source reports that an EPC contract has been signed, but does not state whether any additional procurement scope remains available.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
Romania
Based on reviewed release evidence
Region
Europe
Category
Energy
Derived from released evidence
Physical assets
Battery Storage

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Date

Source reported

The source article is dated September 11, 2026; this is not identified as the contract-signing date.

Attributed to www.omvpetrom.com.

Source: www.omvpetrom.com · publication date not recorded · observed 2026-10-18

Sources and evidence · www.omvpetrom.com
Source published: Not recordedObserved: 2026-10-18

www.omvpetrom.com
Attributed to www.omvpetrom.com

Technical record · The source article is dated September 11, 2026; …
Evidence location
/html/body/main/section[2]/div/div/div[1]/div/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
e58c2e67-72e7-41c4-b870-e4c15c92f776
Evidence reference
67b7c58f-0d33-4c1a-96d8-d10291915c95
Source revision
636fe467-59c7-4c87-bce3-206ce1648139
Content fingerprint
91ae0be0ac87f5670292b332da5df5bb6c94d07559e78a73ae4b5bbc8bd9235c
Source address
https://www.omvpetrom.com/en/media/latest-news/2026/isalnita-bess-battery-storage

Project name

Source reported

Ișalnița BESS, a battery energy storage system for the Ișalnița Solar Park.

Attributed to www.omvpetrom.com.

Source: www.omvpetrom.com · publication date not recorded · observed 2026-10-18

Sources and evidence · www.omvpetrom.com
Source published: Not recordedObserved: 2026-10-18

www.omvpetrom.com
Attributed to www.omvpetrom.com

Technical record · Ișalnița BESS, a battery energy storage system for …
Evidence location
/html/body/main/section[1]/div/h1
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
266682d4-9496-42bb-a3c0-cc465a1afe73
Evidence reference
afdf4657-283e-447e-bf13-4b4015d41e64
Source revision
636fe467-59c7-4c87-bce3-206ce1648139
Content fingerprint
91ae0be0ac87f5670292b332da5df5bb6c94d07559e78a73ae4b5bbc8bd9235c
Source address
https://www.omvpetrom.com/en/media/latest-news/2026/isalnita-bess-battery-storage

Scope

Planned

Battery energy storage system planned with 20 MW installed power and 40 MWh storage capacity; designed to store electricity during periods of high renewable production and make it available when demand is higher.

Attributed to www.omvpetrom.com.

Source: www.omvpetrom.com · publication date not recorded · observed 2026-10-18

Sources and evidence · www.omvpetrom.com
Source published: Not recordedObserved: 2026-10-18

www.omvpetrom.com
Attributed to www.omvpetrom.com

Technical record · Battery energy storage system planned with 20 MW …
Evidence location
/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/ul/li
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
f0b41949-2234-40c9-b2bd-4067e598cd29
Evidence reference
00b5d235-e7db-4325-815b-d0e506d1a5de
Source revision
636fe467-59c7-4c87-bce3-206ce1648139
Content fingerprint
91ae0be0ac87f5670292b332da5df5bb6c94d07559e78a73ae4b5bbc8bd9235c
Source address
https://www.omvpetrom.com/en/media/latest-news/2026/isalnita-bess-battery-storage

Location

Source reported

At the Ișalnița solar farm, Dolj County.

Attributed to www.omvpetrom.com.

Source: www.omvpetrom.com · publication date not recorded · observed 2026-10-18

Sources and evidence · www.omvpetrom.com
Source published: Not recordedObserved: 2026-10-18

www.omvpetrom.com
Attributed to www.omvpetrom.com

Technical record · At the Ișalnița solar farm, Dolj County.
Evidence location
/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
75884ce0-9338-4adc-bc0d-35e3a5413e42
Evidence reference
0b54a48a-9c13-474c-972b-b105b3660d5f
Source revision
636fe467-59c7-4c87-bce3-206ce1648139
Content fingerprint
91ae0be0ac87f5670292b332da5df5bb6c94d07559e78a73ae4b5bbc8bd9235c
Source address
https://www.omvpetrom.com/en/media/latest-news/2026/isalnita-bess-battery-storage

Contractor

Source reported

Simtel Team is named in the EPC contract signed with OMV Petrom for the battery storage system.

Attributed to www.omvpetrom.com.

Source: www.omvpetrom.com · publication date not recorded · observed 2026-10-18

Sources and evidence · www.omvpetrom.com
Source published: Not recordedObserved: 2026-10-18

www.omvpetrom.com
Attributed to www.omvpetrom.com

Technical record · Simtel Team is named in the EPC contract …
Evidence location
/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
f3a1f0d0-780e-4ef1-aa4f-9c2055b465ad
Evidence reference
0b54a48a-9c13-474c-972b-b105b3660d5f
Source revision
636fe467-59c7-4c87-bce3-206ce1648139
Content fingerprint
91ae0be0ac87f5670292b332da5df5bb6c94d07559e78a73ae4b5bbc8bd9235c
Source address
https://www.omvpetrom.com/en/media/latest-news/2026/isalnita-bess-battery-storage

Procurement

Reported as actual

An engineering, procurement and construction contract for the BESS has been signed by OMV Petrom and Simtel Team.

Attributed to www.omvpetrom.com.

Source: www.omvpetrom.com · publication date not recorded · observed 2026-10-18

Sources and evidence · www.omvpetrom.com
Source published: Not recordedObserved: 2026-10-18

www.omvpetrom.com
Attributed to www.omvpetrom.com

Technical record · An engineering, procurement and construction contract for the …
Evidence location
/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
f6bb6d16-25b0-4311-800f-d42caa392ad4
Evidence reference
0b54a48a-9c13-474c-972b-b105b3660d5f
Source revision
636fe467-59c7-4c87-bce3-206ce1648139
Content fingerprint
91ae0be0ac87f5670292b332da5df5bb6c94d07559e78a73ae4b5bbc8bd9235c
Source address
https://www.omvpetrom.com/en/media/latest-news/2026/isalnita-bess-battery-storage

Next milestone

Planned

Battery construction was expected to be completed around seven months after contract signing; the source does not give the signing date.

Attributed to www.omvpetrom.com.

Source: www.omvpetrom.com · publication date not recorded · observed 2026-10-18

Sources and evidence · www.omvpetrom.com
Source published: Not recordedObserved: 2026-10-18

www.omvpetrom.com
Attributed to www.omvpetrom.com

Technical record · Battery construction was expected to be completed around …
Evidence location
/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
645e3696-588a-4ca4-809d-f652f296ba8e
Evidence reference
0b54a48a-9c13-474c-972b-b105b3660d5f
Source revision
636fe467-59c7-4c87-bce3-206ce1648139
Content fingerprint
91ae0be0ac87f5670292b332da5df5bb6c94d07559e78a73ae4b5bbc8bd9235c
Source address
https://www.omvpetrom.com/en/media/latest-news/2026/isalnita-bess-battery-storage
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.