East Pye Solar

United Kingdom · Energy

In-depth research Release 1

Project scope

Plan: The project comprises the construction, operation, maintenance and decommissioning of a solar photovoltaic (PV) electricity generating station and associated development, including a Battery Energy Storage System (BESS), ancillary infrastructure, customer substations and Grid Connection Infrastructure (including a new National Grid Substation). The project will have a generating capacity of 500MW

Reported status and procurement

Reported development

This project is at the examination stage. During the examination stage, anyone who has registered to have their say can submit comments at the deadlines set out in the examination timetable. You may also attend hearings, if hearings are held.

Procurement availability
Unknown / not established

A source report alone does not establish current progress or an open buying window.

Project summary

East Pye Solar is a proposed 500MW solar PV generating station with associated development, including battery storage and grid connection infrastructure. The proposed sites are south of Norwich and north of Harleston, with solar sites east of Long Stratton and a further cluster south of Great Moulton. The Planning Inspectorate source observation dated 1 October 2026 described the project as at examination stage.

Evidence limits and unknowns

The examination-stage status is dated to the 1 October 2026 source observation; later project progress has not been verified.

The supplied source does not establish a budget, appointed contractor, supplier package availability or an open procurement opportunity; the buying window is unknown.

Review was limited to the supplied project-page paragraphs. Email-containing and link-only material, linked documents and graphical content were not reviewed.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
United Kingdom
Based on reviewed release evidence
Region
Europe
Category
Energy
Derived from released evidence
Physical assets
Battery Storage, Electricity Transmission, Solar PV

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Project name

Source reported

East Pye Solar

Attributed to Planning Inspectorate.

Source: Planning Inspectorate · publication date not recorded · observed 2026-10-01

Sources and evidence · Planning Inspectorate
Source published: Not recordedObserved: 2026-10-01

Planning Inspectorate
Attributed to Planning Inspectorate

Technical record · East Pye Solar
Evidence location
native-name-name
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
574d1e53-4cf3-48ae-ad4c-eacc16cb2d2c
Evidence reference
9bebd3ba-59b9-4bc0-902a-d5002555493f
Source revision
4a964237-bcc0-4c24-9338-4ebef5d8e4cc
Content fingerprint
8cf13d0481b79e3dce4cd026ca4b2ed590d4b2bd247201f70c7063c5bb56d516
Source address
https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110014

Scope

Planned

The project comprises the construction, operation, maintenance and decommissioning of a solar photovoltaic (PV) electricity generating station and associated development, including a Battery Energy Storage System (BESS), ancillary infrastructure, customer substations and Grid Connection Infrastructure (including a new National Grid Substation). The project will have a generating capacity of 500MW

Attributed to Planning Inspectorate.

Source: Planning Inspectorate · publication date not recorded · observed 2026-10-01

Sources and evidence · Planning Inspectorate
Source published: Not recordedObserved: 2026-10-01

Planning Inspectorate
Attributed to Planning Inspectorate

Technical record · The project comprises the construction, operation, maintenance and …
Evidence location
native-scope-scope
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
6947236c-eea6-43c8-af28-caf12916e927
Evidence reference
d2f2fdba-26b8-4bd2-8447-1cf3136490ef
Source revision
4a964237-bcc0-4c24-9338-4ebef5d8e4cc
Content fingerprint
8cf13d0481b79e3dce4cd026ca4b2ed590d4b2bd247201f70c7063c5bb56d516
Source address
https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110014

Delivery

Source reported

This project is at the examination stage. During the examination stage, anyone who has registered to have their say can submit comments at the deadlines set out in the examination timetable. You may also attend hearings, if hearings are held.

Attributed to Planning Inspectorate.

Source: Planning Inspectorate · publication date not recorded · observed 2026-10-01

Sources and evidence · Planning Inspectorate
Source published: Not recordedObserved: 2026-10-01

Planning Inspectorate
Attributed to Planning Inspectorate

Technical record · This project is at the examination stage. During …
Evidence location
native-delivery-adverse_context
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
56c725d6-fd7b-40ce-a130-31af488a26e2
Evidence reference
3ef29243-8154-459c-8df3-a8b9dc19f9d8
Source revision
4a964237-bcc0-4c24-9338-4ebef5d8e4cc
Content fingerprint
8cf13d0481b79e3dce4cd026ca4b2ed590d4b2bd247201f70c7063c5bb56d516
Source address
https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110014

Location

Source reported

The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.

Attributed to Planning Inspectorate.

Source: Planning Inspectorate · publication date not recorded · observed 2026-10-01

Sources and evidence · Planning Inspectorate
Source published: Not recordedObserved: 2026-10-01

Planning Inspectorate
Attributed to Planning Inspectorate

Technical record · The project is proposed as being built across …
Evidence location
native-location-location
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
be1cf976-5ccd-487d-be0c-9cf06aed68c2
Evidence reference
fb961ec5-e129-4a17-a928-3e55281ab686
Source revision
4a964237-bcc0-4c24-9338-4ebef5d8e4cc
Content fingerprint
8cf13d0481b79e3dce4cd026ca4b2ed590d4b2bd247201f70c7063c5bb56d516
Source address
https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110014
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.