North Irish Sea Array (NISA)

Name note: NISA is the acronym used in the released project record.

Ireland · Energy

In-depth research Release 3

Project scope

Proposed offshore wind farm with two planning layout options: 35 wind turbine generators (WTGs) with maximum tip height 316 m, or 49 WTGs with maximum tip height 290 m. Offshore infrastructure includes inter-array cables, an offshore substation platform and an export cable corridor. The proposed foundation refinement removes monopiles in favour of jackets with suction buckets. Onshore infrastructure includes a grid facility west of the R132 and a proposed cable route around north Balbriggan, under the M1, to the grid connection point at Belcamp Substation.

Reported status and procurement

Reported development

Plan: Target project delivery date: 2031.

Procurement availability
Unknown / not established

Reported regulatory context

The planning application was submitted to An Bord Pleanála in 2024. The project timeline reports receipt and analysis of a Request for Further Information in 2025, followed by a response submitted to An Coimisiún Pleanála (formerly An Bord Pleanála) in 2026.

A source report alone does not establish current progress or an open buying window.

Project summary

NISA is a proposed offshore wind-energy project in Ireland, in a development area off Dublin, Meath and Louth. The closest potential turbine location is described as more than 12 km from shore (NISA project page, “The project at a glance” and “Location”). The planning proposal presents two alternative turbine layouts: 35 wind turbine generators with maximum tip height 316 m, or 49 with maximum tip height 290 m. Its proposed offshore infrastructure includes inter-array cables, an offshore substation platform and an export cable corridor. The project page describes a WTG foundation refinement from monopiles to jackets with suction buckets; the 2026 offshore construction-strategy addendum says piling is no longer included in the WTG foundation construction strategy. These are design and strategy statements, not confirmation of the final installed arrangement (NISA project page, “Offshore Design Layout”; 2026 offshore construction-strategy addendum, replacement of Table 8.1).

The proposed onshore cable route goes around north of Balbriggan, crosses under the M1 and reaches Belcamp Substation; the grid facility is planned west of the R132. The project page describes trenchless HDD beneath the coastline north of Balbriggan as the preferred approach following engagement feedback, and states that no grid facility is planned between the road and coast (NISA project page, “Onshore Landfall location,” “Onshore Horizontal Directional Drilling (HDD),” “Onshore Grid Facility” and “Onshore cable route”). The project page reports offshore surveys in 2022 and 2023, including geophysical, benthic and geotechnical investigations with cone penetration tests and boreholes. It reports that conditions within the site boundaries vary significantly and that survey information informed the design and construction-method work (NISA project page, “Seabed conditions”).

The project timeline reports a 2024 planning application, receipt and analysis of a request for further information in 2025, and a response submitted in 2026. An authority status table observed on 19 October 2026 records the application as received on 7 June 2024, the information request as dated 10 April 2025, the response as received on 29 June 2026, and further submissions invited up to 21 October 2026. This is a reported planning-process status, not a permission decision (NISA project page, “Project timeline”; authority, “Overview of Current Status of Phase 1 ORE Applications”).

The project page lists 2027 as the target for commencement of onshore construction and 2031 as the target for project delivery. Separately, the 2026 offshore addendum updates the planned offshore construction commencement from 2027 to 2028 while retaining a three-year duration; replacement Table A8.1 labels the programme years 2028, 2029 and 2030. It lists landfall, export cable, foundation, substation, array cable and turbine installation activities. The table’s foundation footnote expects installation to be achievable within one calendar year, but provides conditionally for remobilisation and completion in a subsequent year if installation takes longer than anticipated, for example due to adverse weather. These offshore programme years are distinct from the project page’s onshore commencement and overall delivery targets; none establishes that construction or delivery has been achieved (NISA project page, “Project timeline”; 2026 offshore construction-strategy addendum, replacement Table A8.1 and foundation footnote).

Evidence limits and unknowns

The supplied planning-status observation does not establish the outcome of the further-submission period ending 21 October 2026, a permission decision, or any later planning status (authority, “Overview of Current Status of Phase 1 ORE Applications”; observed 19 October 2026).

The supplied extracts do not establish whether construction has commenced, the final turbine layout or installed foundation arrangement, FID, contract awards, procurement status, or a supplier buying window (NISA project page, “Offshore Design Layout” and “Project timeline”; authority status table; 2026 offshore construction-strategy addendum).

No project-specific budget or financing arrangement is stated in the supplied extracts.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
Ireland
Based on reviewed release evidence
Region
Europe
Category
Energy
Derived from released evidence
Physical assets
Wind Power

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Project name

Source reported

NISA

Attributed to www.northirishseaarray.ie.

Source: www.northirishseaarray.ie · publication date not recorded · observed 2026-10-18

Sources and evidence · www.northirishseaarray.ie
Source published: Not recordedObserved: 2026-10-18

www.northirishseaarray.ie
Attributed to www.northirishseaarray.ie

Technical record · NISA
Evidence location
/html/body/main/div[2]/div[3]/div[2]/div[7]/div[1]/p
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
61af73c5-cc95-41b0-967c-f9e1307dc9cc
Evidence reference
91567030-3078-4fd1-9a45-e6384046a92f
Source revision
77ad9025-b8db-4113-8605-30366205cbea
Content fingerprint
b989fc3ba9ba14a9cea64f4a027ed3c2aed2441e7eadcd6e4167cab26ecc9c6f
Source address
https://www.northirishseaarray.ie/the-project/

Scope

Planned

Proposed offshore wind farm with two planning layout options: 35 wind turbine generators (WTGs) with maximum tip height 316 m, or 49 WTGs with maximum tip height 290 m. Offshore infrastructure includes inter-array cables, an offshore substation platform and an export cable corridor. The proposed foundation refinement removes monopiles in favour of jackets with suction buckets. Onshore infrastructure includes a grid facility west of the R132 and a proposed cable route around north Balbriggan, under the M1, to the grid connection point at Belcamp Substation.

Attributed to www.northirishseaarray.ie.

Source: www.northirishseaarray.ie · publication date not recorded · observed 2026-10-18

Sources and evidence · www.northirishseaarray.ie
Source published: Not recordedObserved: 2026-10-18

www.northirishseaarray.ie
Attributed to www.northirishseaarray.ie

Technical record · Proposed offshore wind farm with two planning layout …
Evidence location
/html/body/main/div[2]/div[3]/div[2]/div[4]/div[2]/div[1]/div/p[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
61511e59-d1e0-4a41-b4dd-deb0645e6ee1
Evidence reference
6218ab5b-e0de-41c3-afb0-2cbbef544a86
Source revision
77ad9025-b8db-4113-8605-30366205cbea
Content fingerprint
b989fc3ba9ba14a9cea64f4a027ed3c2aed2441e7eadcd6e4167cab26ecc9c6f
Source address
https://www.northirishseaarray.ie/the-project/

Sector

Planned

Offshore wind energy.

Attributed to www.northirishseaarray.ie.

Source: www.northirishseaarray.ie · publication date not recorded · observed 2026-10-18

Sources and evidence · www.northirishseaarray.ie
Source published: Not recordedObserved: 2026-10-18

www.northirishseaarray.ie
Attributed to www.northirishseaarray.ie

Technical record · Offshore wind energy.
Evidence location
/html/body/main/div[2]/div[3]/div[2]/div[2]/ul/li[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
998bc392-49f4-4e9e-bfdb-e65ede8e7a6c
Evidence reference
d63e529e-9d89-463e-9f8b-adabd1942a9e
Source revision
77ad9025-b8db-4113-8605-30366205cbea
Content fingerprint
b989fc3ba9ba14a9cea64f4a027ed3c2aed2441e7eadcd6e4167cab26ecc9c6f
Source address
https://www.northirishseaarray.ie/the-project/

Country

Source reported

Ireland.

Attributed to www.northirishseaarray.ie.

Source: www.northirishseaarray.ie · publication date not recorded · observed 2026-10-18

Sources and evidence · www.northirishseaarray.ie
Source published: Not recordedObserved: 2026-10-18

www.northirishseaarray.ie
Attributed to www.northirishseaarray.ie

Technical record · Ireland.
Evidence location
/html/body/main/div[2]/div[3]/div[2]/div[5]/div/div/div/ul/li[10]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
ed142add-7573-4fe6-9041-e9e395ccf3eb
Evidence reference
0696fec5-827e-4461-8b8b-41e7d9c457d4
Source revision
77ad9025-b8db-4113-8605-30366205cbea
Content fingerprint
b989fc3ba9ba14a9cea64f4a027ed3c2aed2441e7eadcd6e4167cab26ecc9c6f
Source address
https://www.northirishseaarray.ie/the-project/

Delivery

Planned

Target project delivery date: 2031.

Attributed to www.northirishseaarray.ie.

Source: www.northirishseaarray.ie · publication date not recorded · observed 2026-10-18

Sources and evidence · www.northirishseaarray.ie
Source published: Not recordedObserved: 2026-10-18

www.northirishseaarray.ie
Attributed to www.northirishseaarray.ie

Technical record · Target project delivery date: 2031.
Evidence location
/html/body/main/div[2]/div[3]/div[2]/div[5]/div/div/div/ul/li[10]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
7664613a-5aa5-44e2-8d8c-4bcd19115237
Evidence reference
0696fec5-827e-4461-8b8b-41e7d9c457d4
Source revision
77ad9025-b8db-4113-8605-30366205cbea
Content fingerprint
b989fc3ba9ba14a9cea64f4a027ed3c2aed2441e7eadcd6e4167cab26ecc9c6f
Source address
https://www.northirishseaarray.ie/the-project/

Location

Planned

Proposed development area off the coasts of Dublin, Meath and Louth; the closest potential turbine location would be more than 12 km from shore.

Attributed to www.northirishseaarray.ie.

Source: www.northirishseaarray.ie · publication date not recorded · observed 2026-10-18

Sources and evidence · www.northirishseaarray.ie
Source published: Not recordedObserved: 2026-10-18

www.northirishseaarray.ie
Attributed to www.northirishseaarray.ie

Technical record · Proposed development area off the coasts of Dublin, …
Evidence location
/html/body/main/div[2]/div[3]/div[2]/div[2]/ul/li[4]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
76827ec5-330d-4ab9-8601-1c7fb88c0ce3
Evidence reference
20d02ab3-f42b-45aa-9fcf-5f94d15629ff
Source revision
77ad9025-b8db-4113-8605-30366205cbea
Content fingerprint
b989fc3ba9ba14a9cea64f4a027ed3c2aed2441e7eadcd6e4167cab26ecc9c6f
Source address
https://www.northirishseaarray.ie/the-project/

Regulatory evidence

Source reported

The planning application was submitted to An Bord Pleanála in 2024. The project timeline reports receipt and analysis of a Request for Further Information in 2025, followed by a response submitted to An Coimisiún Pleanála (formerly An Bord Pleanála) in 2026.

Attributed to www.northirishseaarray.ie.

Source: www.northirishseaarray.ie · publication date not recorded · observed 2026-10-18

Sources and evidence · www.northirishseaarray.ie
Source published: Not recordedObserved: 2026-10-18

www.northirishseaarray.ie
Attributed to www.northirishseaarray.ie

Technical record · The planning application was submitted to An Bord …
Evidence location
/html/body/main/div[2]/div[3]/div[2]/div[5]/div/div/div/ul/li[6]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
1e47aa43-e0f2-473e-a3d2-24b9b7d1ca20
Evidence reference
429a56fe-faae-4440-8455-7e9b2907a94f
Source revision
77ad9025-b8db-4113-8605-30366205cbea
Content fingerprint
b989fc3ba9ba14a9cea64f4a027ed3c2aed2441e7eadcd6e4167cab26ecc9c6f
Source address
https://www.northirishseaarray.ie/the-project/

Next milestone

Planned

Target date for commencement of construction of onshore infrastructure: 2027.

Attributed to www.northirishseaarray.ie.

Source: www.northirishseaarray.ie · publication date not recorded · observed 2026-10-18

Sources and evidence · www.northirishseaarray.ie
Source published: Not recordedObserved: 2026-10-18

www.northirishseaarray.ie
Attributed to www.northirishseaarray.ie

Technical record · Target date for commencement of construction of onshore …
Evidence location
/html/body/main/div[2]/div[3]/div[2]/div[5]/div/div/div/ul/li[9]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
3f040265-859b-4346-a779-b01a855d3264
Evidence reference
85dd6fa4-a588-4ba8-b7f0-9bdb7d728cf5
Source revision
77ad9025-b8db-4113-8605-30366205cbea
Content fingerprint
b989fc3ba9ba14a9cea64f4a027ed3c2aed2441e7eadcd6e4167cab26ecc9c6f
Source address
https://www.northirishseaarray.ie/the-project/

Source qualifications and unresolved questions

  • Canonical facts retain their original source scope. Later source qualifications do not redefine the original asset or establish open supplier procurement.

The North Irish Sea Array (NISA) row, reference ABP-319866-24, records that the application was received 7 June, 2024; the request for further information was dated 10 April 2025; the response was received 29 June, 2026; and the FI Response was deemed significant, with notices published inviting further submissions up to 21 October, 2026. (reported). An Coimisiun Pleanala (externally supplied capture), source observed 2026-10-19; https://www.pleanala.ie/en-ie/statistics/renewable-energy-statistics-(1) The addendum replaces 2024 EIAR Table 8.1 and updates offshore construction commencement from 2027 to 2028, retaining the three-year programme duration. (planned). NISA / Ove Arup & Partners Ireland Limited (externally supplied capture), evidence received 2026-10-19; https://northirishseaarraysid.ie/wp-content/uploads/2026/06/Addendum-to-Chapter-8-Construction-Strategy-Offshore.pdf Replacement Table A8.1 labels the offshore programme years as Year 1—2028, Year 2—2029 and Year 3—2030. It lists preconstruction activities, landfall, offshore export cable installation, WTG and OSP foundation installation, offshore substation topside installation, array cable installation and WTG installation. The foundation footnote describes a contingency: installation is expected to be achievable within one calendar year, but if it takes longer than anticipated, for example because of adverse weather, remobilisation would be needed and completion would occur in the subsequent year; the timeline reflects this longer total duration. (planned). NISA / Ove Arup & Partners Ireland Limited (externally supplied capture), evidence received 2026-10-19; https://northirishseaarraysid.ie/wp-content/uploads/2026/06/Addendum-to-Chapter-8-Construction-Strategy-Offshore.pdf

Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.