Project scope
Plan: Battery energy storage system planned with 20 MW installed power and 40 MWh storage capacity; designed to store electricity during periods of high renewable production and make it available when demand is higher.
Reported status and procurement
Reported development
Not established
Procurement availability
Unknown / not established
Reported procurement
An engineering, procurement and construction contract for the BESS has been signed by OMV Petrom and Simtel Team.
A source report alone does not establish current progress or an open buying window.
Project summary
The Ișalnița BESS is planned for the Ișalnița solar farm in Dolj County as a 20 MW / 40 MWh system intended to shift renewable electricity from high-production periods to times of higher demand. OMV Petrom and Simtel Team have signed an EPC contract for the system. The source article is dated September 11, 2026, and says construction was expected to take around seven months from signing; it does not provide the contract date.
Evidence limits and unknowns
The contract-signing date is not stated, so the reported seven-month construction estimate cannot be translated into a calendar completion date.
The source does not report whether BESS construction has since been completed or provide a current project-status update.
The source reports that an EPC contract has been signed, but does not state whether any additional procurement scope remains available.
Is this project a fit for your company?
Check how this project relates to what your company supplies, with evidence gaps and a next step.
Create your account for free and include your business details to get custom commercial assessments.
Project metadata
Country
Romania Based on reviewed release evidence
Region
Europe
Category
Energy Derived from released evidence
Physical assets
Battery Storage
Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.
Released facts and supporting evidence
Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.
Date
Source reported
The source article is dated September 11, 2026; this is not identified as the contract-signing date.
Attributed to www.omvpetrom.com.
Source: www.omvpetrom.com · publication date not recorded · observed 2026-10-18
Sources and evidence · www.omvpetrom.com
Source published: Not recordedObserved: 2026-10-18
Battery energy storage system planned with 20 MW installed power and 40 MWh storage capacity; designed to store electricity during periods of high renewable production and make it available when demand is higher.
Attributed to www.omvpetrom.com.
Source: www.omvpetrom.com · publication date not recorded · observed 2026-10-18
Sources and evidence · www.omvpetrom.com
Source published: Not recordedObserved: 2026-10-18
Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.
No material timeline events have been released.
Follow this project
Get project updates by email when new information is published.
Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.
DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.