Skip to content
Menu
CapexCue · Public evidence · Printed 11 Nov 2026
Explore projects / Project dossier

Smithfield Battery Energy Storage System (BESS)

Australia · Energy

In-depth research Release 1

Project scope

Battery energy storage facility rated at 65 MW / 130 MWh; 65 MW installed capacity and two-hour storage duration.

Reported status and procurement

Reported development

Actively participates in all Frequency Control Ancillary Services (FCAS) markets.

Procurement availability
Unknown / not established

A source report alone does not establish current progress or an open buying window.

Project summary

Smithfield BESS is a 65 MW / 130 MWh battery storage facility in Smithfield, NSW, on Darug land, approximately 30 km from the Sydney CBD. The source reports that it was constructed and commissioned in 2025, reached full commercial operations on 14 November 2025, and participates in all FCAS markets.

Evidence limits and unknowns

Source observed 17 October 2026: the supplied text does not specify the asset owner or operator, procurement status, budget, supplier packages, or a next project milestone. The source does not establish an open buying window.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
Australia
Based on reviewed release evidence
Region
Oceania
Category
Energy
Derived from released evidence
Physical assets
Battery Storage

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Date

Reported as actual

Constructed and commissioned in 2025; achieved full commercial operations status on 14 November 2025.

Attributed to www.iberdrola.com.au.

Source: www.iberdrola.com.au · publication date not recorded · observed 2026-10-17

Sources and evidence · www.iberdrola.com.au
Source published: Not recordedObserved: 2026-10-17

www.iberdrola.com.au
Attributed to www.iberdrola.com.au

Technical record · Constructed and commissioned in 2025; achieved full commercial …
Evidence location
/html/body/main/div[3]/section/div/div/div/p
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
2406edb9-984b-4859-88b6-a91aabdfb558
Evidence reference
19134d5a-8915-462a-a8aa-5eef2577e436
Source revision
1226ab2e-8bae-4293-b6ec-4cabcabd41d0
Content fingerprint
679177dfaaeaa427404aff6a5db2cf98d33e72f5efa40054b3fdc7f08a9689a8
Source address
https://www.iberdrola.com.au/our-assets/asset-map/firming-assets/smithfield-bess

Project name

Source reported

Smithfield Battery Energy Storage System (BESS)

Attributed to www.iberdrola.com.au.

Source: www.iberdrola.com.au · publication date not recorded · observed 2026-10-17

Sources and evidence · www.iberdrola.com.au
Source published: Not recordedObserved: 2026-10-17

www.iberdrola.com.au
Attributed to www.iberdrola.com.au

Technical record · Smithfield Battery Energy Storage System (BESS)
Evidence location
/html/body/main/div[1]/section/div[2]/div/div/div/h2
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
ab65f1e0-7c4b-4275-bafb-69c8f3a79b47
Evidence reference
139cb08a-35b1-479c-995f-602b50ce3756
Source revision
1226ab2e-8bae-4293-b6ec-4cabcabd41d0
Content fingerprint
679177dfaaeaa427404aff6a5db2cf98d33e72f5efa40054b3fdc7f08a9689a8
Source address
https://www.iberdrola.com.au/our-assets/asset-map/firming-assets/smithfield-bess

Scope

Source reported

Battery energy storage facility rated at 65 MW / 130 MWh; 65 MW installed capacity and two-hour storage duration.

Attributed to www.iberdrola.com.au.

Source: www.iberdrola.com.au · publication date not recorded · observed 2026-10-17

Sources and evidence · www.iberdrola.com.au
Source published: Not recordedObserved: 2026-10-17

www.iberdrola.com.au
Attributed to www.iberdrola.com.au

Technical record · Battery energy storage facility rated at 65 MW …
Evidence location
/html/body/main/div[2]/section/div/div[2]/div[1]/div/h5
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
2170ce3d-4dff-4773-95f1-55b621a16faa
Evidence reference
74792a65-288a-4344-ba68-45b03f5e3d14
Source revision
1226ab2e-8bae-4293-b6ec-4cabcabd41d0
Content fingerprint
679177dfaaeaa427404aff6a5db2cf98d33e72f5efa40054b3fdc7f08a9689a8
Source address
https://www.iberdrola.com.au/our-assets/asset-map/firming-assets/smithfield-bess

Current activity

Reported as actual

Actively participates in all Frequency Control Ancillary Services (FCAS) markets.

Attributed to www.iberdrola.com.au.

Source: www.iberdrola.com.au · publication date not recorded · observed 2026-10-17

Sources and evidence · www.iberdrola.com.au
Source published: Not recordedObserved: 2026-10-17

www.iberdrola.com.au
Attributed to www.iberdrola.com.au

Technical record · Actively participates in all Frequency Control Ancillary Services …
Evidence location
/html/body/main/div[3]/section/div/div/div/p
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
ca2b4f15-d48c-4be2-a41e-2510a021ce9a
Evidence reference
19134d5a-8915-462a-a8aa-5eef2577e436
Source revision
1226ab2e-8bae-4293-b6ec-4cabcabd41d0
Content fingerprint
679177dfaaeaa427404aff6a5db2cf98d33e72f5efa40054b3fdc7f08a9689a8
Source address
https://www.iberdrola.com.au/our-assets/asset-map/firming-assets/smithfield-bess

Location

Source reported

Smithfield, NSW, on Darug land, approximately 30 km from the Sydney CBD.

Attributed to www.iberdrola.com.au.

Source: www.iberdrola.com.au · publication date not recorded · observed 2026-10-17

Sources and evidence · www.iberdrola.com.au
Source published: Not recordedObserved: 2026-10-17

www.iberdrola.com.au
Attributed to www.iberdrola.com.au

Technical record · Smithfield, NSW, on Darug land, approximately 30 km …
Evidence location
/html/body/main/div[3]/section/div/div/div/p
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
37d37fe5-3eeb-42f1-bc80-57691b21b2ca
Evidence reference
19134d5a-8915-462a-a8aa-5eef2577e436
Source revision
1226ab2e-8bae-4293-b6ec-4cabcabd41d0
Content fingerprint
679177dfaaeaa427404aff6a5db2cf98d33e72f5efa40054b3fdc7f08a9689a8
Source address
https://www.iberdrola.com.au/our-assets/asset-map/firming-assets/smithfield-bess
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.