Skip to content
Menu
CapexCue · Public evidence · Printed 11 Nov 2026
Explore projects / Project dossier

Koorangie Energy Storage System (KESS).

Australia · Energy

In-depth research Release 1

Project scope

Installed capacity is 185 MW / 370 MWh. The battery is connected to AusNet’s 220 kV transmission network and provides system strength to the Murray River Renewable Energy Zone; the stated objective is to increase the zone’s renewable hosting capacity by up to 300 MW.

Reported status and procurement

Reported development

Edify reports it was awarded an AEMO System Support Agreement to provide 125 MW of services, with a contracted service term of 20 years.

Procurement availability
Unknown / not established

A source report alone does not establish current progress or an open buying window.

Project summary

Koorangie Energy Storage System (KESS) is a lithium-ion battery project near Kerang in North West Victoria. The reported installed capacity is 185 MW / 370 MWh, and the battery is connected to AusNet’s 220 kV transmission network to provide system strength to the Murray River Renewable Energy Zone. The source reports commercial operations began in July 2025.

Evidence limits and unknowns

The supplied project page reports commercial operations commenced in July 2025, but does not establish whether procurement remains open, whether any equipment or service packages remain unawarded, or whether there is a current supplier opportunity.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
Australia
Based on reviewed release evidence
Region
Oceania
Category
Energy
Derived from released evidence
Physical assets
Battery Storage

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Date

Reported as actual

Commercial operations commenced in July 2025.

Attributed to edifyenergy.com.

Source: edifyenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · edifyenergy.com
Source published: Not recordedObserved: 2026-10-17

edifyenergy.com
Attributed to edifyenergy.com

Technical record · Commercial operations commenced in July 2025.
Evidence location
/html/body/div[1]/main/section[2]/div/div[1]/div/div[2]/div[1]/text-position:28
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
38a7cbba-3260-4e60-a0aa-2981043b70d6
Evidence reference
4a67ac28-aa59-489f-bc92-4994e490cfc7
Source revision
e3d2e1b8-195a-4c04-8c81-54a8ab5a58af
Content fingerprint
105ce9ee464e79c2f9e4f2c18ae8010308b95e791374fe655aa89948650b6847
Source address
https://edifyenergy.com/project/koorangie-energy-storage-system/

Project name

Source reported

Koorangie Energy Storage System (KESS).

Attributed to edifyenergy.com.

Source: edifyenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · edifyenergy.com
Source published: Not recordedObserved: 2026-10-17

edifyenergy.com
Attributed to edifyenergy.com

Technical record · Koorangie Energy Storage System (KESS).
Evidence location
/html/body/div[1]/main/section[1]/div[3]/h1
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
f5611a0a-a554-40f6-9e6a-371c5c12858d
Evidence reference
83687aeb-3207-4959-ba7b-b1122863714c
Source revision
e3d2e1b8-195a-4c04-8c81-54a8ab5a58af
Content fingerprint
105ce9ee464e79c2f9e4f2c18ae8010308b95e791374fe655aa89948650b6847
Source address
https://edifyenergy.com/project/koorangie-energy-storage-system/

Scope

Source reported

Installed capacity is 185 MW / 370 MWh. The battery is connected to AusNet’s 220 kV transmission network and provides system strength to the Murray River Renewable Energy Zone; the stated objective is to increase the zone’s renewable hosting capacity by up to 300 MW.

Attributed to edifyenergy.com.

Source: edifyenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · edifyenergy.com
Source published: Not recordedObserved: 2026-10-17

edifyenergy.com
Attributed to edifyenergy.com

Technical record · Installed capacity is 185 MW / 370 MWh. …
Evidence location
/html/body/div[1]/main/section[2]/div/div[1]/div/div[1]/div[1]/text-position:22
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
5819a23b-982c-4e34-8221-866e16cb1917
Evidence reference
30dc9baa-bdcd-44b7-af7c-77a9d5162abc
Source revision
e3d2e1b8-195a-4c04-8c81-54a8ab5a58af
Content fingerprint
105ce9ee464e79c2f9e4f2c18ae8010308b95e791374fe655aa89948650b6847
Source address
https://edifyenergy.com/project/koorangie-energy-storage-system/

Sector

Source reported

Lithium-ion battery energy storage.

Attributed to edifyenergy.com.

Source: edifyenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · edifyenergy.com
Source published: Not recordedObserved: 2026-10-17

edifyenergy.com
Attributed to edifyenergy.com

Technical record · Lithium-ion battery energy storage.
Evidence location
/html/body/div[1]/main/section[2]/div/div[2]/div/p[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
281a2ae7-c9a8-40eb-ab47-ecd1631eacbb
Evidence reference
77b0ca12-713b-42ad-b94f-39d503a066a1
Source revision
e3d2e1b8-195a-4c04-8c81-54a8ab5a58af
Content fingerprint
105ce9ee464e79c2f9e4f2c18ae8010308b95e791374fe655aa89948650b6847
Source address
https://edifyenergy.com/project/koorangie-energy-storage-system/

Current activity

Source reported

Edify reports it was awarded an AEMO System Support Agreement to provide 125 MW of services, with a contracted service term of 20 years.

Attributed to edifyenergy.com.

Source: edifyenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · edifyenergy.com
Source published: Not recordedObserved: 2026-10-17

edifyenergy.com
Attributed to edifyenergy.com

Technical record · Edify reports it was awarded an AEMO System …
Evidence location
/html/body/div[1]/main/section[2]/div/div[2]/div/p[3]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
b9cd9d23-d2df-4932-b237-e1b12b57cf2b
Evidence reference
83373c63-9ff0-45d9-bb7b-a8ede7282015
Source revision
e3d2e1b8-195a-4c04-8c81-54a8ab5a58af
Content fingerprint
105ce9ee464e79c2f9e4f2c18ae8010308b95e791374fe655aa89948650b6847
Source address
https://edifyenergy.com/project/koorangie-energy-storage-system/

Location

Source reported

North West Victoria, near the town of Kerang.

Attributed to edifyenergy.com.

Source: edifyenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · edifyenergy.com
Source published: Not recordedObserved: 2026-10-17

edifyenergy.com
Attributed to edifyenergy.com

Technical record · North West Victoria, near the town of Kerang.
Evidence location
/html/body/div[1]/main/section[2]/div/div[2]/div/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
75aadc67-7c5a-4b9f-af31-c7ec4e60c0e7
Evidence reference
8bc07328-b78c-4320-a21e-21b6a02fb92a
Source revision
e3d2e1b8-195a-4c04-8c81-54a8ab5a58af
Content fingerprint
105ce9ee464e79c2f9e4f2c18ae8010308b95e791374fe655aa89948650b6847
Source address
https://edifyenergy.com/project/koorangie-energy-storage-system/
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.