Project scope
Battery energy storage system rated at 240 MWac / 960 MWh.
Reported status and procurement
Reported development
Construction commenced in February 2025.
Procurement availability
Unknown / not established
A source report alone does not establish current progress or an open buying window.
Project summary Summerfield BESS is a 240 MWac / 960 MWh battery energy storage project approximately 50 km east of Adelaide, South Australia. Construction commenced in February 2025. The announcement dated 13 April 2026 reports that Palisade had agreed to acquire a 100% interest from CIP through Intera, but does not report completion. It describes the project as partway through construction, while a quoted CIP statement says construction was substantially complete. Commercial operations were scheduled for late 2026.
Evidence limits and unknowns The supplied announcement, dated 13 April 2026, does not establish whether the acquisition subsequently closed or provide a later construction or operations update. It does not state procurement or tender status, project budget, EPC, or equipment suppliers.
Is this project a fit for your company?
Check how this project relates to what your company supplies, with evidence gaps and a next step.
Create your account for free and include your business details to get custom commercial assessments.
Country AustraliaBased on reviewed release evidence
Region Oceania
Category EnergyDerived from released evidence
Physical assets Battery Storage Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.
Released facts and supporting evidence Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.
The announcement is dated 13 April 2026.
Attributed to www.palisadegroup.com.
Source: www.palisadegroup.com · publication date not recorded · observed 2026-10-17
Sources and evidence · www.palisadegroup.com Source published: Not recorded Observed: 2026-10-17
www.palisadegroup.com Attributed to www.palisadegroup.com
Technical record · The announcement is dated 13 April 2026.
Evidence location /html/body/div/main/div[2]/div/article/div/div[1]/text-position:9
Claim confidence 0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference 8d340ae2-3e3a-447d-be04-7d18e15ffac9
Evidence reference 5defba1c-a93c-47e4-af73-72f173665191
Source revision 8a7c635b-e5e6-4255-b7d0-a330be9c4207
Content fingerprint b64e7154292b3c9e2928aac341d351221189ece4dd063f81a4e853d617ffec68
Source address https://www.palisadegroup.com/palisade-signs-transaction-to-acquire-second-large-scale-battery-through-intera-renewables/
Summerfield Battery Energy Storage System (Summerfield BESS).
Attributed to www.palisadegroup.com.
Source: www.palisadegroup.com · publication date not recorded · observed 2026-10-17
Sources and evidence · www.palisadegroup.com Source published: Not recorded Observed: 2026-10-17
www.palisadegroup.com Attributed to www.palisadegroup.com
Technical record · Summerfield Battery Energy Storage System (Summerfield BESS).
Evidence location /html/body/div/main/div[2]/div/article/div/p[1]
Claim confidence 0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference c2bc2bea-abee-4979-ad31-5707cb94caf8
Evidence reference b9bf4f11-a9fa-48c0-810a-014145292fd7
Source revision 8a7c635b-e5e6-4255-b7d0-a330be9c4207
Content fingerprint b64e7154292b3c9e2928aac341d351221189ece4dd063f81a4e853d617ffec68
Source address https://www.palisadegroup.com/palisade-signs-transaction-to-acquire-second-large-scale-battery-through-intera-renewables/
Palisade Investment Partners reached an agreement to acquire a 100% interest from CIP through Intera Renewables; the article does not report that the acquisition was completed.
Attributed to www.palisadegroup.com.
Source: www.palisadegroup.com · publication date not recorded · observed 2026-10-17
Sources and evidence · www.palisadegroup.com Source published: Not recorded Observed: 2026-10-17
www.palisadegroup.com Attributed to www.palisadegroup.com
Technical record · Palisade Investment Partners reached an agreement to acquire …
Evidence location /html/body/div/main/div[2]/div/article/div/div[1]/text-position:9
Claim confidence 0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference fbfc36c4-2afb-487b-a016-2e70bdc6c0e7
Evidence reference 5defba1c-a93c-47e4-af73-72f173665191
Source revision 8a7c635b-e5e6-4255-b7d0-a330be9c4207
Content fingerprint b64e7154292b3c9e2928aac341d351221189ece4dd063f81a4e853d617ffec68
Source address https://www.palisadegroup.com/palisade-signs-transaction-to-acquire-second-large-scale-battery-through-intera-renewables/
Battery energy storage system rated at 240 MWac / 960 MWh.
Attributed to www.palisadegroup.com.
Source: www.palisadegroup.com · publication date not recorded · observed 2026-10-17
Sources and evidence · www.palisadegroup.com Source published: Not recorded Observed: 2026-10-17
www.palisadegroup.com Attributed to www.palisadegroup.com
Technical record · Battery energy storage system rated at 240 MWac …
Evidence location /html/body/div/main/div[2]/div/article/div/p[2]
Claim confidence 0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference ed5a2ccb-0c2f-4718-853e-397a131729ca
Evidence reference 55de4d6d-d111-4965-be5e-8c78677b500b
Source revision 8a7c635b-e5e6-4255-b7d0-a330be9c4207
Content fingerprint b64e7154292b3c9e2928aac341d351221189ece4dd063f81a4e853d617ffec68
Source address https://www.palisadegroup.com/palisade-signs-transaction-to-acquire-second-large-scale-battery-through-intera-renewables/
Energy storage.
Attributed to www.palisadegroup.com.
Source: www.palisadegroup.com · publication date not recorded · observed 2026-10-17
Sources and evidence · www.palisadegroup.com Source published: Not recorded Observed: 2026-10-17
www.palisadegroup.com Attributed to www.palisadegroup.com
Technical record · Energy storage.
Evidence location /html/body/div/main/div[2]/div/article/div/p[2]
Claim confidence 0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference 05523636-d6bf-4218-90ac-1aed450e4b0d
Evidence reference 55de4d6d-d111-4965-be5e-8c78677b500b
Source revision 8a7c635b-e5e6-4255-b7d0-a330be9c4207
Content fingerprint b64e7154292b3c9e2928aac341d351221189ece4dd063f81a4e853d617ffec68
Source address https://www.palisadegroup.com/palisade-signs-transaction-to-acquire-second-large-scale-battery-through-intera-renewables/
Construction commenced in February 2025.
Attributed to www.palisadegroup.com.
Source: www.palisadegroup.com · publication date not recorded · observed 2026-10-17
Sources and evidence · www.palisadegroup.com Source published: Not recorded Observed: 2026-10-17
www.palisadegroup.com Attributed to www.palisadegroup.com
Technical record · Construction commenced in February 2025.
Evidence location /html/body/div/main/div[2]/div/article/div/p[2]
Claim confidence 0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference aa8a074e-8e04-4a39-861f-f7319e587669
Evidence reference 55de4d6d-d111-4965-be5e-8c78677b500b
Source revision 8a7c635b-e5e6-4255-b7d0-a330be9c4207
Content fingerprint b64e7154292b3c9e2928aac341d351221189ece4dd063f81a4e853d617ffec68
Source address https://www.palisadegroup.com/palisade-signs-transaction-to-acquire-second-large-scale-battery-through-intera-renewables/
Approximately 50 km east of Adelaide, South Australia, Australia.
Attributed to www.palisadegroup.com.
Source: www.palisadegroup.com · publication date not recorded · observed 2026-10-17
Sources and evidence · www.palisadegroup.com Source published: Not recorded Observed: 2026-10-17
www.palisadegroup.com Attributed to www.palisadegroup.com
Technical record · Approximately 50 km east of Adelaide, South Australia, …
Evidence location /html/body/div/main/div[2]/div/article/div/p[2]
Claim confidence 0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference c72050b8-2c79-46dc-af45-42c56bb9a725
Evidence reference 55de4d6d-d111-4965-be5e-8c78677b500b
Source revision 8a7c635b-e5e6-4255-b7d0-a330be9c4207
Content fingerprint b64e7154292b3c9e2928aac341d351221189ece4dd063f81a4e853d617ffec68
Source address https://www.palisadegroup.com/palisade-signs-transaction-to-acquire-second-large-scale-battery-through-intera-renewables/
Copenhagen Infrastructure Partners (CIP) developed the project.
Attributed to www.palisadegroup.com.
Source: www.palisadegroup.com · publication date not recorded · observed 2026-10-17
Sources and evidence · www.palisadegroup.com Source published: Not recorded Observed: 2026-10-17
www.palisadegroup.com Attributed to www.palisadegroup.com
Technical record · Copenhagen Infrastructure Partners (CIP) developed the project.
Evidence location /html/body/div/main/div[2]/div/article/div/p[2]
Claim confidence 0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference c88cda56-b32c-4210-8fd7-ef6b56666e83
Evidence reference 55de4d6d-d111-4965-be5e-8c78677b500b
Source revision 8a7c635b-e5e6-4255-b7d0-a330be9c4207
Content fingerprint b64e7154292b3c9e2928aac341d351221189ece4dd063f81a4e853d617ffec68
Source address https://www.palisadegroup.com/palisade-signs-transaction-to-acquire-second-large-scale-battery-through-intera-renewables/
Commercial operations were scheduled to commence in late 2026.
Attributed to www.palisadegroup.com.
Source: www.palisadegroup.com · publication date not recorded · observed 2026-10-17
Sources and evidence · www.palisadegroup.com Source published: Not recorded Observed: 2026-10-17
www.palisadegroup.com Attributed to www.palisadegroup.com
Technical record · Commercial operations were scheduled to commence in late …
Evidence location /html/body/div/main/div[2]/div/article/div/p[2]
Claim confidence 0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference e9e414d0-df0d-4910-a128-8a06819b4f34
Evidence reference 55de4d6d-d111-4965-be5e-8c78677b500b
Source revision 8a7c635b-e5e6-4255-b7d0-a330be9c4207
Content fingerprint b64e7154292b3c9e2928aac341d351221189ece4dd063f81a4e853d617ffec68
Source address https://www.palisadegroup.com/palisade-signs-transaction-to-acquire-second-large-scale-battery-through-intera-renewables/
Source report history Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.
No material timeline events have been released.
Organizations and roles
Copenhagen Infrastructure Partners (CIP) developed the project. Source-reported developer · Evidence
A documented role does not confirm who buys a particular equipment package.
Research coverage
Includes dedicated project research reviewed and incorporated into this dossier.
Latest research update published: 17 Oct 2026
Subsequent research updates: 0
Evidence and updates
Overview depth and evidence gaps This overview presents supported project scope and source-reported information. Further research can add detail on:
Supplier-specific buying responsibility and equipment timing require separate assessment. Oldest supporting observation: 2026-10-17 · newest supporting observation: 2026-10-17. Review time does not freshen source evidence.
Source, observation and release dates · structured source date unavailable
Source report dates Structured source date unavailable · 1 source revision without a structured report date
Source captured 17 Oct 2026
Dossier released 17 Oct 2026
Source event/report wording remains with each fact. Capture and release dates do not establish a new project event.
How to read evidence limits “Not observed” means no supporting evidence in this release, not that the event did not happen.
Dossier updates
These are CapexCue's recorded public dossier releases, not project event dates. Up to 20 releases are listed.
First recorded dossier release. This does not establish that the project is new or unchanged.
Release 1 · dossier released 17 Oct 2026, 12:58 UTC
Release and method
Oldest supporting observation 2026-10-17
Dossier released 17 Oct 2026, 12:58 UTC
Method Versioned source, claim and public-policy decisions Publication policy accepted-destination-v1 · dossier-v1
Stable project reference: 2f927377-6958-44b3-8a3a-2741f30fa313
Share this dossier
Share the current dossier link, or cite this release.
Copy link
Copy citation
Link and citation for manual copying
Current dossier link
Citation for this release
The link opens the current dossier. The citation identifies release 1; it is not a permanent revision link.
Data and exports
These files include the released public facts, qualifications, source references and CapexCue citation.
Follow this project
Get project updates by email when new information is published.
Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.
DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.